NOOSA COUNCIL CAPITAL PROGRAM
RENEWAL PROJECTS 2016/17
Total Council
Ref. Program Description Grants External Funds Levy Reserves Other Reserves General Rates Funds Project Total
TOTAL CAPITAL PROGRAM $ 1,791,000 $ 1,522,000 $ 230,000 $ 466,000 $ 12,613,555 $ 13,309,555 $ 16,622,555
CAPITAL WORKS $1,776,000 $1,522,000 $230,000 $216,000 $10,555,975 $11,001,975 $14,299,975
R1 Bridges Whole of Shire, bridge replacement program - planning and design $ 100,000 $ 100,000 $ 100,000
R2 Coastal, Canals & Waterways Noosa Heads, Noosa Main Beach sand pumping pipe replacement $ 50,000 $ 50,000 $ 50,000
R3 Coastal, Canals & Waterways Whole of Shire, dune fencing rehabilitation $ 20,000 $ 20,000 $ 20,000
R4 Community Facilities Noosaville Library, refurbishment planning and design $ 50,000 $ 50,000 $ 50,000
R5 Community Facilities Tewantin, Noosa Gallery artworks storage $ 25,000 $ 25,000 $ 25,000
R6 Community Facilities Noosa Heads, Lions Park public amenities refurbishment $ 95,000 $ 95,000 $ 95,000
R8 Community Facilities Noosaville, Noosa Leisure Centre floor cleaner $ 11,200 $ 11,200 $ 11,200
R9 Community Facilities Peregian Beach, Surf Club publc amenities design $ 25,000 $ 25,000 $ 25,000
R10 Community Facilities Noosaville, Noosa Leisure Centre replacement of stadium lights $ 31,500 $ 31,500 $ 31,500
R11 Community Facilities Noosaville, Wallace Park precinct signage $ 10,000 $ 10,000 $ 10,000
R12 Community Facilities Noosa Heads, The J sound and lighting equipment $ 30,000 $ 30,000 $ 30,000
R13 Community Facilities Cooroy Library, repairs to strip lighting $ 25,000 $ 25,000 $ 25,000
R14 Community Facilities Noosaville, Noosa Leisure Centre café area floor resurfacing $ 6,275 $ 6,275 $ 6,275
R15 Community Facilities Cooroy, Mill Place boiler house remedial works, stage 3 $ 180,000 $ 180,000 $ 180,000
R16 Gravel Road Network Whole of Shire, gravel road re-sheeting $ 410,000 $ 410,000 $ 410,000
R18 Holiday Parks Noosa North Shore, Beachfront Campground redevelopment, detailed design $ 110,000 $ 110,000 $ 110,000
R19 Holiday Parks Noosaville, Noosa River Holiday Park small amenities replacement $ 530,000 $ 530,000 $ 530,000
R20 Holiday Parks Noosaville, Noosa Rivery Holiday Park large amenities refurbishment $ 180,000 $ 180,000 $ 180,000
R21 Holiday Parks Boreen Point Camp Ground electrical mains board replacement $ 27,500 $ 27,500 $ 27,500
R22 Holiday Parks Boreen Point Camp Ground main amenities plumbing and tapware $ 27,500 $ 27,500 $ 27,500
R23 Parks & Playgrounds Noosaville, Gympie Terrace park furniture renewals $ 140,000 $ 140,000 $ 140,000
R24 Parks & Playgrounds Whole of Shire, park furniture renewals $ 50,000 $ 50,000 $ 50,000
R25 Parks & Playgrounds Whole of Shire, park shelters renewals $ 45,000 $ 45,000 $ 45,000
R26 Parks & Playgrounds Whole of Shire, playgrounds renewals $ 100,000 $ 100,000 $ 100,000
R27 Parks & Playgrounds Pomona, skate park shade sail $ 25,000 $ 25,000 $ 25,000
R28 Parks & Playgrounds Sunshine Beach, skate park refurbishment $ 200,000 $ 200,000 $ 200,000
R29 Parks & Playgrounds Noosaville, Munna Park basketball court replacement $ 40,000 $ 40,000 $ 40,000
R30 Parks & Playgrounds Noosaville, Wyuna Drive playground renewal $ 85,000 $ 85,000 $ 85,000
R31 Pathways & Enabling Facilities Noosa Heads, Park Road boardwalk construction $ 1,500,000 $ 1,500,000 $ 1,500,000
R32 Pathways & Enabling Facilities Noosa Heads, Main Beach boardwalk construction $ 200,000 $ 200,000 $ 200,000
R33 Public Transport Infrastructure Whole of Shire, bus stops disability compliance program $ 500,000 $ 500,000 $ 500,000 $ 1,000,000
R34 Sealed Road Network Whole of Shire, road reseal and rehabilitation $ 1,272,000 $ 2,728,000 $ 2,728,000 $ 4,000,000
R35 Streetscapes & Road Corridors Peregian Beach, Peregian Square pathways and hard landscaping $ 10,000 $ 10,000 $ 10,000
R36 Stormwater Drainage Cootharaba, Kinmond Creek Road Sandy Creek culvert $ 750,000 $ 750,000 $ 750,000
R37 Stormwater Drainage Whole of Shire, stormwater pit structure renewal $ 125,000 $ 125,000 $ 125,000
R38 Stormwater Drainage Cootharaba, Kinmond Creek Road Eastern Branch culvert $ 500,000 $ 500,000 $ 500,000
R39 Stormwater Drainage Whole of Shire, stormwater renewal $ 250,000 $ 250,000 $ 250,000
R40 Stormwater Drainage Noosaville, Thomas Street & Gympie Terrace culverts $ 350,000 $ 350,000 $ 350,000
R41 Stormwater Drainage Whole of Shire, kerb and channel renewal $ 30,000 $ 30,000 $ 30,000
R42 Stormwater Drainage Whole of shire priority 1 bioretention / water sensitive urban design $ 80,000 $ 80,000 $ 80,000
R43 Transport & Infrastructure Management Tewantin, Hilton Terrace & Ernest Street intersection $ 587,500 $ 250,000 $ 587,500 $ 587,500 $ 1,425,000
R44 Transport & Infrastructure Management Castaways Beach, David Low Way safety and corridor improvements $ 366,000 $ 109,000 $ 109,000 $ 475,000
R45 Transport & Infrastructure Management Whole of Shire, forward planning and design - construction ready designs $ 122,500 $ 277,500 $ 277,500 $ 400,000
R46 Transport & Infrastructure Management Tewantin, Cooroy Noosa Road improvements, stage 4 $ 200,000 $ 160,000 $ 160,000 $ 360,000
R47 Waste Management Noosaville Landfill entrance road to Briteside, stage 2 $ 165,000 $ 165,000 $ 165,000
R48 Waste Management Noosaville Landfill gravity sewer from holding tank at Cleanaway depot $ 25,000 $ 25,000 $ 25,000
R49 Waste Management Noosaville Landfill entrance signage and landscaping $ 26,000 $ 26,000 $ 26,000
OTHER CAPITAL $ 15,000 $ - $ - $ 250,000 $ 2,057,580 $ 2,307,580 $ 2,322,580
R50 Asset Management Whole of Shire, asset condition assessments $ 250,000 $ 250,000 $ 250,000
R51 Asset Management Whole of Shire, pavement system and analysis for forward reseal program $ 100,000 $ 100,000 $ 100,000
R52 Asset Management Whole of Shire, annual Level 3 bridge inspection program $ 40,000 $ 40,000 $ 40,000
R53 Asset Management Whole of Shire, CCTV drainage program $ 125,000 $ 125,000 $ 125,000
R54 Transport & Infrastructure Management Whole of Shire, review of standard drawings $ 25,000 $ 25,000 $ 25,000
R55 Fleet & Plant Replacement Whole of Shire, fleet replacements $ 15,000 $ 250,000 $ 1,500,000 $ 1,750,000 $ 1,765,000
R56 Information Technology Whole of Shire, meeting room projectors and smart televisions $ 17,580 $ 17,580 $ 17,580
ECM_20079360_v1_Capital Works Program 2016-17 FINAL xlsx.xlsx Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.