Skip to the record
Search everything, all in one place.

Original source · versioned page text

MCU14/0056 Traffic Addendum Att F - Information response

of 84

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

LANE SUMMARY
     Site: 2027 PM Post Development
Myall Street / Site Access Intersection
14-082 Myall Street, Cooroy
2027 PM Post-Development
Giveway / Yield (Two-Way)



 Lane Use and Performance
               Demand Flows                 Deg.    Lane     Average      Level of     95% Back of Queue         Lane     Lane Cap. Prob.
                  Total    HV      Cap.     Satn     Util.    Delay       Service         Veh        Dist        Config   Length Adj. Block.
                 veh/h      %     veh/h      v/c      %          sec                                   m                      m   %       %
 South: Myall Street (South)
 Lane 1              114    4.0    1806    0.063     100          5.6      LOS A            0.0           0.0    Short       70   0.0    0.0
 Lane 2              465    4.0    1901    0.245     100          0.0      LOS A            0.0           0.0     Full      500   0.0    0.0
 Approach            579    4.0            0.245                  1.1          NA           0.0           0.0

 North: Myall Street (North)
 Lane 1              474    4.0    1901    0.249     100          0.0      LOS A            0.0           0.0     Full      500   0.0    0.0
 Lane 2               77    4.0     569    0.135     100         10.0      LOS B            0.5           3.4    Short       50   0.0    0.0
 Approach            551    4.0            0.249                  1.4          NA           0.5           3.4

 West: Site Access
 Lane 1               77    4.0     775    0.099     100          8.2      LOS A            0.3           2.5     Full      500   0.0    0.0
 Lane 2              115    4.0     240    0.477     100         25.0      LOS D            1.9         14.0     Short       20   0.0    0.0
 Approach            192    4.0            0.477                 18.3      LOS C            1.9         14.0

 Intersection      1321     4.0            0.477                  3.7          NA           1.9         14.0


Level of Service (LOS) Method: Delay (HCM 2000).
Lane LOS values are based on average delay per lane.
Minor Road Approach LOS values are based on average delay for all lanes.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road lanes.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.


Processed: Wednesday, 24 December 2014 1:31:18 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd
SIDRA INTERSECTION 6.0.24.4877                           www.sidrasolutions.com
Project: P:\2012-13\13-082 Myall Street, Cooroy\Calcs\SIDRA\Myall St - Site Access\Myall St - Site Access.sip6
8000122, 6016988, ADAM PEKOL CONSULTING, PLUS / 1PC
Log in to download the original file

MCU14_0056 Traffic Addendum Att F - Information response.pdf · 7.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.