4. ASSESSMENT MANAGER CONDITIONS
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
the use commencing, and then compliance maintained at all times while the use continues
Currency Period
2. This development approval lapses if the works have not substantially started by 09 June
2028, unless an application to extend the currency period is approved by Council.
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below.
Plan No. Rev. Plan/Document Name Date
SD201 A Site Plan prepared by Kidd + Co 16/12/2021
SD202 A Ground Floor prepared by Kidd + Co 16/12/2021
SD203 A Canal Terrace prepared by Kidd + Co 16/12/2021
SD204 A Elevations prepared by Kidd + Co 16/12/2021
SD205 A Section/Detail prepared by Kidd + Co 16/12/2021
SD206 A 3D Views prepared by Kidd + Co 16/12/2021
SD207 A 3D Side Views prepared by Kidd + Co 16/12/2021
Building Appearance
4. External design features, materials and finishes must be as shown on the Approved Plans,
with no inclusions or alterations made without approval in writing by Council.
Noosa Waters Setback
5. The area within 4.5 metres of the centre line of the top of the concrete revetment wall must
be developed in accordance with the following:
a. a minimum of 25% of the area must be planted with shrubs and small trees with a
mature height of 3m or less.
b. a maximum of 25% of the area may be impervious, with the balance area soft
landscaping (i.e. grass, ground covers, shrubs and small trees).
c. the ground surface within 1 metre of the revetment wall must be grass or ground cover
and must not include shrubs or hard pavement.
d. any side boundary fencing must taper down to a maximum height of 1.2 metres at the
revetment wall and have a height not exceeding 1.5 metres at a distance of 2.25 metres
from the revetment wall.
e. any retaining structures, planter boxes or the like must be finished with natural
materials such as timber or rock rather than manufactured materials.
6. No shore side anchor points are permitted within 4.5m of the revetment wall.
Page 2 of 5
Document Set ID: 24867740
Version: 3, Version Date: 17/06/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority - DBW21 0205 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 145 KB (small file)
- File type
No other editions are linked here.