Skip to the record
Accept no substitutions.

Original source · versioned page text

2016-06-16 Special Meeting Agenda

of 149

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                                                                                                                                Code Fees      Impact Fees
Development Assessment
                                                                                                                                 2016/17         2016/17

      Extension to Relevant Period

      Minor matters (as determined by Manager Planning & Environment e.g. Duplex)                                               $   1,431.00   $       -

      More substantial matters (as determined by Manager Planning & Environment e.g. Multiple dwelling)                         $   2,406.00   $       -


      Major matter (as determeind by Manager, Planning & Environment) 25% of applicable development application fee

7.2   Pre Approval Process

      Change to Development Application to increase or decrease the size or scale of development (e.g. total use area,
      number of lots or Gross Floor Area).                                                                                             POA     $       -
      NOTE: The fee will be based on the type of development and at what stage in the IDAS process the change was made
      to the application.

7.3   Concurrence Agency Assessment & Building Works

      Concurrence Agency Assessment (Schedule 4 and 7 Sustainable Planning Regulation 2009) Class 1a and 10 (as
      classified by BCA).                                                                                                       $   1,124.00   $       -

      Concurrence Agency Assessment (Schedule 4 and 7 Sustainable Planning Regulation 2009) Class 1(a)(ii) and 9b (as
      classified by BCA) (ie. Duplex).                                                                                          $   2,405.00   $       -

      Building works affected by the Heritage Overlay                                                                           $     871.00   $       -
      Building works not associated with an MCU for a Detached House                                                            $     871.00   $       -
      Building works not associated with an MCU                                                                                 $   2,428.00   $       -

7.4   Advertising Signs

      Low/Medium Impact Sign & General Sign (per sign)                                                                          $     774.00   $       -
      High Impact Sign (per sign, capped at $21,000)                                                                            $   1,619.00   $       -
      Impounded Signs (per sign)                                                                                                $     122.00   $       -

7.5   Reconfiguration of a Lot
      Minimum fee applies for any matter relating to a decision for a development application and requiring a report to be
      placed before Council that is not otherwise defined in the Schedule.                                                      $   1,431.00   $       -
      The fee for any matter relating to a decision for a development application, or other matter not listed in the Schedule
      and not requiring a report to Council                                                                                     $    871.00    $       -

      Fee per lot, 1-5 lots                                                                                                     $   1,382.00   $       -
      Fee per lot, 6-20 lots                                                                                                    $   1,086.00   $       -
      Fee per lot, 21-50 lots                                                                                                   $     487.00   $       -
      Fee per lot, 51-100 lots                                                                                                  $     274.00   $       -
      Fee per lot, more than 100 lots                                                                                           $     270.00   $       -

      Boundary Realignment base fee                                                                                             $   2,161.00   $       -

      Assessment of Development Lease Subdivision Plans
      • as for Application Fee Code

      Easement Application Fees base fee                                                                                        $   3,718.00   $       -

      Reconfigure to create a Community Title Scheme and Multiple Lease where a Material Change of Use pre determines
      development
      Fee per lot                                                                                                               $    294.00    $       -

7.6   Subdivision Plans/Building Format Plans & Related Documents
      Building Format Plans (up to 25 lots)
      Base Fee                                                                                                                  $    489.00    $       -
      Fee per lot, up to 25 lots                                                                                                $    170.00    $       -

      Building Format Plans Base Fee (more than 25 lots)
      Base Fee                                                                                                                  $   1,724.00   $       -
      Fee per lot, more than 25 lots                                                                                            $     121.00   $       -

      Endorsement of Subdivision Plans
      Base Fee                                                                                                                  $    489.00    $       -
      Fee per lot                                                                                                               $    170.00    $       -


      Sealing or endorsement of a Community Management Statement (not applicable if lodged with a Subdivision Plan)
      Per Document                                                                                                              $    489.00    $       -

      Sealing or endorsing of legal documents, and/or the coordination of Sealing or Endorsement of legal documents eg
      environmental covenants, access easements, drainage easements or water and sewerage easements
      Per Document                                                                                                              $    489.00    $       -

      Re-endorsement of plans after expiry
      Per Plan                                                                                                                  $    306.00    $       -

      Assessment, co-ordination of uncompleted works bonds                                                                      $    871.00    $       -




                                                                                                                                                    Page 19
Log in to download the original file

2016-06-16 Special Meeting Agenda(PDF, 7MB).pdf · 7.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.