Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2021-12-07 Planning & Environment Committee Meeting Minutes

of 17

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING MINUTES                              7 DECEMBER 2021


5   MCU21/0164 - DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE –
    FOOD AND DRINK OUTLET AT 6/52 HASTINGS STREET, NOOSA HEADS
    Committee Recommendation
    Moved:           Cr Stockwell
    Seconded:        Cr Stewart
    That Council note the report by the Coordinator Planning to the Planning & Environment
    Committee Meeting dated 7 December 2021 regarding MCU21/0164 for a Development
    Permit for Material Change of Use - Food and drink outlet situated at Ocean Breeze 6/52
    Hastings St Noosa Heads and:
    A.   Approve the application in accordance with the following conditions:
         PLANNING
         When Conditions must be Complied With
         1.     Unless otherwise stated, all conditions of this Decision Notice must be complied
                with prior to the use commencing, and then compliance maintained at all times
                while the use continues.
         Approved Plans
         2.     Development undertaken in accordance with this approval must generally comply
                with the approved plans of development. The approved plans are listed in the
                following table unless otherwise amended by these conditions.

          Plan No.      Rev.   Plan/Document Name                                     Date

          TP 1.00       B      Ground Floor Plan, prepared by Frank Macchia           02.10.2021

          TP 1.01       B      First Floor Plan, prepared by Frank Macchia            02.10.2021

          TP 2.00       B      Elevations – with landscape, prepared by Frank         02.10.2021
                               Macchia

          TP 2.01       B      Elevations – no landscape showing, prepared by         02.10.2021
                               Frank Macchia

          TP 3.00       B      Sections - with landscape, prepared by Frank Macchia   02.10.2021

          TP 3.01       B      Sections – no landscape showing, prepared by Frank     02.10.2021
                               Macchia

          TP 4.00       B      Perspective, prepared by Frank Macchia                 02.10.2021

          TP 4.01       B      Perspectives, prepared by Frank Macchia                02.10.2021

          TP 4.02       B      Perspectives, prepared by Frank Macchia                02.10.2021

          TP 4.03       B      Perspectives, prepared by Frank Macchia                02.10.2021

         External Building Finishes
         3.     The development must be constructed in lightweight and natural materials, such
                as timber, as detailed on the approved plans.
         Currency Period
         4.     This development approval lapses if the use has not happened by 16 December
                2027, unless an application to extend the currency period is approved by Council.

                                                                                      Page 5 of 17
Log in to download the original file

2021-12-07 Planning & Environment Committee Meeting Minutes(PDF, 3MB).pdf · 2.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.