While the total amount of fill required does not seem to have been identified
Figure 6 “illustrates the ‘swampy’ nature of the lower area of the site in the
vicinity of the proposed gabion wall” and states that “a fill wall of approximately
2.0m will be required”.
I agree with the comment at page 10 of 13 in the Information Request “that the
extent of filling of the site may need to be reduced.”
COMMENT: The imported fill will all have to come in via Sandpiper Lane and on
the access road to the IGA and the other shops. It will therefore, directly and
significantly affect them and the Hardware store. This will involve considerable
noise and disruption from the source of the fill to the development and return. It
will also cause considerable disruption to the roundabout at the village and to
the Peregian Beach Hotel and other premises in that area.
COMMENT: The importation of fill will result in the creek, which seems to have
been ignored in the DA, being diverted to run through the Council Reserve.
5.2 Engineering Services Report – Page 7 in Response 2B
I querys why water reticulation is proposed down the pedestrian access lane to
the Peregian Beach Sports Ground (Lot 75 on MCH839108) and a
Unity Water meter is proposed at the Peregian Beach Sports Ground boundary
rather than on the developers property
I also querywhy Electricity supply will be provided by “installing underground
infrastructure down the Peregian Sports Reserve access strip” rather than
through the developers property.
I query the contribution the developer will be required to make, if any, to the
rectification of this pedestrian access and the extent of any delay in the lighting
and development of this pedestrian access, which is supposedly underway at
present.
6. Traffic
The DA proposes Carparking & Visitor Carparking of 115 space in total
67 with the Houses & 37 with the Hotel/Motel
4 in the west of the centre of the ring road
4 on the southside of the ring road behind the IGA
3 outside the security gate of the Motel.
This will result in an increase of 115 vehicles by the number of vehicular
movements per day over Sandpiper Lane with a considerable number of these
increasing the use of the Peregian Beach roundabout for vehicles going both
north and south. This will add to the number of vehicular movements per day
over Sandpiper Drive arising from the IGA Supermarket development without
any enhancement of the ability of Sandpiper Lane to cope with the number of
vehicular movements per day.
5
Document Set ID: 20306256
Version: 1, Version Date: 21/04/2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.