Neen ee Checklist - Applications Involving Land on Development & Land Use Sections IDAS APPLICATION This checklist should be used for any IDAS application. Please check each of the following items before accepting an application at the counter. Re 4.1 Form PartA 1.1.1. Ensure that the form is fully completed. 1.1.2. In the case of an MCU or Op Works below the high-water mark, owners consent is required. . 1.1.2.1 If there are multiple owners, the consent of each owner is required. N\A 1.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required. 1.2. Formi Part B-O Supporting Information 1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. 1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. [7] 7 semana, - —— S-ENVIRONMENTATCY RED VANTACE 3.1 Ensure that Part G is completed if EPA referral is. required. , TI 3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application fee is paid and recorded on the apptication. 42 FORMZEREQUESETO-CHANGE ABERC 4.1 Ensure that items 1-28 have been checked and/or completed including information regarding | applicant details and owners consent. ET Rg ER Bena ao ECB Rey: Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational Works) accompanies the application. In addition ensure that each set is complete. 5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is unbound. CPPORTING INFORMATIO 6.1. Ensure that at least 6 copies of any report accompanies the cpptivation (5 for Reconfiguration = and Operational Works). If the application is accompanied by a covering letter, ensure that it is capable of reproduction. [| 6.2 Inthe case of reports, ensure that 1 of the copies is in an 1 AS or A4 format and is unbound. = Sees TA Ensure that the application fee, as determined from the Council's adopted scale of fees, oe aes accompanies the application or has been paid. a 7.2 Ensure that the fee which has been paid is recorded on the application form. . oa Receiving Officer .....- Po. Selenite cineneee sete etee Date dt fal sr... Having completed this form and accepted the trays:- ¢ — Ifthe application is for a Material Change of Use exclusively -AOP1's desk in the Land Use Section. e Ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section. «Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively ~ AOD2 in the Land Development Section. e Inall other circumstances - AOP1’s desk in the Land Use Section. Please DO NOT leave the application at the counter and DO NOT deliver the application to Records. plication, please deliver both to the following IDAS Application Receiving SEP! g:\ant\forms\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 27 pages
Page 2
Part A, Version 2. 29 May 2006
The comptetion of all applicable questions on Part A ts mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
Tequired, and by one (1) of more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.ald.gov,.su.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 1,
Description of land
All land the subject of the application, must be
Identified. However, a description of the land Is not
Tequired in relation to @ moble or temporary
Environmentally Relevant Activity (ERA).
Advice for completing Q2 - 02 apples if
development is proposed within a water body or
watecourse,
Advice for completing Q3 - Most iand can be
identified by a lot on plan description. These details
can be obtained from title documents or through the
local goverment.
However, if the land on which the development is
proposed does not have a fot on plan description (i.e.
the development is proposed in @ water body or
watercourse) provide -
(i) the lot on plan description for the
adjoining/adjacent tand; or
(ii) GPS coordinates where there is no
adfoiningfadjacent land (eg, In Moraton Bay).
7 - Q7 does pot apply if the
development is within a water body or watercourse.
Advice for completing G8 - 08 apples if
development is within a local goverment area.
Note: Areas below high water mark are not within a
Jocal government’s area unless provided for under the
Local Government Act 1993.
‘Advice for completing Q9 - Q9 applies if
development is on strategic port land or a stratagic
port land tida! area. For more detaits refer to Guide 11.
4.
Street address: (ncludinghouse number, street name, suburtYiocality name & postcode) (if applicable)
‘Drive S66
Name of water body or watercourse, within which the development is proposed: (if applicable)
[Noosa Waters |
Lot on plan description (eg. Lot 123 on RP 4567)! GPS coordinates:
[4 RP BGS SOS
The above description is for: (tick applicable box)
(1(i) the land on which the development is proposed; or
Hii). the land adjoining the water body or watercourse, within which the development is
(7 (ili) the water body or watercourse.
proposed; or
6. Storey / level: 7. Total area of land: (m? or ha):
| LJeelnnz |
Local goverment area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo etc.) {if applicabte)
[Woesa Shire Comme] J
Port authority for the strategic port land or strategic port land tidal area on which the
development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)
Shop / tenancy number:
Proposal details
if there is insufficient room available, detalis may be
Provided In an attachment to the application.
10.
11.
Existing use of the land: (eg. vacant, single house, shop etc.)
Lowgle LOUuse
Proposed'uge of the land: (ag. 6 unit apartment building, 30 lot residential subdivision, ERA for aquacutture in
ponds with @ total area of 7 ha for which wastes are released Into waters afc).
(Tiniber_ jy ¢ qlee? Leo SHAK DANG.
Other applicable parts of Form 4
Part A must always be accompanied by other
completed parts of Form 1. For information about
when a part of Form 1 may apply refer to Guide J,
12.
Other parts of Form 4 completed as part of this application: (eg. Part D, Part I, etc)
[é_ 2 Che hus |
Applicant details 13. Applicant's name: L 15. Contact person:
copia ooelnefbe De cme te ard Seat, WMA CECI.
ng. and lodal l 14. Contact number: 16. Facsimile number/e-mail address:
ieraton ods cred, Tre assent D4 1434-50 (SY 745450 _|
manager, any referral agency & the Chief Executive
(where apofcable) wil rely on this infomation when | 17, Postal address:
Tipeanateantepcompanyacortact exe [FO_BOx <t FT MUR Me FCC.
> 18. Signature: 19. Date: ,
1k/7/0
2, J Hl
% 7s SS = 4
Q, Ww
9, GY "S
toy, <5 SO fr
cs
e %
Page 3
ob INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006 Land owner's consent (if applicable) 20. Land owner's consent to the making of this application: Section 3.2.1(3) of the IPA prescribes that an Name Date application mest contain, or be supported by, the vwritien consent of the land owner/s, i the application involves: @) a material change of use; @ reconfiguration of a lot; Shynatufh /] (@) work on land below high-water mark & not within a (i) canal as defined under the Coastal Protection andy eee cee bene e eee cee cee cee ee ee ee eee ee pene eee eee eee Management Act 1995:0r hee @) work on rail corridor land defined under the (iii) Transport infrastructure Act 1998 eee cee bocce eee cece eee eee ce cece eee enc ees feceereeeeeeee Section 3.8.1(2)(a) of the IPA provides that . tandowner’s consent is nog required for a mobile or (iv) temporary ERA nnn nn nn rere corn ren ern enn arene cc cnec Ponsa ttstes sects cesses steescorsresperscnssccnees For more information refer to Guide 1, ) Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving Section 3.2.1(5) of the IPA requires evidence of quarry jnaterial on State coastal land under the Coastal Protection and Management Act 1995)? resource entitlement be given for applications that Involve a prescribed State resource. NO - go to. Q24 (1) YES- goto a22 Section 3.2.1(10}(a)(i) of the IPA prescribes that . opt: . A application ceorat eaten to be property me 22. This application is accompanied by evidence: (tick applicable box) without evidence of the resource entitlement. Advice for completing Q21 & 22 Refer to schedule 10 of the integrated Planning Reguiation 1998 that prescribes the nature of evidence tequired by the State in support of the lodging of this development application. Advice for compteting Q23 The information to (1) - (v) is mandatory if evidence Is required under Q22 (il) or (ik) above. The official stamp of the Department of Natural Resources, Mines and Water is mandatory where the application involves any water or riverine quarry material under the Water Act 2000. Section 3.2.1(5A) allows the resource manager to Emit the time the evidence may be used. 023 (vi) must be completed if the evidence is time limited. 23. C1 (i) of the allocation of, or entitlement to, the resource - attach evidence and go to Q23(vi) (1 (ii) the chief executive of the department administering the resource is satisfied the development is consistent with an allocation of, or entitlement to, the resource - go to Q23 D (iii) the chief executive of the department administering the resource is satisfied the development application may proceed in the absence of an allocation of, or entitlement to, the resource - go to Q23 Evidence of the resource entitlement: (i) Resource entitlement / = details (ii) Name of a officer (iii) Position of “eases officer (iv) Signature of delegated officer (vii) Official stamp of the department administering the resource (if applicable) (v) Date (vi) pe date of evidence a Assessment triggers This checklist does net apply if the application requires the completion of Parts A and B of the Form onty. It 24. Is the IDAS Assessment Checklist completed and attached to this application? (eaves (JNO - the assessment manager may refuse to accept this application on the Must be completed for afl other applications. grounds that the application has not been properly made Plans / drawings / reports 25. Plans/drawings/reports accompanying this application: oupeat the oa emo med by etal © Plan} Drawing / Report Number manager, referral agencies and any person viewing the application during pubic scrutiny or public (ZE- Notification to understand the scope of the proposat and any potential impact. PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of iodgement, fails to provide all applicable information required by Part A and any other relevant part of Form 1. OFFICE USE ONLY (appiicable to assessment manager's) DATE RECENNG Percent $s REFERENCE FEES) =f Zou | ‘la Jor [ [P23 ven | NemBens loz/i LEoQ | Notification of Engagement of Private Certifier (Optional format} J r To, Council. | have been engaged as the private certifier for the buitding work referred to in this application. Date ofengagement / / Accreditation Number. _ Name: Signature:
Page 4
Parties
od Contract cere Queensland
Peo} For Houses and Land Sy Law Society
fe hee ree Fifth Edition
Accredited Agency This document has been approved by The Real Estate Institute of Queensiand Limited
(© CopyightREHQ) and the Queensland Law Society incorporated as being suitable for the sale and
purchase of residential houses and {and In Queenstand.
The Seller and Buyer agree to sell and buy the Property under this contract
Contract Date: / 86fo7 Reference Schedule
Agent: Noosa Hot Properties.com P/L Vas Noosa Hot Properties.com
Licence Number: 3007359
A.B.N: 72105106018 E-mail Address: [email protected]
Address: P OBOX 248, NOOSAVILLE QLD 4566 ©
Telephone: (07) 5455 6666 Facsimile: (07) 5455 6222
Seller: Annette Marie & Paul Joseph BALSARINI
A.B.N: E-mail Address:
Address: 99 Shorehaven Dye, Noosaville Q 4566
Telephone: Facsimile:
Seller's Solicitor: LyfncH A#4SSOn . for ary other soficilor not led to the Buy er]
A.BLN: E-mail Address:
Address: PO. BX 1097 Fewdrvzinl ‘
Telephone: SADUAG LE Facsimile: SU744922 Ret.
Buyer: Readheath Pty Lid as Trustee for The Mark Melville Family Trust
A.B.N: E-mail Address:
Address: PO Box 492 Cooroy Q 4563
Telephone: Facsimile:
, Buyer's Solicitor: Bruce Simpson & Associates. {or any other soctor notitied to the Sete]
A.B.N: . E-mail Address:
Address. 1st Floor Gamet Place, 1A Gamet, Cooroy.
Telephone: 54476800 Facsimile: Ref.
Property Land Address: 99 Shorehaven Dve Noosaville.
see . Built on
Description: Lot: 474 on: RP668305
County: : March Parish: Weyba
Title Reference: Area: 721sq mts {more or tens}
Land sold as: Freehold [Setec! one, 11 neither 2 selected, the lend Is treated a1 being Freeoid]
Present Use: residential dwelling LocalGovernment: Noosa Council
Excluded Fixtures:
Included Chattels:
Matters
. [It the Propeny it sold free (rom Tile Encumbrances
TitteEncumbrances: None known inson "Ni-) [1 the Property Is sold subject [o Title
Encumbrances, they must be described)
Affecting Tenancies:
‘enant's Name: y
Property Term and Options: A
Starting Date of Term: LY 29
Rent: . Bond: C
Price Deposit Holder: Noosa Hot Properties.com Pty.Ltd ° - [Urtess otharaine spectted inthis
Purchase Price: $ 1375000,00 <eiler We Yrs ry GST payee on the
se let supply of the Property to the
Deposit: $ 5000.00 payable whenBuyer signs this contract freer ihe whee Depoet ot tat
$ 45000.00 payable on: 14 days from date hereof Pay men required psyatle by
insta imeris) [Dalots # the whole
Depost ta bie when the
Detaut interest Rate: % Mire meron me Cane Rate inne’ yore cea
ae
Houses and Land EFO01 71.13 Page 101 8 10102 Fitth Edition Pr¥med Wy REALWORKS Live
"—
Le, Lb)
Page 5
Finance Buyer's Inspection Electrical Safety Switch 1. FAX Finance Amount: $ Sufficient to complete Financier: Finance Date: Inspection Date: Inspector. Buyers choice 14 days from date hereof 14 Days from date hereof Buyers choice This section must nol be completed if the Land is vacant The Seller gives notice to the Buyer that an Approved Safety Switch for the General Purpose Socket Outlet is: * installed In the residence (0 _— * notinstalled in the residence * Mark whichever is applicable fUriats all of “Finance Amour, Financior and Finance Osie” are completed, thia contract fs net evbiect to finance ang clause 3 does not eppty] [It nen completed, the contract i not subject to an inspection report and clause 4 dows not apply] WARNING: Hf the Buys Coes not Ge notice uncer cisuse 4 by the Inspection Data H wil be Isken to be smisfied wth the reports obtained.) [If required under the Queensland Buiting Sarvicas Authorty Aci 1991, the inspector mus! hold a current Heence under that Act.) [WARNING: By oWing Laisa oF misleading information in thi section, the Sater may incu a penaty, The Safer should s20k mpert and qualified mivice abou! completing this section end not rely on the Geller's Agent to complete ins section] The REIQ Terms of Contract for Houses and Land (Pages 3-8) (Fifth Edition ) Contain the Terms of this Contract. Special Conditions . The parties hereto agree thal execution by them of e fecsimile copy of this contract and e subsequent transmission of the same shall be deemed to be bindign upon the parties hereto as if it were en original signature. The parties agree to do such further acts end sign all necessary documents to give effect to this intention. 2. EMAIL ‘ The parties herato agree that execution by them of an emailed copy of this Contract and a subsequent transmission of same shall be deemed to be binding upon the parties hereto as If it were an original signature. The parties agree to do such further acts and sign Bll necessary documents to give effect to this intention. 3. NO REPRESENTATIONS and WARRANTIES The Buyers acknowledges that: 3.1 The Buyer has not relied upon any warranty or representation given or made by or on behalt of the Sefer. 3.2 The buyer hes relied entirely on the Buyer's own judgement in entering into this contract. 3.3 The terms and conditions contained in this contract comprise the whole o the agreement! between the parties. ew — Settlement Date: Settlement Signing 60 days from date hereof. Place for Setéement: Noose Jor the nent Business Oy # thet not @ Business Day in (he Ptace for Setiiemert) co” Houses end Land ‘EFOO1 Page 2 ot Fith Edition
Page 6
Part E, Version 2.0, 4 October 2004
INTEGRATED PLANNING ACT 1997
Operational &/or building work +3. =
assessable against a local government's planning scheme <a {
Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work (including detailed
engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does
not involve assessment of a material change of use of premises at the same time) assessable against a local govemment's planning scheme.
Nature of the application 1. This application is for (tick one (1) or both if applicable)
A development permit authorises imi . . is of fwork
dvelopment to occur, while a preliminary oO Preliminary approval provide details of the type of work eg. roadwork, stormwater, water and sewerage
approval is @ step in the approval process :
and does not authorise development to occur.
The types of work that are assessable against’
aplanning scheme are determined by the
scheme for a particular local government and
will vary across the State,
To determine the types of work that are
assessable under a particular planning
scheme, contact the relevant local
government.
AND/ OR
A Development Permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage
infrastructure, etc
Frivake tinier ye by § Ghamninien
Boat § forage ANCL
2. Are we subsequent to a previous development approval?
Oo [C1 YES - provide detaits of elf previous approvals (eg. file references)
3. Is the subdivision for a canal estate?
Ono
LYes ‘2st 7,
Portable Long Service Leave levy (f |4. ts payment of a Portable Long Service Leave (PLS1) le ft
appbcab) YES
Prior to issuing a development permit for the O complete O5
works, the assessment manager is required 1 ~ Q5, 6 & 7 do not apply
Page 7
INTEGRATED PLANNING ACT 1997 Part E, Version 2.0, 4 October 2004
by law to “sight” an approved fo sue by /5. Has the PLSL levy been paid?
Oeave which sprites that the levy COYES — com
oO NO -~ the applicable levy must be paid before a development permit can be given for the works
6. How much was paid?
L |
7. What is the receipt number of the payment?
|
PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY {applicable to assessment manager}
DATE RECEIVED | | REFERENCE NUMBER/S
(i) Isa PLSL levy applicable in this instance? (no (C1 YES - complete Qi)
(ii) Has the approved form (issued by QLeave and which signifies that the PLSL levy has been paid) been sighted by the assessment
manager / private certifier at the time of lodgement of this application? [No 1 YES - provide receipt detaits below
Page 8
.
INTEGRATED PLANNING ACT 1997 . IDAS Assessment Checklist, Version 20, 2 Apnt 2007
_ IDAS Assessment
Checklist
(Formerly the “Referrals Checklist”)
IMPORTANT NOTE FOR ALL APPLICANTS:
1. This checklist was formerly referred to as the ‘Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function,
2. Under the IPA and IDAS framework, an application May require assessment by the local Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.),
3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and May also assist the applicant to
determine the assessment manager’ for the application. .
4. — Therefore, the completion of alt questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
5. _ Itis the responsibility of the applicant to accurately complete this checklist.
6. — Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.
7. Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.
8. The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the pplication) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination?
9. To assist you in answering the following questions a series of guides are available free from the IPA website www. ipa.qid.qov.au. Guide 25 explains the role of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.
10. Any other parts of Form 4 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www.ipa.qtd.qov.au, .
11. Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.
: ° . SECTION 1 - STATE ASSESSMENT (completion mandatory)
‘Note: The following State assessment triggers apply.to development other than for building work essable against the Building Regulation 2006. . ‘ os
Environmentaily relevant activity 1. The application involves: (tick applicable box/es)
For more information refer to Guide 4, \G (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
Unless you answered “none of the above" to Q1, has not been made - complete Part G of Form 4
the application requires assessment by thé i” — . . .
administering authority3, oO (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
{fan entity, other than the administering made - complete Part G of Form 1
authority, is the assessment manager for the wi none of the above
application, the administering authority is a
concurrence agency for the application in relation
fo this matter.
Note: An application involving ERA 19 and/or 20
will also require completion of Part Kr of Form 1
for approval where an allocation under the Water
Act 2000 is required.
Continued overleaf
PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).
OFFICE USE ONLY (applicable to assessment manager)
DATE RECEIVED — “REFERENCE NUMBERIS
‘The assessment manager is responsible for assessing and deciding an 1DAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA.
For additonal information refer to Guide 6 ‘Does my application trigger the referral coordination process?"
The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local govemment (for a devolved ERA) or the Queensland Department of Primary Industries and
Fisheries (for a delegated ERA). .
Page 1
Page 9
INTEGRATED PLANNING ACT 1997
State-controlled road matters
For more information refer to Guide 3.
Unless you answered “none of the above" to Q2,
the application triggers referral to the Department
of Main Roads (DMR) as a referral agency.
In certain circumstances DMR will be an advice
agency, while in other circumstances DMR wit
be a concurrence agency.”
Schedule 2 of the IP Requiation will assist you to
determine where DMR is an advice or
concurrence agency for the application.
IDAS Assessment Checklist, Version 20, 2 April 2607
2. The application involves: (tick applicable box/es)
(i) development on land contiguous to a State controlled road and for -
(1 (a) material change of use assessable against the planning scheme;
C) (b) reconfiguring a fot unless -
« the total number of lots is not increased; and
+ the total number of lots abutting the State-controlled road is not increased: -
1 (©) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above}-
« associated with access to a State-controlled road; or
¢ for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
( (i) development on land not contiguous to a State-controlled road and -
C1 (a) material change of use -
« assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds:set by
that schedule; e@
oO (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
~ and exceeding the thresholds set by that schedule;
(1 () operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)—
+ assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
/ that schedule.
(iii) none of the above
Clearing vegetation
For more information refer to Guide 12.
Unless you answered “none of the above" to Q3,
the application requires assessment by the
Department of Natural Resources and Water
(NRW).
(f an agency other than NRW is the assessment
manager for the application, NRWis a
concurrence agency for the application in relation
to this matter.
If you ticked Q3(i) or (ii), your application requires
referral to NRW for assessment regardless of
whether vegetation clearing is proposed or not.
The application: involves: (tick applicable box/es)
C(i) material change of use -
(a) assessable against the planning scheme;
(b) on alot containing - ‘
* acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
+ ifthere is no property map of assessable vegetation for the lot - remnant vegetation;
{c) where the existing use of the land is a rural or environmental use; and
(d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
(ii) reconfiguring a lot - . e@
(a) on a lot containing a category 1, 2 or 3 area shown on a property map of
~ assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
(b) « where the size of the lot before the reconfiguration is 2 hectares or larger;
{c) where 2 or more lots are created; and .
{d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
(1 (ili) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in {i) or reconfiguring a lot mentioned in (ii) - complete Part J of
wm Form?
(iv) none of the above.
Strategic port land
For more information refer to Guide 11.
if you ticked (i) - the relevant Port Authority is the
assessment manager for the application.
if you ticked (#) Queenstand Transport is a
concurrence agency for the application.
The application involves:
[1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 ql
Act) - complete Part ! of Form 1
D (iia material change of use that is inconsistent with the land use plan approved under the
oo TI Act for the strategic port !and - complete Pant | of Form 1
{iii) none of the above
4 Land contiguous to a Stale-controlled road is defined in schedule 14 of the IP Regulation to mean land - if pat of the land is within 100m of the State-controlled road; or that is part of a future State-
cantrolled road.
Page 2
Page 10
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007 Acid sulfate soils 5. The application involves development on land situated in an identifiedS local government area For more information refer to Guide 10. and where the surface of the land is: (tick applicable box) Unless you answered “none of the above" to 05, (7) (i) below 20m AHD® and the development will involve the excavation of 1000m? or more of the application requires assessment by it di tat or below 5m AHD, Department of Natural Resources and Water soil or sediment at or below 5m or (NRW). £1 (ii) at or below 5m AHD and the development will involve filling the site with 1000m? or more if an agency other than NRW Is the assessment of material manager for the application, NRW Is an advice f agency for the application in rélation to this (iii) none of the above Matter, Major hazard facilities or possible 6. Does the application involve a material change of use for a major hazard facility or possible major hazard facilities major hazard facility as defined under the Dangerous Goods Safety Management Act 2001? For more information refer to Guide 17. 0 . if you answered “YES" to Q6, the application N fequires assessment by the Department of DYES - complete Part L of Form 1 _ Emergeney Services (DES). It an agency other than DES is.the assessment manager for the application, DESis a concurrence agency for the application in felation to this matter.. Water related development under the |7, The application involves: Water Act 2000 C1() operational work, for taking or interfering with water under the Water Act 2000, that is: For more information about items (a) - (1), refer (tick applicable box/es) to Guide 15. ‘For more information about item . - ett et oti, (g), refer to Guide 14 Does iy anptication oO (a) in a watercourse, lake or spring, (eg. a pump, gravity diversion, stream re-direction, weir.or involve assessment of a referable dam? dam) - complete Part K2, Ks, Ks, Ks, or Ko of Form 1 whichever is applicable; Unless you answered “none of the above" to Q7, the appleation requires assessment by the ( (b) for an artesian bore anywhere | in the State, no matter what the use - complete Part . Department of Natural Resources and Water Ki of Form 1, (NRW). / (J (c) for a subartesian bore, in declared subartesian area’, or in a certain area covered fan agency other than NRW is the assessinent by a water resource plan, for use for purposes other than stock and/or domestic “manager for the application, NRW is a use - complete Parl K; of Form 1° concurrence agency for the application in ta 4 , relation to-this matter. (1 (d) for a subartesian bore, in certain declared subartesian areas, for use for stock : and/or domestic purposes - complete Part Ks of Form 1; (1 (e) for taking overland flow water in certain areas covered by a water resource plan - complete Part Ky of Form 1; (J (f) for interfering with overland flow water in a drainage and embankment area - complete Pan Ksoof Form 1 (1 (g) for constructing a referable dam® or works that will increase the storage capacity of a referable dam by more than 10% - complete Part Ks of Form 1; or (ii) none of the above. Removal of quarry material from a 8. Does jhe application involve development for the removal of quarry material from a watercourse? watercourse For more information refer to Guide 16. Ifyou answered “YES* to Q8, the application requires assessment by the Department of Natural Resources and Water (NRW). tf an agency other than NRW is the assessment manager for the application, NRW is a concurrence agency for the application in relation to this matter. Note: Part G of Form 1 is required to be completed as the activity of removing quarry material from a watercourse is also an Environmentally Relevant Activity (ERA), requffing an allocation notice under the Water Act 2000? NO CI YES - complete Parts Ky and G of Form 1 5 The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Sundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Coolocta, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momingtan, Noosa, Pine Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday. Australian Height Datum (AHD). CaiwT Watercourse is defined in sch 10 of the IPA. The declared ground water areas are listed in Guide 13 Development in a declared catchment area, Referable dam is defined under the Water Act 2000. Page 3
Page 11
INTEGRATED PLANNING ACT 1997 Operational work that is tidal work or work in coastal management district For more information refer to Guide #8. For more information about prescribed tidal work in focal government tidal areas refer to Guide 24. Unless you answered “none of the above" to Q9, the application requires assessment by the Environmental Protection Agency (EPA). If an agency other than EPA is the assessment manager for the application, EPAisa concurrence agency for the application in relation to this matter. Local govemment is the assessment manager for all prescribed tidal work. Operational work below high water mark For more information refer to Guide 18. For more information about prescribed tidal work in local government tidal areas refer to Guide 24. Unless you answered “none of the above” to Q10, the application triggers referral to Queensland Transport (QT) (Maritime Safety Qld) as a concurrence agency. Local government is the assessment manager for all prescribed tidal work, IDAS Assessment Checklist, Version 20, 2 April 2007 9. The application involves operational work that is: ( tick the applicable box/es) Oi Oi) Dili of tidal work" as defined under the Coastal Protection and Management Act 1995 (the Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; of tidal work that is prescribed tidal work" other than in a canal"? -complete Part P of Form 1; of carried out within a coastal management district under the Coastal Act and for - complete Part M of Form 1 if any box/es (a) to (i) below are ticked. [) (a) constructing or installing works in a watercourse between MHWS and HAT tie. other than those works in tidal water} where the development has been determined not to be assessable against the Water Act 2000; constructing a canal12 intended to be connected to tidal waters; constructing an artificial waterway; reclaiming land under tidal water; disposing of dredge spoil or other solid waste material in tidal water; interfering with quarry material on State coastal land above high-water mark; draining or allowing drainage or flow of water or other matter across State coastal land above high-water mark; removing or interfering with coastal dunes on land, other than State coastal "® that is in an erosion prone area and above high-water mark; constructing a bank or bund wall to establish a ponded pasture on land, other than State coastal land, above high-water mark; or none of the above. LJ (b) Oe) Cd) Oe) oO O@) D1 (h) Ow 10. The application involves operational work that is: ( tick the applicable box/es) Oi) a) Co Gi) oh tidal work’ as defined under the Coastal Protection and Management Act 1996 (the Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or tidal work that is prescribed tidal work"4 - complete Part P of Form 1; or carried out within a coastal management district's under the Coastal Act and for - LA (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part M of Form 7; (1) (b) rectaiming land under tidal water - complete Part M of Form 1; or (1) (c) constructing a canal12, if the canal is associated with reconfiguring a lot - complete Part M of Form 1; none of the above. Coastal management For more information refer to Guide 18. Unless you answered “none of the above” to Q11, the application requires assessment by the Environmental Protection Agency (EPA). If an agency other than EPA is the assessment manager far the application, EPA is a concurrence agency for the application in relation to this matter. 11. The application involves: (tick the applicable box/es) Diy Ow) on a material change of use assessable under a planning scheme involving operations work carried out completely or partly in a coastal management district's a material change of use assessable under a planning scheme involving building work, carried out completely or partly in a coastal management district that is ~ « the construction of a new premises with a GFA'® of at least 1000m? « the enlargement of the GFA of existing premises by more than 1000m? reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated completely or partly in a coastal management district reconfiguring a lot’ assessable under schedule 8 of the IPA and in connection with the construction of a canal12 - complete Part M of Form 1 none of the above 10. Tidal work is defined in sch 10 of the IPA. 11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely of partly within a local government tidal area. 12. Canal means canal as defined under the Coastal Protection and Management Act 1995 13 Tidal work is defined in sch 10 of the IPA. 14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a locat government tidal area. 15 Coastal management district is defined in sch 10 of the PA and means a coastal management district under the Coastal Protection and Management Act 1996, other than an area dectared as a ° coastal management district under section 47(2) of that Act. 16 GFA is defined in sch 14 of the IPA to mean the grass floor area, For a definition of how to calculated GFA, 90 to the planning scheme against which the application is being assessed. 17 Under 5117 of the Coastal Protection and ‘Management Act 1995, an application for feconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be accompanied by the application for the operational works to construct (he artificial waterway. Page 4
Page 12
. IDAS Assessment Checklist, Version 20, 2 Apri 2007 INTEGRATED PLANNING ACT 1997 Development within the limits of a 12. Does the application involve development below high water mark’® and within the limits of a port port For more information refer to Guide 18. For ‘information about prescribed tidal work refer to Guide 24. lf you answered "YES" to Q12, the apphication tiagers referrat to the Port Authority. The Port Authority is a concurrence agency if the development is - © within 200m of a shipping channél or an enby and exit shipping corridor for the port _ within 1000m of a swing basin, a commercial shipping wharf, a mooring, anchorage of spoil grounds;- © within 1000m of a planned port faciity identified in a land use plan approved under the Transport Infrastructure Act 1994. . Sn all other situation the Port Authority is an advice agency. Marinas For more information refer to.Guide 18. For information about whether a marina is prescribed tidal work refer to Guide 24. The local govemmentis the assessment manager for all prescribed tidal work. Ifyou answered "YES" to Q13, the application triggers referral to Queenstand Fire and Rescue Service as an advice agency, 13. i Transport Infrastructure Act 1994? - NO [DYES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work Does the application involve ‘operational work that is tidal work for a marina’# with more than 6 vessél berths? NO [1] YES - complete Part M of Form 4, or Part P of Form 1 ifthe tidal work is prescribed tidal work Tidal works in strategic port land tidal areas For thore information refer to Guide 18. Unless you answered:"NO” to Q14, the relevant Port Authority is the assessment manager for the application and the Environmentat Protection Agency (EPA) and Queenstand Transport (QT) are concurrence agencies for the application. Heritage For further information refer. to Guide 19. \fyou answered "YES" to Q15, the application triggers referral to the Queensland Heritage Council as concurrence agency for the application. Unless you answered "none of the above” to Q15(b), the application invalves referral to the Environmental Pratection Agency as an advice agency for the application = 15, 4. Dope application involve tidal works within a strategic port land tidal area20? NO . : . (1 YES - complete Part M of Form 1 Does,the application involve development in a heritage registered place as defined under the Girt Heritage Act 1992? NO (YES - complete Part C of Form 1 15(b)The application involves: (tick applicable boxes) a material change of use assessable against the planning scheme and the lot shares a common boundary with a protected area or registered place under the Queensland Heritage Act 1992; reconfiguring a fot if the lot shares a common boundary with a protected area or registered place under the Queensland Heritage Act 1992; none of the above. ‘ Declared catchment areas For more information, including a list of the declared catchment areas within Queensland, tefer to Guide 13. Unless you answered “none of the above’ to Q16, the application requires assessment by the Department of Natural Resources and Water (NRW). it an agency other than NRW is the assessment Manager for the application, NRW is a concurrence agency for the application in relation to this matter. 16. The application is in an area declared to be a catchment area under the Water Act 2000 and involves: (tick the applicable box/es) | (i) reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares; C1 (ii), development assessable against the planning scheme involving the establishment or expansion of a waste water disposal system, other than a disposal system for carrying out an environmentally relevant activity under the Environmental Protection Act 1994: (ii) none.of the above 18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide, 19 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995. 20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land. Page5
Page 13
IDAS Assessment Checklist, Version 20, 2 April 2007 For more information refer to schedule 2of the IP Requlation. . Unless you answered “none of the above’ to Q18, the application triggers referral to the agency to which the easement is granted in favour of as advice agency. __ INTEGRATED PLANNING ACT 1997 Contaminated land 17. The application involves: tick the applicable boxes) Applications involving material change of use (0 @) reconfiguring a tot for which all of part of the premises are — and! or alt this : . . referral, revoniguing may tager (a) premises mentioned in the IPA, schedule 8, part 1, table 2- For more information refer to Guide 5. « item 5, including the exemption otherwise provided for by paragraph (d); Unless you answered “none of the above” to + item 6, including the exemption otherwise provided for by paragraph (e); or Q17, the application requires assessment by the « item 7, including the exemption otherwise provided for a mining activity or petroleum Environmental Protection Agency (EPA). If an activity: or agency other than EPA is the assessment activity, ; ; ; manager for the application, EPA will be a (b) in an area for which an area management advice has been given for unexploded concurrence agency for the application in ordnance - complete Part N of Form 1 relation to this matter. 7 . (1 (ii) a material change of use - (a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or (b) assessable against the planning scheme and if all or part of the premises is in an area for which an area management advice. has been given for unexploded ordnance - complete Part N of Form 1 iii) none of the above Electricity infrastructure 18. The application involves: (tick the applicable box/es) Di) reconfiguring a fot where any part of the lot is - . * subject to an easement in favour of a distribution entity or transmission entity under the @ Electricity Act 1994 and the easement is for a transmission grid or supply network under that Act; or ¢ situated within 100m of a substation site; a material change of use, assessable against a planning scheme and not associated with reconfiguring a lot if - * any part of the premises is subject to an easement in favour of a distribution entity or transmission entity under the Electricity Act 1994 and the easement is for a transmission grid or supply network under that Act; and any structure or work that is the natural and ordinary consequence of the use is, or will be, located wholly or partly in the easement; a material change of use, assessable against a planning scheme and not associated with reconfiguring a lot if any part of the premises is situated within 100m of a substation site; operational work that is filling or excavation assessable against the planning scheme, not associated with reconfiguring a lot, if - ¢ any part of the premises is subject to an easement in favour ofa distribution entity or transmission entity under the Electricity Act 1994 and the work is located wholly or partly in the easement; ¢ the work is located wholly or partly within 10m of a substation site; v) none of the above. Dil) O iii) O ii) Land designated for community infrastructure Applications involving development on land designated for community infrastructure may trigger this referral. For more information refer to schedule 2 of the IP Reguiation. Hf you answered “YES" to Q19, the application fequires assessment by the chief executive of the department administering the Act authorising the development for the designated purpose. * if an agency other than the designator is the - assessment manager for the application, the designating agency will be a concurrence agency for the application in relation to this matter, Does the application involve development assessable against the planning scheme and on land designated for community infrastructure? (i) intended to be supplied by a public sector entity; and (ii) on land not owned by or on behalf of the State; and (iii) other than development - (a) for the designated purpose; or (b) carried out by, or on behalf of, the designator. NO CyYes Page &
Page 14
_ Requiation.
INTEGRATED PLANNING ACT 1997
SEQ Regional Plan
For more information refer to schedute 2 of the
IP Requtation.
Refer to Chaptes 2, part SA and schedule 10 of
the Integrated Planning Act 1997, and schedule
2 of the Regutatory Provisions for relevant
definitions.
Unless you answered “none of the above’ to
Q20, thie application requires assessment by the
Office of Urban Management (OUM).
Fisheries matters
For more information refer to Schedule 2of the IP
Unless you answered “none of the above” to
21, the application requires assessment by the
Oepartment of Primary Industries and Fisheries
(OPI8F).
(fan agency other than DPI8F is the assessment
manager for the application, DPI&F is a
concurrence agency for the application in
felation to items {i) ~ (iv) and an advice agency
in relation to item (v).
IDAS Assessment Checkkst, Version 20, 2 April 2007
20. The application involves (tick applicable box/es) -
1 (i) amaterial change of use of premises -
{a) in a Major Development Area in the Urban Footprint for -
OO () anurban activity - oo
(11 inan area included in a structure plan where the iPA, section 3.1.6
applies;
(1 inan area not included in a structure plan where -
+ the IPA, section 3.1.6 applies to the application for the material change
of use; or
the premises exceeds 10,000m2; or
« the gross floor area (GFA) on the premises will exceed 10,000m2; or
* impact assessment is required under the relevant planning scheme
1 (i) intensive animal husbandry, or
C1 (ii) residential development involving a rural residential purpose
(b). in the Regional Landscape and Rural Production Area for -
( (i) an urban activity and not specified in section 2.4(2); or
C1 (ii) residential development involving a rural residential purpose and not
. specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
. (d) in the Investigation Area for -
OO () anurban activity and not specified j in section 2.10(2);
(1 (ii) residential development involving a rural residential purpose and not
specified in section 2.12(2}; or
() (iii) intensive animal husbandry
(CO (ii) reconfiguring a tot-
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
af (b) not specified in section 3.1(2).
(iii) none of the above
21. The application involves: (tick the applicable box/es)
[J () an assessable material change of use for aquaculture - complete Part O; of Form 1;
CJ (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part O3 of Form 1; °
LI (iii) assessable operational work completely or partly within a declared fish habitat area.
‘ complete Part O2 of Form f;
L (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;
(1 (WY development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;
(vi) none of the above.
Page 7
Page 15
INTEGRATED PLANNING ACT 1997
Integration of land use and public
transport .
For more information refer to Guide 23, schedule
8A of the IPA, & schedule 2 of the IP Regulation.
Unless you answered “none of the above’, the
application tiggers referral to QT as a
concurrence agency.
IDAS Assessment Checklist, Version 20, 2 April 2007
22. The application involves: {tick the applicable box/es)—
[7 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule. .
O (i) reconfiguring a lot— :
[1 (a) __ onland that is completely or partly within a public transport corridor, and the
total number of lots increases; .
[(b) _ ontand thatis completely or partly within a future public transport corridor or
an airport's public safety area;
(©). onland that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;
(1d) for aresidential purpose within the 25 ANEF contour for an airport;
(CJ (e) fora residential purpose resulting in 100 or more allotments.
CO (ili) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—~
(O(a) _ is completely or partly within a public transport corridor or a future public
transport corridor;
will result in work that encroaches into an airport's operational airspace.
oh, Ow)
{iv) none of the above.
Railway safety and efficiency
For more information refer to Guide 23, schedule
. BA of the IPA & schedule 2 of the IP Requlation.
Unless you answered “none of the above’, the
application triggers referral to QT as a
concurrence agency.
23. The application involves: (tick the applicable box/es)— / .
LC (i) a material change of use assessable against the planning scheme for a purpose
. mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule. ,
LD (ii) reconfiguring a lot—
O(a) ontand thatis completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
(1) (b) on land that is within 400m of a Citytrain passenger railway station or a future
Cilytrain passenger railway station, and the total site area is 5000m? or
/ greater;
(1 (©) __ oniand that abuts rail corridor and, commercial corridor land or future railway
land, and the total number of lots increases;
(1 (@) on tand that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
(1(e) _ onland that is comptetely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
(1 (f fora residential purpose resulting in 100 or more allotments.
( (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m3, on land that—
C1 (a) is completely or partly within rait corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
(0 (b) _ is completely or partly within future railway land, or a railway tunnel easement;
(J (c) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
{iv) none of the above.
Moonie to Brisbane pipeline
"For more information refer to schedule 2of the IP
Regulation.
Unless you answered “none of the above”, the
application triggers referral to the holder of
pipeline licence No 1 issued under the Petroleum)
Act 1923, currently Santos QNT Pty Ltd, for
advice. .
24. The application involves the easement for the construction or operation of the Moonie to
Brisbane strategic pipeline, and involves: (tick the applicable box/es)—
D (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.
C1 (ii) reconfiguring a lot
[1 (ili) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a tot, and the
work is located wholly or partly in the easement.
li, none of the above.
Page 8
Page 16
INTEGRATED PLANNING ACT 1997
Koala habitat area
For more information, refer to Guide 26 and
Schedule 2 of the IP Requlation.
Unless you answered “none of the above”, the ”
application requires referra to the Environmentat
Protection Agency as a concurrence agency.
IDAS Assessment Checklist, Version 20, 2 April 2007
25. The application involves: (tick the applicable box/es)—
oO 0 a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will resultin- -
[1 (a) clearing of native vegetation over an area greater than 2500m?;
(2 (b) anew building and any reasonably associated structure with a total footprint
greater than 1000mz2;
[1 (©) an extension to an existing building and any reasonably associated structure if
~ the extension has a total footprint greater than 1000m?;
[1 (d) extracting gravel, rock or sand from an area‘greater than 5000m?;
[1 (e) excavating or filling an area greater than 5000m?,
(1 (f\ additional traffic in a koala conservation area or koala sustainability area,
: between 6p.m. on a day and 6a.m. on the following day.
(1 (ii) reconfiguring a fot in a koala conservation area or koala sustainability area that will
result in -
(1 (a) an increased number of lots;
(J (b) clearing of native vegetation over an area greater than 2500m?.
LD (ill) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a fot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m2.
LO (iy) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
and will result in —
(J (a) clearing of native vegetation over an area greater than 2500m2,
(J (b) extracting gravel, rock or sand from an area greater than 5000m?;
{c) excavating or filling an area greater than 5000m2.
'v) none of the above.
Wild river area
For more information, refer to Guide 27
If you answered YES to Q26, you must also
complete section 2 of this checklist. This will
enable you to determine if your application can
proceed in a wild river area and which referral
agency will assess your application against the
Wild Rivers Code, or if the proposed
development is “prohibited” in a wild river area.
Note: Development can be ‘prohibited’ in a wild
fiver area because the application cannot be
accepted by the assessment manager.
26. Does {
2009
NO-
LJ Yes
application involve development in a wild river area declared under the Wild Rivers Act °
Preliminary Approval
HF you answered YES to Q27, the application
triggers referral to the Department of Local
Government, Planning, Sport and Recreation as
an advice agency.
27. Does the application involve a development for which preliminary approval is sought under
Seip .6 of the integrated Planning Act 1997?
NO : ,
CI Yes
Wetlands
Domestic activity means the canstruction of use
of a single residence on a tot and any reasonably
associated building or structure. Examples of a
building or structure that could be reasonably
associated with a single residence include:
caretakers residence, granny flat, building or
structure used for a home business.
Note: Wetland is defined in the Integrated
Planning Regulation 1998.
Unless you answered “none of the above” to
028, the application involves referral to the
Environmental Protection Agency as an advice
agency for the application.
28. The application involves: (tick the applicable boxes) -
Ot) amateriat change of use, other than for a domestic activity, assessable against the
planning scheme that is in or within 100m of a wetland;
C1 (i) reconfiguring a lot -
in or within 100m of a wetland that will result in
Oa (a) more than 10 lots being created; or
L (b) lots less than 5 hectares;
(iii) none of the above
Page 9
Page 17
INTEGRATED PLANNING ACT 1997
Conservation Estate
Urban purposes is defined in the Integrated
Planning Act 1997 as “purposes for which land is
used in cities or towns, inchiding residential,
industial, sporting, recreation and commercial
purposes, but not including environmental,
conservation, rural, natural or wildemess area
purposes".
Unless you answered “none of the above” to
Q29, the application involves referral to the
Environmental Protection Agency as an advice
agency for the application. .
IDAS Assessment Checklist, Version 20, 2 April 2007
29. The application involves: (tick the applicable bowes)—
(i) a material change of use for urban purposes that is in or within 100m of any of the
following -
Of@ a protected area, forest reserve, critical habitat or area of major | interest under
the Nature Conservation Act 1992:;
(J (b) a State forest or timber reserve under the Forestry Act 1959;
(J (c) a marine park under the Marine Parks Act 2004;
(J (d) arecreation area under the Recreation Area Management Act 1988;
(1 (e) a world heritage area listed under the World Heritage Convention;
‘(](f) Brisbane forest park under the Brisbane Forest Park Act 1977.
(1 (ii) reconfiguring a tot if -
(a) any part of the lot is situated in, or within 100m of, any of the following -
Ci{i) a protected area, forest reserve, critical habitat or area of major
interest under the Nature Conservation Act 1992;
CI (ii) a State forest or timber reserve under the Forestry Act 1959;
C1 (ii) a marine park under the Marine Parks Act 2004;
CI (iv) arecreation area under the Recreation Area Management Act 1988;
C1 (v) — aworld heritage area listed under the World Herifage Convention;
Brisbane forest park under the Brisbane Forest Park Act 1977; and
[ (b) the reconfiguration involves more than 10 lots being created, or any lot
tesulting from the reconfiguring is less than Sha; :
(iii) none of the above.
Page 10
Page 18
INTEGRATED PLANNING ACT 1997
SECTION 2- ASSESSMENT IN A WILD RIVER AREA *
(completion mandatory if the proposed development is located in a wild river area)
IDAS Assessment Checklist, Version 20, 2 ae 2007,
Wild River Area
Itthe responsibility of the applicant to
determine if the development Is proposed in
awild river area.
Information about wild river areas including the
geographical location and position of
management areas in relation to properties, can
be accessed by contacting the Department of
Natural Resources and Water (NRW), accessing ,
the department's website www.new.qld.gov.au or
contacting the department by email on:
wild [email protected]
Note on Referrals
Referrals for development in a wild river area
{other than for agricultural activities and animat
husbandry activities) are not changed from the
existing referral arrangements.
Notes on development assessable
against the Wild Rivers Code
For information regarding development in a wild
tiver area, see the relevant wild river declaration
and Guide 27. The relevant wild river
dectaration will provide information regarding
which types of development must be assessed
against the Wild Rivers Code, and in some
cases which types of development are exempt
from wild river requirements.
The notes on development assessable against
the Wild Rivers Code in this section of the
checklist provide some guidance however this
May vary between wild river areas. The relevant
dectaration will provide the information applying
to each wild river area.
Applications for some new developments will not
be accepted if the proposed developmentis in a
high preservation area (HPA). Most applications
for development activities which may be made
including those in a preservation area (PA), must
be assessed against and must comply with the
Wild Rivers Code where indicated in a relevant
wild river declaration,
1.
Which wild river area is the development proposed in?
The proposed development is to.be located in: (tick the applicablé box/es)
(Ji) ahigh preservation area (HPA);
Oo ii) a preservation area (PA) ;
CT iti) a wild river floodplain management area (FMA);
O iv) a wild river nominated waterway;
O v) a designated urban area (DUA).
Environmentally relevant activities
(ERAs) in a designated urban area
lfyou answered-YES, your application for an
ERA is exempt from any wild river requirements
and provided there are no other aspects of this
development that require assessment against
wild rivers, you do not need to complete the
remaining questions in Section 2.
Ifyou answered NO to Q2, please complete the
femaining questions in Section 2.
Does the proposed development only involve any of the following environmentally relevant
activities (ERAs) in a designated urban area (as mapped in the relevant wild river declaration)?
i) An ERA 28 or ERA 14; or
ii) A level 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.
O NO C YES (ensure you have completed Part G of Form 1)
Clearing native vegetation
if YES, there are a limited number of purposes
for which an application to clear native
vegetation may be accepted in a HPA, See
Guide 27 for a list of relevant purposes for
which an application may be made in a HPA.
If YES and you ticked Q4 box i) the application
may be made and is assessable against the Wild
Rivers Code. If YES and you ticked 4 box ii)
the application will not be accepted.
Note: If clearing native vegetation is in a PA,
there are no witd river requirements and
provided there are no other aspects of this
development where wild river requirements
apply, do not complete the remaining questions
in Section 2. °
\s the application operationat work for clearing native vegetation in a HPA?
CJ NO | YES (ensure you have completed Part J of Form 1)
If YES, is the clearing?
oO i) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
area of agriculture in a HPA (see Guide 27); or
Ol ii) in a HPA outside a registered area of agriculture?
Page 11
Page 19
INTEGRATED PLANNING ACT 1997
Works in tidal areas, coastal
management districts and fish habitat
areas
Ifyou answered YES to Q5, and ticked any
boxes in Q6), your application is required to be
assessed against and must comply with the Wild
Rivers Code.
Ifyou answered YES to Q5 and ticked box j} in
Q6, your application is required to be referred to
the EPA,
Note: if specified works are proposed in a local
government area, itis prescribed tidal work ~ the
relevant local government will be the
assessment manager with the EPA as a
concurrence agency
lf you answered YES to Q85, and ticked box ii) or
iil} in Q6, your application requires referral to
DPIF.
Hiyou answered NO to Q5 and ticked box i) in
+ Q6, the application will not be accepted.
If you answered NO to QS, ticked box i) in Q6
and the development is necessary to install
authorised works or infrastructure where a
development permit is not required, or if a
required permit is held, the application must be
assessed against and must comply with the Wild
Rivers Code. Applications for purposes other
than specified works or as described above will
not be accepted,
if you answered NO at Q65 and ticked box iii) in
Q6, the application may be made if the works are
in aPA, These applications must be assessed
against and must comply with the Wild Rivers
Code. The application will not be accepted if the
development is proposed to be located in a HPA.
For more information about specified works refer
to Guide 27
_ IDAS Assessment Checklist, Version 20, 2 Apri 2007 :
Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
Development in a wild river area)
CINno C1 Yes
The application is for one or more of the following:
Oi Operationat works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1), or
ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part O2 of Form 1); OF
O iif) Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1).
Residential, commercial or industrial
development
If you answered YES to Q7, your application is
fot subject to wild river requirements. Provided
there are no other aspects of this development
that require assessment against the relevant wild
river deciaration or Wild Rivers Code, you do aot
need to complete the remaining questions in
Section 2.
lf you answered NO to Q7 and ticked either box
i).or ii) in Q8, the assessing agency is the
relevant local government, The application must
be assessed against and must comply with the
Wild Rivers Code.
8.
|s the application for residential, commerciat or industrial development in a designated urban
area?
CINno CJ Yes
If NO, does the application for residential, commercial or industrial development involve:
(J i) a material change of use made assessable in a local government planning scheme
{ensure you have completed Part D of Form 1); or
EJ ii) operational works associated with reconfiguring a lot (ensure you have completed Part F @
of Form 1).
Animal husbandry activities
If you answered YES to Q9 your application
requires assessment against and must comply
with the Wild Rivers Code.
The assessing agency is NRW.
Note: Applications for animal husbandry
activities will not be accepted if proposed in a
HPA. For more details and a definition of animal
husbandry activities see the Wild Rivers Act
2005 and refer to Guide 27.
Does the application involve a material change of use for animal husbandry activities (as defined
under the Wild Rivers Act 2005} in a PA?
(no C] yes (ensure you have completed Part R of Form 1)
Agricultural activities
If you answered YES to Q10, your application
requires assessment against and must comply
with the Wild Rivers Code.
The assessing agency is NRW.
Note: Applications for agricultural activities will
not be accepted if proposed in a HPA. For more
details and a definition of agricultural activities
see the Wild Rivers Act 2005 and refer to Guide
27.
The production of fodder in a PA, and pasture
improvement using low impact soil disturbance
techniques is not an agricultural activity as
defined under the Wild Rivers Act 2005. For
more infomation see Guide 27.
10.
Does the application involve agricultural activities (as defined under the Wild Rivers Act 20085) in
a PA?
CIno
If YES is the application for:
QO YES (ensure you have completed Part Q of Form 1)
Oj ia material change of use; or
[J ii) operational works.
Page 12
Page 20
”
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 Apri 2007
Works that take overland flow water | 12. Does the application involve works that take overland flow water in a HPA or an FMA?
The relevant wid river declaration wil state
works that take overland flow water are either
self assessable or assessable, of are exempt
from wild river requirements.
\f you Gcked Q13 i}, your application must be
assessed by NRW agains! the Wild Rivers Code
and must comply with the code. :
If you ticked Q13 fi) an application is not required
fo be made however the works must comply with’
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application|
is required and must be assessed by NRW ~
against the relevant pait of the Wild Rivers Code.
and must comply with the code.
If you ticked Q13 iii} your application is not
subject to wild river requirements.
Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.
13.
‘Ono
oO YES (ensure you have completed Part Ks of Form 1)
If YES, is the application for works stated in the relevant wild river declaration to be?
{_J i) assessable works . :
oO ii) self-assessable works
Cif) exempt works
Works that interfere with overland
flow water
The relevant wild river dectaration wil state
works that interfere with overland flow water that
are either self assessable, assessable or exempt
from wild river requirements.
Ifyou ticked Q15 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.
if you ticked Q15 ii) an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, othenwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.
{fyou ticked Q15 iii) your application is not
subject to wild river requirements.
Applications for devetopment that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.
Does the application involve works that interfere with overland flow water in a FMA?
OD NO YES (ensure you have completed Part Kio of Form 1)
IFYES, is the application for works stated in the relevant wild rivers declaration to be?
(J i) assessable works ,
(ii) self-assessable works
(J iii) exempt works
Waterway barrier works
Applications for buitding or raising waterway
barrier works in a HPA will not be accepted.
If you answered YES.to Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
16.
Does the application involve building or raising waterway barrier works in a PA?
0 NO O YES (ensure you have completed Part Os of Form 1}
Aquaculture (non ERA)
Applications for aquaculture in a HPA will not be
accepted,
If you answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
Does the application involve aquaculture in a PA?
| NO Oo YES {ensure you have completed Part 0; of Form 1)
Works that interfere with water in a
watercourse
Note: If the development is proposed in a HPA,
applications for all works that interfere with water
in a watercourse (including dams or weirs,
stream realignment or steam diversion) will not
be accepted.
In a PA, applications for instream dams and
weirs may be accepted in nominated waterways.
Mf you ticked box ii) in Q19, your application wil
not be accepted.
Note: Operational works outside a HPA or
Nominated waterway are not subject to wild
river requirements.
More information and tocations of nominated
waterways is available by contact NRW,
accessing the department's website
ww. Iinw.qid.gav.au or contacting the
department by email on:
wild [email protected] the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?
CT NO O YES (ensure you have completed the relevant Part K of Form 1)
IF YES,
(1 i) The application is for an instream dam or weir; or
ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.
Page 13
Page 21
INTEGRATED PLANNING ACT 1997 Environmentally relevant activities Most apptications for an ERA in a HPA will not be accepted. Applications which may be made Fequire referral to the EPA. The assessment of some ERAs is assessed by NRW, others have been devolved to DPIF, NRW or delegated focal goverment (see EPA website for more information on devolved ERAS) Hf you answered NO to 20 you do not need to complete Qs 21-24, Ifyou answered YES to Q20 and the development is in a PA, your application must be assessed by the administering authority?" against the Wild Rivers Code and must comply with the code, unless the proposal is for development where an application will not be accepted, or is exempt from wild river requirements (see Q2). You will be able to determine if an application will not be accepted for the development by answering Q21 - Q24. If you answered NO to Q21, you do not need to complete Q22, It you answered YES to 21 you are required to complete Q22. lf you answered NO to 022, the application will not be accepted. If you answered YES to Q22, the application must be assessed by NRW against the Wild Rivers Code and Toust comply with the cade. if you answered NO to Q23 and the development} is proposed in the HPA the application will nat be accepted. If you answered YES to Q23, the application must be assessed by the EPA or NRW (as prescribed in schedule 8A of the IPA) against the Wild Rivers Code and must comply with the code. If you answered YES to 24 the application will not be accepted. If you answered NO to 024, your application must be assessed by NRW against the Wild Rivers Code and must comply with the code. Exempt ERAs in a designated urban area it the development is proposed in a designated Urban area there may be no wild river requirements. See Section 2 Q2. Note: All applications that can be accepted must be assessed against and must comply with the Wild Rivers Code (other than exempt ERAs in a designated urban area). 20. 21. 22. 23. 24, IDAS Assessment Checklist, Version 20, 2 April 2607 Does the application involve an ERA? LI No , Clyes (ensure you have completed Part G of Form1) Is the application for an ERA 20 instream? [no Oves |s a quarry allocation notice held for the proposed ERA 20 instream? (C1no Dyes Does the application involve any of the following in a HPA? i) a level 2 ERA 11, (and is for specified works or a residential complex) ii) an ERA 19 (dredging) iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in the Wild Rivers Act 2005, and Environmental Protection Act 1994) iv) an ERA 22 (out of stream) LJNno Clyes Is the proposed development for ERA 20 (out of stream) and; , : @ — inaFMA; and — not low impact; and — not for a residential complex in the area, or for specified works. ‘ LJNno Dyes ® Documentation if you answered NO to Q25, your zpplcation May be subject to an information request and processing of the application may be delayed. 25. Has documentation been included with the application describing how the applicant proposes to comply with the mandatory requirements, required outcomes, and/ or performance requirements as set out in the relevant part/s of the Wild Rivers Code? Ne) (J yes 21 The administering authority may be either the EPA, or if devolved or delegated, the local government, DPIF or NRW. Page 14
Page 22
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 Apri 2007 SECTION 3- Si: a BUILDING REFERRALS (completion fot fot mandatory) 2 o adier’s Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an application for building work assessable against the Building Regulation 2006 only. Special fite services - generally 1. For mote information go to schedule 2 table 1 and schedule 2A ofthe IP Requlafion. Assessment period 15 days. No response is a deemed refusal. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work fequires special fire services mentioned in schedule 2A part 1 of the Integrated Planning Regulation 1998 (IP Regulation) or includes an altemative solution assessed against the performance requirements of the Building Code of Australia. Fire safety for budget accommodation | 2. For more information go to-schedute 2 of the IP Regulation An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work the subject of the application tequires the instaltation of a fl ire safety system for a budget accommodation building. Spray painting 3. For more information go.to scheduis 2 of the IP equiation An application may trigger referral to the Department of industrial Relations (DIR) as a concurrence agency if the application involves a workplace incorporating spray painting. Retail. meat premises 4. For more information go to schedule 2 of the IP Regulation An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a retail meat premises. Private health facilities 5. For mere information go to schedule 2 of the IP Regulation An application may trigger referral to the Department of Health as a concurrence agency if the application involves a private health facility. Workplace area less than 2.3m? 6. For more information go to schedule 2 of the IP Requiation An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the application involves a work place area less that 2.3m?. Land contiguous to a State-controlled | 7. road . For more information go to schedule 2 of the IP Regulation An application may trigger referral to the Department of Main Roads as a concurrence agency or advice agency if the application involves tand contiguous to a State-controlled toad. Pastoral workers accommodation 8, For more information go to.schedule 2 of the IP Regulation An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency if the application involves pastoral workers accommodation. Child care centre 9. For more information go to schedule 2 of the IP Regulation An application may trigger referral to the Department of Communities as a concurrence agency if the application involves a childcare centre. Coastal development 10. For more information go to schedule 2 of the IP Regulation An application may trigger referral to the Environmentat Protection Agency (EPA) as a concurrence agency if the application involves land completely or partly seaward of a coastal building line22, Heritage 11. For more information go to schedule 2 of the IP Regulation An application may trigger referral to the Heritage Council as a concurrence agency if the application involves a heritage registered place. Fisheries matters 12. For mare information go to schedule 2 of the IP Requlation An application may trigger referral to the Department of Primary industries and Fisheries (DPI&F) as a concurrence agency if the application involves assessable building work in a declared fish habitat area; or as an advice agency if the application involves assessable building work on land that adjoins a declared fish habitat area. Integration of land use and public 13. transport For more information go to schedule 2 of the IP Regulation An application may trigger referral to Queensland Transport as a concurrence agency if the application involves existing or future public transport corridors, or airport operational airspace?3, Railway safety and efficiency 14, For more information go to schedule 2 of the IP Regulation An application may trigger referral to Queensland Transport as a concurrence agency if he application involves future railway land. NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed time. For applications retating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all other applications the assessment period is 15 days. lf no response is received from the local government for an application, it is taken to be a deemed refusal. However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no response is taken to be a deemed approval. Amenity and aesthetic impact of 15. An application will tigger a referral to the local government if it is : particular building work for single * fora single detached class 1 building or class 10 structure; and detached class 1 building or class 10 ¢ the focal govemment has declared by resolution the following: | building or structure — the appearance of the building or structure will have an extremely adverse impact on the amenity of For more information go to schedule 2 table 1 of the the locatity; and IP Regulation, — the appearance of the building or structure would be in extreme conflict with the character of the Assessment period 15 days. No response is a locality. deemed approval. . % Coastal building lines are prescribed under ihe Coastal Protection and Management Act 1995. 2 Operational airspace is as defined in State Planning Policy 1/02 "Development in the Vicinity of Certain Airports and Aviation Facilities". Page 15
Page 23
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
designated rainwater tank area
For more information go to schedule 2 table 4 of the
IP Regulation and the QDC part 25. .
Assessment period 15 days, No response is a
deemed refusal.
Whether paiticular buildings may be | 16. An application to use an existing building that is not class 4, 2, 3 or 4 for residential purposes may trigger a
occupied for residential purposes teferral to the local government as the concurrence agency. .
For more infarmation go to schedule 2 table 1 of the
IP Requiation.
Assessment period 15 days. No response is a
| deemed refusal. .
Design and siting 17. An application may trigger referral to the local government as the concurrence agency if the building work
For more information go to schedule 2 table 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.
iP Regulation, . 18. An application may trigger referral to the local government as the concurrence agency if the building work
Assessment period 5 days. No response is a does not comply with the qualitative statement for building clearance and site cover.
deemed refusal. 19. An application may trigger referral to the local government as the concurrence agency if the building work
, does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
Development Code, part 11 or 12.
Fire safety in patticular budget 20. An application may trigger referral to the local government as the concurrence agency to determine the
accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has
For more information go to schedule 2 table 1 of he been completed.
{P Requiation.
Assessment period 15 days. No response is a
deemed refusal.
Higher risk personal appearance 21. An application may trigger referral to the local government as the concurrence agency to determine if the
services building work
For more information go to schedule 2 table 1 of the * complies with the performance criteria of the Queensland Development code part 15; and
IP Reautation and the QDC part 15. « the work does not comply with an acceptable solution stated in the part,
Assessment period 15 days. No response is a
deemed refusal),
Building work for residential service | 22. An application for building work for premises in which residential care service under the Residential
For more information go to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger
iP Regulation and the QOC part 20. referral to the-local government as the concurrence agency.
Assessment period, 15 days. No response is a
deemed refusal.
Building work for removal or 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger
rebuilding referral to the local government as the concurrence agency.
For more information go to schedule 2 table 1 of the
IP Regulation.
Assessment period 5 days.- No response is a
deemed refusal.
Building work for rainwater tank in 24. An application may trigger referral to the local government as the concurrence agency to determine if the
building work or structure complies with the relevant performance criteria if -
Under the Building Regulation 2006, a-rainwater tank is proposed to be installed as part of relevant
building work, in a designated rainwater tank area; and
Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
solution for a relevant performance criteria. ~@
Page 16
Page 24
MAXIMUM RECORDED FLOOD LEVEL RL 2.00 AHD
mmm ee ee a
ropor wa rororm [|
RL 1.0 AHD RL 1.0 AHD
a Ay > .
DECK
RL 1.0 AHD
APPROVED HANORAK
TO ONE SIDE (MINIMUM)
RL 1.0 AHD
MINIMUM WATER RL 0.44 AHO
PILES:
ALL PILES SHALL BE APPROVED HARDWOOD
AND TREATED TO HAZARD 6.
eee ALL PILES SHALL BE INSTALLED IN ACCORDANCE
CRUSE USULGEUSGR WITH AS 2159 - PILING CODE
SHOREHAVEN DRIVE
19090
ELEVATION 1
1:50
PILES TO BE CLEAR OF STONE
PITCHING AND ASSOCIATED
GEOTEXILE FABRIC
LOT 474
72102
18°2545°
wom
PROPOSED
BOAT STORAGE
4100 OVERALL 1800 1800 4% 4100 ora 10480
FRAMING LAYOUT <1)
SITE PLAN
DECKING:
38 x 125 F14 HWD 3 ee
FIXED TO BEARERS ’ AN
WITH TWO STAINLESS - 3 &/
STEEL SCREWS EACH END “NM?
PILES:
@ 200 MIN TREATED
HWD POLES REAL PROPERTY
DESCRIPTION
LOT 474
RP868305
PARISH WEYBA
COUNTY MARCH
RADHEATH PTY LTD
PROPOSED JETTY
LOT 474
(No.99)
SHOREHAVEN DRIVE
NOOSA WATERS
RABRINK PTY LTD T/A
John Norden
& Associates
ACN 010 263 877
Servqural / Civili Design Engineers
Pornaat [
Page 25
KICKER:
75 x38 HWD
1/75 x No14 TYPE 17
STAINLESS STEEL
SCREWS @ 450 CRS
PUES:
© 200 HE MARINE HWD POLES
NOTE THAT ALL POLES TO COMPLY
WITH AS 2158 - PILING CODE
SECTION“A »
eT
JETTY USE:
SINGLE USER, PRIVATE
NO VEHICULAR ACCESS
WALKWAY DECK VERTICAL
DESIGN LIVE LOAD - 2.0 kPa
MAXIMUM MOORED VESSEL - 5m
BERTHING VELOCITY - 0.5 m/sec
180 x 76 HW
10 PL ANGLE BRACKET
g 24416 8/5 TO EACH MEMBER
200 « 75 HWO
DETAIL ‘ 2 .
2M16 SS
180.475 HWD ——_—»
DETAIL c 3 \
NOTES:
1. UNLESS NOTED OTHERWISE ALL TIMBER SHALL BE
OURABILITY CLASS 1 OF APPROVED SPECIES AND HAVE
A STRESS GRADE OF F14 MIN.
2. UNLESS NOTED OTHERWISE ALL CONSTRUCTION SHALL
COMPLY WITH THE ENVIRONMENTAL PROTECTION AGENCYS'
OPERATIONAL POLICY - “BUILDING AND ENGINEERING
STANDARDS FOR TIDAL WORKS."
3. ALL STAINLESS STEEL BOLTS, RODS, ETC., SHALL BE
APPROVED MARINE GRADE 316. ALL OTHER STEELWORK
INCLUDING NUTS, BOLTS, WASHERS, SCREWS, NAILS, ETC.,
SHALL BE HOT DIPPED GALVANISED OR STAINLESS STEEL.
4. TOP OF PILES SHALL BE SEALED AND FULLY CAP FLASHED
OR RINGED.
5. DIMENSIONS AND LEVELS SHALL NOT BE SCALED FROM
THE DRAWINGS.
RABRINK PTY LTD T/A
" John Norden
& Associates
INT ACN 010 263 877
ES
‘Servcturel / Crt Desiga Engineers
Suse 16 Tewentn Piaza’
Poinciana Avenue / PO Box 206
Tewantin O 4565
Pn: 07 54497137 Fax 0? 54407172
Emad:
[email protected] net
DRAM OATE
$ ASHTON JULY 2007
\__
WORKING DRG
7 07/134-2 [|
Page 26
MAXIMUM RECORDED FLOOD LEVEL RL 2.00 AHD
Or mmm nL
1. UNLESS NOTED OTHERWISE, ALL CONSTRUCTION SHALL COMPLY
WITH THE AS 1084 - *ALUMINKJM STRUCTURES COOE™, AS10665 - “ALUMINIUM
ALL ALUMINIUM SECTIONS SHALL BE 6081/T6 ALLOY WITH 5086 OR 6083
ALLOY FOR PLATE:
MINIMUM WATER RL 0.44 AHD 3 ALL SUCH AS MIG OR NA.
as WELDING 6061 TO 6041, USE 4043 ALLOY FULLER.
WHEN USE 5368 ALLOY FILLER.
4. STAINLESS STEEL, WHERE NOMINATED, SHALL BE ALLOY 304 OR 318,
PILES:
ALL PILES SHALL BE APPROVED HARDWOOD
AND TREATED TO HAZARD 6.
ALL PILES SHALL BE INSTALLED IN ACCORDANCE
WITH AS 2159 - PILING CODE
MAXIMUM TOTAL
BOAT WEIGHT
2/916 & BOLTS $00 x 100 x 6.0
1500 kg 10mm WINCH fA
PLATE AT 16 100 x 100 x0
PLATE WELDED
TO 100 x 100 x 6.0 EA
2200 MIN TREATED
100 x 80 x 6.0
‘SECTION
APPROXPLETOPRIOS Ono's 88 AN ee = SECTION X- X
50 x 50 x 3.0 RHS e WELDED TO FRAME
APPROX PILE TOP RL 0.66 1:10
1:20
3300 1800
John Norden
& Associates
ACN 010 263 677
Ee
Suvawrel / Civ Design Eng.nsere
‘Sule 15 ‘Towanta Pieze*
Poncdana Avenus / PO Box 206
Tewentin O 4565
Pr: OF 54467137 Fac 07 54437172
een ie
FRAMING LAYOUT WORKING DRG
- — - - 07/134-3 |
Page 27
am a LAND USE SECTION FEES NOOSA | : RECEIPT TYPE SALE OF DOCUMENTS Superseded Planning Scheme Documentation : 520 Copy of Permit/Approval Letter . 110 The Noosa Plan Documentation 111 APPLICATION FEES oO Material Change of Use - Codermpact . Consistent 521 Inconsistent 521 - Assessment under Superseded Planning Scheme §21 Modification to a Development Permit 521 @ Extension of a Currency Period . 521 Operational Works - Landscaping §21 Bldg Work assessable against the Planning Scheme 521 PRE LODGEMENT REVIEW Half Hour 522 One Hour §22 ADVERTISING ‘ Purchase Advertised Applications §23 JETTIES © . : : : Jetty Application Fee [Bea 524 Jetty Bond : Soo . $1 : (Category 4) BONDS / Performance Bond : . . $1 , (Category 9) Si , . oe Registration Fee uo, _ . . 222 SEARCH FEE . Search of Land Use Section file 112 Liquor Licensing Request 113 . TOTAL. § [Soo NAME: Ra Adhea tn Ofru . ADDRESS: efeteeso. fo fovue U9 2. Ceooy Sle 3 FILENO: — OT/ hewg DATE: 1/09 RECEIPTNO: _/ 2 90 nO __ Signature of TP Officer: (1 Aton, Se tT AUTHORITY NO:
Page 28
CALCULATION OF FEES APPLICATION FEE TOTAL FEES MCU - CODE ASSESSMENT Details of Development Consistent 1.0 inconsistent 3.0 FEE CALCULATION MCU - IMPACT ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION OPERATIONAL WORKS Details of Development FEE CALCULATION TOTAL FEES
Used in these records
07/1409 - MCU - Domestic Marine [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.