Original source · versioned page text
MCU14/0056 Traffic Addendum Att F - Information response
PEKOL TRAFFIC & TRANSPORT Myall Street / Site Access The SIDRA analysis of the Myall Street / Site Access priority intersection was undertaken using the intersection layout as shown in Figure 4. The results of these analyses are attached in Appendix E, and are summarised in Table 6. The following gap acceptance parameters have been adopted for this intersection: == Right hand turn from major road: critical gap — 5 seconds; follow-up headway - 3 seconds == Left hand turn from minor road: critical gap — 5 seconds; follow-up headway — 3 seconds == Right hand turn from minor road: critical gap — 6.5 seconds; follow-up headway - 4 seconds Figure 4: SITE ACCESS LAYOUT f Myall Street (North) ss000y 21S Myall Street (South) Table 6: MYALL STREET / SITE ACCESS INTERSECTION OPERATIONS Evening Peak 2017 Post Development 37% 1.4 Site Access - Right 2027 Post Development 48% 1.9 Site Access - Right Saturday Peak 2017 Post Development 25% 0.9 Site Access - Right 2027 Post Development 31% 1.2 Site Access - Right P:\2012-13\13-082 MYALL STREET, COOROY\REPORTS\INFORMATION REQUEST\MYALL STREET COOROY IR RESPONSE.DOCX 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.