RECOR RFI Response

Attached to the e-mail Response to RFI - 9 Bottlebrush Avenue Noosa Heads - MCU21/0133.

of 3

Page text shows just the words. Original shows the document exactly as it was published.

            28th September 2021

            Ref:    MCU21/0133 & OPW21/0220

            Noosa Council
            PO Box 141
            TEWANTIN QLD 4565


            Attention:                        Patrick Murphy

            Dear Sir,

                        Re:                   Information Request
                        At:                   9 Bottlebrush Ave, Noosa Heads, QLD 4567


            With reference to the abovementioned information request for the development
            application (ref: MCU21/0133 & OPW21/0220), we have prepared an update to the
            engineering aspects of the submission to address the issues raised in the Request for
            Information as follows:

            1. Provide amended plans that include:
                    1.1. The longitudinal section extending to the centreline of the road formation
                    1.2. The plans with the footpath section located where pedestrians could
                    reasonably cross to the existing path in the frontage of the adjoining property
                    1.3. The footpath section with a consistent width on the relevant plans (desirably
                    2m, 1.5m minimum)
                    1.4. Additional sections within the road reserve which clearly indicate the transitions
                    to the adjacent verge areas which do not create trip or fall hazards.
                    Please note that Council does not support private retaining structures in the road
                    reserve

            The longitudinal section has been extended to the centreline of the road formation, and
            the grades have been updated to provide for a 1.5m path zone adjacent the kerb to align
            to the existing footpath to the north. An additional section has been created showing the
            transition to adjacent verge areas to demonstrate that no retaining structures are
            necessary within the road reserve.

                    1.5. The depths of the existing services in the road reserve determined by
                    potholing. If it is apparent that services may need to be altered provided written
                    approval from the relevant service provider

            We request that the requirement for potholing to locate the existing services be
            conditioned to be required with pre-start works as part of the development approval
            conditions.

            2. Provide amended plans that demonstrate that all spaces are accessible for a B99 vehicle
            to enter the space in a forward gear, reverse from the space and exit the site in a forward
            gear in a total of 3 movements.



P +61 7 5211 1003         A 37 Mary St, Noosaville Qld 4566     E [email protected]       recorconsulting.com
Log in to download the original file

RECOR RFI Response.pdf · 726 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 2 pages

Page 2

            The plans have been revised and amended to show that a B99 vehicle is able to make use
            of all parking spaces, entering and leaving the site in a forward’s direction in a total of 3
            movements. As AS2890.1 B4.3 permits the use of a reverse-in parking for residential and
            domestic car parks to cater for unusually spaced manoeuvre areas in front of the parking
            space, the space shown using this manoeuvre is considered to conform to the
            requirements of the standard.

            3. Provide a plan that demonstrates that vehicles can reverse from the visitor space and exit
            the site in a forward gear when the garage door is closed.

            A B99 vehicle is unable to reverse from Space 1 and leave the site in forward gear in two
            movements while the garage door is closed, however, as shown in the swept path analysis
            is able to comply when the garage door is open. Refer to Town Planning response for
            further information regarding the proposed usage of the space in relation to this.

            4. Indicate on the plan the extent of the door and the potential impacts on the swept paths
            for car spaces 2 & 3

            The extent of the door has now been shown on the Turning Paths Analysis plan to show
            that the extent of the door framing does not impact upon the ability to access any of the
            spaces.

            5. Provide additional comment in regard to:
                    5.1. The discharge rate at the outlet point in the kerb and channel (Council’s
                    maximum is 25l/sec). Council requires the discharge to not extend into the traffic
                    lane and create a traffic hazard so if the discharge is greater than 25l/sec provide
                    justification for the proposed rate

            A hydraulic analysis of the stormwater drainage network has been undertaken using the
            AutoCAD Storm & Sanitary Analysis module for the 1% AEP storm event at the location,
            based on the contributing catchments including the upstream property surface run-off,
            overland surface flows and the attenuated roof discharge. The 2 RHS sections have a peak
            discharge rate arising during the analysis of 24.76lps, which does not exceed Council’s
            maximum allowable discharge rate from the outlet point.

                    5.2. There does not appear to be any measures/structures to address overland
                    flows adjacent to the southern boundary. It is noted that the proposed bin store
                    extends to the property boundary and has the potential to block/redirect overland
                    flows.

            The bin area retaining wall is now offset 500mm off the boundary to enable to minor
            surface run-off from the southern boundary to eliminate blockage points and allow the
            overland flows to continue unimpeded.

            6. Provide an amended earthworks plans that is consistent with and includes the
            recommendations of the submitted geotechnical investigation




P +61 7 5211 1003        A 37 Mary St, Noosaville Qld 4566     E [email protected]        recorconsulting.com

Page 3

            The earthworks plan has been amended to ensure that the notes and references are
            consistent with and include the recommendations of the geotechnical investigation
            report.

            We believe the revised design addresses the requirements of the RFI and should further
            information be required please contact this office.

            Yours faithfully,
            RECOR Pty Ltd


            SIGNATURE




            Josh Overell
            Director
            BEng (Hons) MIEAust CPEng NER APEC Engineer IntPE(Aus) RPEQ




P +61 7 5211 1003         A 37 Mary St, Noosaville Qld 4566   E [email protected]   recorconsulting.com

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.