Fauna Management Plan Aug 2021 21040 Rpt01a
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn2 Pearsons Road, Cooroy Fauna Management Plan 3. Roles and responsibilities 3.1. Performance Indicators The key performance indicator for this FMP is for the outcomes for resident fauna on clearing to be completed without any adverse impacts to the park area and/or fauna species residing within the site. 3.2. Responsibility It is the responsibility of the Project Manager or Site Supervisor to ensure that the fauna spotter-catcher is available each day of clearing operations. It is also the responsibility of the Project Manager/Principal Engineer or equivalent to ensure the requirements of this FMP are provided to the clearing contractor to enable the contractor to factor the fauna management requirements into the quote for vegetation clearing works. The Clearing Contractor is responsible for ensuring: clearing does not occur without the presence of the fauna spotter- catcher clearing is undertaken in accordance with this FMP under the directives of the on-site fauna spotter-catcher. 3.3. Corrective Action The FMP is to be reviewed if an adverse outcome to the park area on site and/or native fauna results from clearing activities to identify any means that procedures can be altered to further minimise the potential for retained vegetation and/or fauna to be impacted. 3.4. Reporting The fauna spotter-catcher to provide a daily report to the Project Manager or Site Supervisor on the days clearing activities. A final report to the Project Manager on the clearing activities undertaken, the findings of all pre- clearing surveys and the management actions implemented during clearing activities. Following completion of vegetation clearing, the fauna spotter-catcher will submit a report to the Project Manager no more than two weeks after clearing has finished. This report must contain the following: the duration of the clearing period the details of the all fauna captures, observations and releases details of any injuries and deaths (including euthanasia) of fauna during the clearing period the monitoring of relocated hollows and/or logs if applicable. Ecological Survey & Management 21040 Rpt01a 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.