Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

07/1409 - MCU - Domestic Marine [As Published] · 142007.1409

of 28

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Part E, Version 2.0, 4 October 2004

INTEGRATED PLANNING ACT 1997

 

Operational &/or building work +3. =

assessable against a local government's planning scheme <a {

 

Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work (including detailed
engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does
not involve assessment of a material change of use of premises at the same time) assessable against a local govemment's planning scheme.

 

 

 

 

 

 

 

 

 

 

 

 

 

  

Nature of the application 1. This application is for (tick one (1) or both if applicable)
A development permit authorises imi . . is of fwork
dvelopment to occur, while a preliminary oO Preliminary approval provide details of the type of work eg. roadwork, stormwater, water and sewerage
approval is @ step in the approval process :
and does not authorise development to occur.
The types of work that are assessable against’
aplanning scheme are determined by the
scheme for a particular local government and
will vary across the State,
To determine the types of work that are
assessable under a particular planning
scheme, contact the relevant local
government.
AND/ OR
A Development Permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage
infrastructure, etc
Frivake tinier ye by § Ghamninien
Boat § forage ANCL
2. Are we subsequent to a previous development approval?
Oo [C1 YES - provide detaits of elf previous approvals (eg. file references)
3. Is the subdivision for a canal estate?
Ono
LYes ‘2st 7,
Portable Long Service Leave levy (f |4. ts payment of a Portable Long Service Leave (PLS1) le ft
appbcab) YES
Prior to issuing a development permit for the O complete O5
works, the assessment manager is required 1 ~ Q5, 6 & 7 do not apply

 

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1409 - MCU - Domestic Marine [As Published].pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.