Original source · versioned page text
Attachment 4 - Officer Report Dated 12 September 2023
Very large file (71.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 62, section 1. The text section number identifies this passage in the reader.
Bus Setdown Upon Entry Bus Setdown
Village 3a Firepit Overall View
Revision Project Architect Stage Project No.
01 Development Approval 25/08/2022 CYC Noosa Campsite CG DEVELOPMENT APPROVAL 1302-01 Renders - Village 3
48 Kabi Road Cootharaba QLD
Client
Christian Youth Council
Drawn
MF/MB
Status
PRE-CONSTRUCTION (NOT FOR CONSTRUCTION)
Scale
at A1 A-DA-V3-22.01 01
(07) 3251 6900 [email protected] Elevation Architecture Pty Ltd ACN 606 170 807 © Copyright reserved this document is and shall remain the property of Elevation Architecture. Unauthorised use of this document in any form whatsoever is prohibited. All information to be printed in colour. Figured dimensions take precedence over scale dimensions. Contractors must verify all dimensions on site before commencing any work or making shop drawings. P:\Data 1\1302-01 CYC Noosa Campsite\5.2 Development Application\5.2.1 ArchiCAD\1302-01_Village 3 DA 24.pln
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.