RFI - 7. Accoustic
Proposed Mixed Use Development
2 Bottlebrush Avenue
Noosa Heads
ACOUSTIC REPORT
Client:
Project Urban
ATTN: Michael Michell
Reference: Date Issued:
2023121 R01M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx 15 April 2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 33 pages
Page 2
Document Information
Contact Details
Acoustic Works
Unit 17/10 Benson Street
PO Box 1271
Toowong QLD 4066
Coorparoo DC
(07) 3393 2222
QLD 4151
ABN: 56 157 965 056
Greg Pearce Mark Enersen
Email: [email protected] Email: [email protected]
Report Register
Date Revision Author Reviewer Manager
23/06/23 R01H James Daramola Matthew Bechara GP
20/07/23 R01I Ammie Numkarng Benjamin Cox GP
21/07/23 R01J Ammie Numkarng Benjamin Cox GP
2/04/24 R01K Martin Jacobs Matthew Bechara GP
4/04/24 R01L Martin Jacobs Matthew Bechara GP
15/04/24 R01M Martin Jacobs Matthew Bechara GP
Disclaimer
Reports produced by Acoustic Works are prepared for a particular Client’s objective and are based on a specific
scope, conditions and limitations, as agreed between Acoustic Works and the Client. Under no circumstances
shall information and/or report(s) prepared by Acoustic Works be used by other parties other than the Client
without first obtaining written permission from Acoustic Works.
2023121 R01M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 2
Page 3
TABLE OF CONTENTS
1.Introduction ................................................................................................................ 5
2.Site Description ........................................................................................................... 5
2.1 Site Location ........................................................................................................... 5
2.2 Proposal ................................................................................................................. 6
2.3 Zoning .................................................................................................................... 6
2.4 Acoustic Environment .............................................................................................. 6
3.Equipment ................................................................................................................... 6
4.Receivers and Noise Monitoring .................................................................................. 7
4.1 Receiver Locations ................................................................................................... 7
4.2 Offsite Sources ........................................................................................................ 8
4.3 Unattended Noise Monitoring ................................................................................... 8
4.3.1 Road Traffic Noise Levels ................................................................................... 8
4.4 Attended Monitoring ................................................................................................ 8
4.4.1 Road Traffic Noise ............................................................................................. 8
4.4.2 Offsite Activities ................................................................................................ 8
5.Measured Noise Levels ................................................................................................ 9
5.1 Road Traffic and Ambient Noise Levels ...................................................................... 9
5.2 Attended Monitoring ................................................................................................ 9
6.Noise Criteria............................................................................................................. 10
6.1 Road Traffic Noise Criteria ...................................................................................... 10
6.1.1 Queensland Development Code MP4.4 .............................................................. 10
6.2 Environmental Noise Criteria................................................................................... 10
6.2.1 Acoustic Quality Objectives .............................................................................. 10
6.2.2 Background Creep ........................................................................................... 11
7.Road Traffic Assessment ........................................................................................... 12
7.1 Traffic Volumes ..................................................................................................... 12
7.2 Road Traffic Noise Verification ................................................................................ 12
7.3 Predicted Road Traffic Noise Levels - 2033 .............................................................. 13
8.Environmental Assessment ....................................................................................... 14
8.1 Onsite Activities to Offsite Receivers ....................................................................... 14
8.1.1 Acoustic Quality Objectives .............................................................................. 14
8.1.2 Background Creep ........................................................................................... 14
8.2 Onsite Activities to Onsite Receivers ........................................................................ 15
8.2.1 Acoustic Quality Objectives – Onsite Activities to Onsite Receivers ....................... 15
8.3 Offsite Activities to Onsite Receivers ....................................................................... 16
9.Recommendations ..................................................................................................... 17
9.1 Road Traffic and Offsite Noise ................................................................................ 17
9.1.1 Glazing ........................................................................................................... 17
9.1.2 Alternative Ventilation ..................................................................................... 17
9.1.3 Wall Construction ............................................................................................ 18
9.1.4 Roof Construction ........................................................................................... 18
9.2 Onsite Activities..................................................................................................... 19
9.2.1 Onsite Mechanical Plant ................................................................................... 19
9.2.2 Waste collection .............................................................................................. 19
10. Conclusion .......................................................................................................... 20
11. Appendices ......................................................................................................... 21
11.1 Development Plans ................................................................................................ 21
11.2 Unit Numbering ..................................................................................................... 28
11.3 Noise Monitoring Charts ......................................................................................... 31
11.3.1 Road Traffic Noise and Ambient Noise Levels ................................................. 31
2023121 R01M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 3
Page 4
TABLE INDEX
Table 1: Measured traffic and ambient noise levels .......................................................................... 9
Table 2: Attended noise measurement results. ................................................................................ 9
Table 3: Queensland Development Code Noise Categories ............................................................. 10
Table 4: Acoustic Quality Objectives at Noise Sensitive Properties ................................................... 10
Table 5: Background Creep Noise Limits ....................................................................................... 11
Table 6: Traffic Volumes .............................................................................................................. 12
Table 7: Comparison of measured and predicted noise levels ......................................................... 12
Table 8: Predicted traffic noise levels ............................................................................................ 13
Table 9: Acoustic quality objective noise levels, 1 hour .................................................................. 14
Table 10: Background Creep, 15-min ............................................................................................ 14
Table 11: Predicted noise impacts – Onsite activities to onsite receivers .......................................... 15
Table 12: Predicted external noise impacts to onsite receivers. ....................................................... 16
Table 13: Rw Ratings & Glazing Treatments .................................................................................. 17
Table 14: QDC typical wall construction ........................................................................................ 18
Table 15: QDC typical roof construction ........................................................................................ 18
FIGURE INDEX
Figure 1: Site Location (Not to Scale) .............................................................................................. 5
Figure 2: Receivers and noise monitoring location ........................................................................... 7
2023121 R01M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 4
Page 5
1. Introduction
This report is in response to a request by Project Urban for a road traffic and environmental noise
assessment of a proposed residential development located at 2 Bottlebrush Avenue, Noosa Heads
(also known as 75 Noosa Drive, Noosa Heads). To facilitate the assessment, unattended noise
monitoring was conducted for the following:
• Road traffic noise levels from Noosa Drive to establish noise impacts to the development.
• Ambient noise levels were measured in the vicinity of nearby residences to determine the
criteria for onsite and offsite activities.
Based on the results of the assessment, recommendations for acoustic treatments are specified in
this report.
2. Site Description
2.1 Site Location
The site is described by the following:
2 Bottlebrush Avenue, Noosa Heads (75 Noosa Drive, Noosa Heads)
Lot 157 on RP88772
Refer to Figure 1 for site location.
Figure 1: Site Location (Not to Scale)
N
Site
2023121 R01M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 5
Page 6
A comprehensive site survey was conducted on 25th May 2023 and identified the following:
• The site is zoned Major Centre Zone (as defined in the Noosa Planning Scheme 2020) and is
occupied by commercial premises that will be demolished.
• Noosa Drive bounds the site to the northwest and Bottlebrush Avenue to the northeast.
• The surrounding area consists of residential dwellings and commercial premises.
2.2 Proposal
The proposal is to construct a mixed-use development as follows:
• 3-storey mixed used development with a basement and rooftop terrace
o Basement: 2 restaurant/café spaces w/ amenities.
o Ground Floor: 1 residential unit and 6 car parking spaces.
o First floor: 3 residential units
o Second floor: 2 residential penthouse suites
o Rooftop: communal pool
• Site access via Noosa Drive
Refer to the Appendices for development plans.
2.3 Zoning
Review of the Noosa Planning 2020 interactive mapping clearly indicates that the area of the
proposed development is zoned Major Centre. The sensitive receivers in the vicinity of the site are
zoned High Density Residential, Major Centre, and Tourist Accommodation. Based on this
information the criteria nominated in Section 6 apply.
2.4 Acoustic Environment
The site and surrounding area are primarily affected by road traffic noise from Noosa Drive and
noise from nearby commercial premises.
3. Equipment
The following equipment was used to record noise levels:
• Rion NL42 Environmental Noise Monitor
• BSWA Technology Co. Ltd Sound Calibrator
The Rion NL42 Environmental Noise Monitor holds current NATA Laboratory Certification and was
field calibrated before and after the monitoring period, with no significant drift from the reference
signal recorded.
2023121 R01M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 6
Page 7
4. Receivers and Noise Monitoring
4.1 Receiver Locations
The nearest sensitive receiver locations were identified as follows;
1. A three-storey residential apartment building (zoned High Density Residential) is located
northeast of the site at 1 Bottlebrush Avenue.
2. Onsite residential receivers.
These locations were chosen as being representative of the nearest sensitive receivers to the
proposed development. Refer to Figure 2 for these locations.
Figure 2: Receivers and noise monitoring location
N
Unattended
monitoring
1
2
Attended Site
measurements
.
A
B
2023121 R01M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 7
Page 8
4.2 Offsite Sources
To ensure a reasonable acoustic amenity is maintained for the proposed development, the nearest
offsite activities were considered as shown in Figure 2. The nearest offsite sources were identified
as follows:
A. Single storey commercial premises (restaurants) along the southern site boundary of the
site. Assumed operating hours of the various restaurants operate between 7am and
Midnight (according to Google Maps).
B. Commercial premises located at 4 Bottlebrush Avenue.
4.3 Unattended Noise Monitoring
4.3.1 Road Traffic Noise Levels
A Rion NL42 environmental noise monitor was placed at 71 Noosa Drive, 12m from the nearest lane
to measure road traffic and ambient noise levels. The monitor was located in a free field position
with the microphone approximately 1.4 metres above ground surface level. The noise monitor was
set to record noise levels between the 18 and 25 May 2023.
The environmental noise monitor was set to record noise levels in “A” Weighting, Fast response
using 15-minute statistical intervals. Ambient noise monitoring was conducted generally in
accordance with Australian Standard AS1055:2018 ‘Acoustics – Description and measurement of
environmental noise’. Refer to Figure 2 for noise monitoring location.
4.4 Attended Monitoring
4.4.1 Road Traffic Noise
In addition to the unattended noise monitoring, attended noise measurements of the Noosa Drive
were conducted on 25th May 2023. The Norsonic Nor140 Sound Level Meter was located
approximately 3 m from the Noosa Drive with the microphone positioned 1.5 metres above ground
level. Noise measurements were conducted in “A” weighting “Fast” response, 15 minute statistical
interval which recorded the LA10 (used to calculate the 18 hour LA10).
For the attended and unattended noise monitoring locations refer to Figure 2.
4.4.2 Offsite Activities
Attended measurements were conducted on the 25th May 2023 to determine the noise impacts
associated with the offsite activities. The assessed activities are associated with any offsite activity
including mechanical plant units which may impact the site, with the results presented in Section
5.2.
The noise measurements were conducted utilising a Norsonic NOR140 sound level meter measured
in 1/3 octave bands. All noise measurements were conducted generally in accordance with Australian
Standard AS1055 'Acoustics – Description & Measurement of Environmental Noise'.
2023121 R01M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 8
Page 9
5. Measured Noise Levels
The following table presents the measured noise levels from the unattended noise survey. Any
periods of inclement weather or extraneous noise were omitted from the measured data prior to
determining the results.
5.1 Road Traffic and Ambient Noise Levels
The road traffic noise levels measured at the monitoring location are as follows:
Table 1: Measured traffic and ambient noise levels
L90 dB(A)
Day Date L10(18h) L90(8h) L90(18h)
Day Evening Night
Thursday 18/05/23 - - - 56 47 43
Friday 19/05/23 64 41 53 55 49 42
Saturday 20/05/23 64 42 52 54 50 43
Sunday 21/05/23 63 40 50 54 46 41
Monday 22/05/23 64 40 51 55 46 41
Tuesday 23/05/23 64 41 51 54 47 42
Wednesday 24/05/23 64 40 50 54 45 41
Thursday 25/05/23 - - - 54 - 41
Overall value 64 41 51 55 47 42
Refer to the appendix for graphical representation.
5.2 Attended Monitoring
Acoustic Works attended the site on 25th May 2023 at 1:55pm to determine potential noise impacts
associated from the surrounding commercial premises. During the site visit, a collection of
condensers was audible. Measurements were taken at a location representative of the cumulative
noise from the mechanical plant. Noise measurements are detailed below.
Table 2: Attended noise measurement results.
Distance from source Measured ambient noise
Location Description Time
(m) level LAeq T dB(A)
A Mechanical plant 1 55 1.55pm
2023121 R01M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 9
Page 10
6. Noise Criteria
6.1 Road Traffic Noise Criteria
The Queensland Development Code (QDC) MP4.4 is referred to for the minimum design
requirements.
6.1.1 Queensland Development Code MP4.4
To determine the minimum design requirements for any new developments located in a transport
noise corridor, the Queensland Development Code Part 4.4 may be applied if no alternative solutions
are provided. In accordance with MP4.4, the noise categories are stated in Table 3.
Table 3: Queensland Development Code Noise Categories
Noise level L10 (18hr) dB(A)
Category
(Including façade correction)
Category 4 ≥ 73
Category 3 68-72
Category 2 63-67
Category 1 58-62
Category 0 ≤ 57
The building treatment for any future development onsite shall be determined at Building Approval
stage, in general accordance with the Queensland Development Code. Alternative solutions may be
provided on request.
6.2 Environmental Noise Criteria
The noise criteria as applied by Noosa Shire Council are as follows:
6.2.1 Acoustic Quality Objectives
Table 4 below presents the acoustic quality objectives at noise sensitive receptors as detailed in
Schedule 1 of the EPP (Noise) 2008.
Table 4: Acoustic Quality Objectives at Noise Sensitive Properties
Acoustic Quality Objectives, dB(A)
Sensitive Receptor Time of Day
LAeq,adj,1hr LA10,adj,1hr LA1,adj,1hr
Dwelling Day and Evening
50 55 65
(outdoors) (7am – 10pm)
Day and Evening
Dwelling 35 40 45
(7am – 10pm)
(Indoors)
Night (10pm – 7am) 30 35 40
2023121 R01M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 10
Page 11
6.2.2 Background Creep
The Background Creep criteria are as follows;
Time-varying noise:
LAeq,adj,T, ≤ Ambient LA90,T + 5dB(A)
Steady-state noise:
LA90,T ≤ Ambient LA90,T
The time period (T) is a time interval of at least 15 minutes, or if the noise continues for less than
15 minutes, the duration of the noise source.
Based on the results of ambient noise monitoring, the project specific background creep noise limits
are shown in Table 6.
Table 5: Background Creep Noise Limits
Noise Level Limits SPL dBA
Time Period
LAeq,T LA90,T
Day 7am – 6pm 60 55
Evening 6pm – 10pm 51 47
Night 10pm – 7am 47 42
2023121 R01M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 11
Page 12
7. Road Traffic Assessment
Road traffic noise associated with the surrounding road network was assessed at the development
over a ten-year planning horizon.
7.1 Traffic Volumes
Road traffic volumes were conservatively predicted using the measured Road Traffic Noise due to
the unavailability of road traffic data for Noosa Drive. Other road traffic data (heavy vehicle
percentage and associated 10-year horizon growth rate) were conservatively assumed based on
similar projects completed by Acoustic Works.
Road traffic data is provided in Table 6.
Table 6: Traffic Volumes
2023 2033
Percentage of
Location Predicted Predicted Growth Rate
Heavy Vehicles
AADT AADT
Noosa Drive 12, 632 15, 398 3.0% 2%
7.2 Road Traffic Noise Verification
To ensure the CoRTN noise model is accurate, a verification model of the predicted LA10(18hr) was
created and compared to the measured noise level. The CoRTN method allows a 2dB(A) variation
from the predicted and measured level, if the variation exceeds 2dB(A) a correction to the predicted
level is required.
Table 7: Comparison of measured and predicted noise levels
Measured LA10(18hr) Predicted LA10(18hr)
Location Correction
dB(A) dB(A)
Oakey Flat Road 64 64.6 0
2023121 R01M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 12
Page 13
7.3 Predicted Road Traffic Noise Levels - 2033
Road traffic noise modelling for the proposed development was based on the following information:
• Site layout, floor plans and elevations provided by JSTN Architects, dated 27th March 2024.
• Noosa Drive speed limit of 40km/h.
• Receiver heights were based on 1.8m above finished floor level.
• +2.5dB(A) Façade correction where required.
Table 8: Predicted traffic noise levels
Predicted Road Traffic Noise
Location
Impacts 2033
QDC Noise
Unit Level Room LA10(18hr) dB(A)
Category
Kitchen/Living/Dining 67 2
1 GF Bedroom 1 67 2
Bedroom 2 67 2
Kitchen/Living/Dining 60 1
1 1 Bedroom 1 60 1
Bedroom 2 60 1
Kitchen/Living/Dining 67 2
2 1 Bedroom 1 63 2
Bedroom 2 67 2
Kitchen/Living/Dining 67 2
3 1 Bedroom 1 42 0
Bedroom 2 42 0
Kitchen/Living 60 1
Penthouse 1 2 Bedroom 1 60 1
Bedroom 2 60 1
Kitchen/Living 67 2
Penthouse 2 2 Bedroom 1 67 2
Bedroom 2 67 2
Refer to Section 9.1 for construction recommendations in accordance with the QDC.
2023121 R01M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 13
Page 14
8. Environmental Assessment
8.1 Onsite Activities to Offsite Receivers
Noise associated with the development was assessed based on previous measurements of similar
activities. The calculations assume that the nominated activities are located at a representative.
distance within the development site to each receiver location. Any relevant shielding or building
transmission loss is taken into account for these activities.
8.1.1 Acoustic Quality Objectives
The noise source levels and predicted impacts at the receiver locations are shown in Table 9.
Table 9: Acoustic quality objective noise levels, 1 hour
Receivers #### 10 10 10 10 10 10 10 10
Barrier (height (m))
1. 1 Bottlebrush AV (NE)
LA10 adj,1hr ext. dB(A) Night
LAeq adj,1hr ext. dB(A) Night
LA10 adj,1hr int. dB(A) Night
LAeq adj,1hr int. dB(A) Night
LA1 adj,1hr ext. dB(A) Night
LA10 adj,1hr ext. dB(A) Day
LAeq adj,1hr ext. dB(A) Day
LA10 adj,1hr ext. dB(A) Eve
LAeq adj,1hr ext. dB(A) Eve
LA10 adj,1hr int. dB(A) Day
No. of events per 1hr Night
LAeq adj,1hr int. dB(A) Day
LA10 adj,1hr int. dB(A) Eve
LAeq adj,1hr int. dB(A) Eve
LA1 adj,1hr ext. dB(A) Day
LA1 adj,1hr ext. dB(A) Eve
LA1 adj,1hr int. dB(A) Day
LA1 adj,1hr int. dB(A) Eve
No. of events per 1hr Day
Corrected Leq@1m dB(A)
No. of events per 1hr Eve
Source Leq@1m dB(A)
Distance (m) Receiver
Dist atten. @-6dB/dd
Building Screening dB
Transmission Loss dB
Distance (m) Source
Amenity LA10 LA1
Barrier screening dB
Duration per event
Correction dB(A)*
LAeq Compliance Compliance Compliance
Day / Day / Day /
Receiver
Day / Night Day / Night Day / Night
eve eve eve
eve indoor eve indoor eve indoor
indoor indoor indoor
No
Description
Criteria 50 35 30 55 40 35 65 45 40
Restaurant (Internal) (including music)83 0 83 4 4 4 900 1 40 0 -15 -32 36 26 36 26 36 26 39 29 39 29 39 29 43 33 43 33 43 Yes Yes Yes Yes Yes Yes Yes Yes Yes
1 Restaurant (Outdoor dining) 83 0 83 4 4 0 900 1 40 0 -32 41 31 41 31 0 -10 44 34 44 34 0 -10 48 38 48 38 0 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Car passby 71 0 71 12 8 4 15 1 50 0 -12 -34 12 2 10 0 7 -3 0 -10 0 -10 0 -10 13 3 13 3 13 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Car door closure 71 2 73 12 8 4 2 1 50 0 -12 -34 5 -5 3 -7 0 -10 0 -10 0 -10 0 -10 0 -10 0 -10 0 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Car start 72 2 74 12 8 4 2 1 50 0 -12 -34 6 -4 4 -6 1 -9 0 -10 0 -10 0 -10 0 -10 0 -10 0 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Van delivery 78 0 78 1 1 1 60 1 30 0 0 -30 31 21 31 21 31 21 0 -10 0 -10 0 -10 36 26 36 26 36 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Total 42 32 42 32 37 27 45 35 45 35 39 29 49 39 49 39 44 Yes Yes Yes Yes Yes Yes Yes Yes Yes
*Correction due to tonality and impulsiveness as per AS1055:2018.
8.1.2 Background Creep
The noise source levels and predicted impacts at the receiver locations are shown in Table 10.
Table 10: Background Creep, 15-min
Receivers 900 900 900 900 900 900 10 10 10
Barrier (height (m))
1. 1 Bottlebrush AV (NE)
No. of events per 15min Night
No. of events per 15min Day
No. of events per 15min Eve
LAeq adj,T ext. dB(A) Night
Corrected Leq@1m dB(A)
LAeq adj,T int. dB(A) Night
LAeq adj,T ext. dB(A) Day
LAeq adj,T ext. dB(A) Eve
LAeq adj,T int. dB(A) Day
LAeq adj,T int. dB(A) Eve
Source Leq@1m dB(A)
Distance (m) Receiver
Dist atten. @-6dB/dd
Building Screening dB
Transmission Loss dB
Distance (m) Source
LAeq 15 min
Barrier screening dB
Duration per event
Correction dB(A)*
Compliance
Receiver
Day Eve Night
No
Description
Criteria 60 51 47
Restaurant (Internal) (including music) 83 0 83 1 1 1 900 1 40 -15 -32 36 26 36 26 36 26 Yes Yes Yes
1 Restaurant (Outdoor dining) 83 0 83 1 1 900 1 40 -10 -32 41 31 41 31 0 -10 Yes Yes n/a
Car passby 71 0 71 3 2 1 15 1 50 -12 -34 12 2 10 0 7 -3 Yes Yes Yes
Car door closure 71 2 73 3 2 1 2 1 50 -12 -34 5 -5 3 -7 0 -10 Yes Yes Yes
Car start 72 2 74 3 2 1 2 1 50 -12 -34 6 -4 4 -6 1 -9 Yes Yes Yes
Van delivery 78 0 78 1 1 1 60 1 30 -30 37 27 37 27 37 27 Yes Yes Yes
Total 43 33 43 33 39 29 Yes Yes Yes
*Correction due to tonality and impulsiveness as per AS1055:2018.
Compliance is predicted with the criteria without the need for further acoustic treatment.
2023121 R01M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 14
Page 15
8.2 Onsite Activities to Onsite Receivers
Onsite activities were also assessed to onsite receivers. The calculations assume nominated activities
are located at a representative distance within the development site to each receiver location. Any
relevant shielding or building transmission loss is taken into account for these activities.
8.2.1 Acoustic Quality Objectives – Onsite Activities to Onsite Receivers
The noise source levels at the receiver locations are shown in Table 11.
Table 11: Predicted noise impacts – Onsite activities to onsite receivers
Receivers #### 29 29 29 29 29 29 29 29 29
A. Level 1 Apartments Barrier (height (m))
LA10 adj,1hr ext. dB(A) Night
LAeq adj,1hr ext. dB(A) Night
LA10 adj,1hr int. dB(A) Night
LAeq adj,1hr int. dB(A) Night
LA1 adj,1hr ext. dB(A) Night
LA10 adj,1hr ext. dB(A) Day
LA1 adj,1hr int. dB(A) Night
LAeq adj,1hr ext. dB(A) Day
LA10 adj,1hr ext. dB(A) Eve
LAeq adj,1hr ext. dB(A) Eve
LA10 adj,1hr int. dB(A) Day
B. Level 2 Penthouse suites
No. of events per 1hr Night
LAeq adj,1hr int. dB(A) Day
LA10 adj,1hr int. dB(A) Eve
LAeq adj,1hr int. dB(A) Eve
LA1 adj,1hr ext. dB(A) Day
LA1 adj,1hr ext. dB(A) Eve
LA1 adj,1hr int. dB(A) Day
LA1 adj,1hr int. dB(A) Eve
No. of events per 1hr Day
Corrected Leq@1m dB(A)
No. of events per 1hr Eve
C. Ground Floor Apartment
Source Leq@1m dB(A)
Distance (m) Receiver
Dist atten. @-6dB/dd
Building Screening dB
Transmission Loss dB
Distance (m) Source
Amenity LA10 LA1
Barrier screening dB
Duration per event
Correction dB(A)*
LAeq Compliance Compliance Compliance
Day / Day / Day /
Receiver
Day / Night Day / Night Day / Night
eve eve eve
eve indoor eve indoor eve indoor
indoor indoor indoor
No
Description
Criteria 50 35 30 55 40 35 65 45 40
Restaurant (Internal) (including music)83 0 83 4 4 4 900 1 3.5 0 -10 -18 -11 44 15 44 15 44 15 47 18 47 18 47 18 51 22 51 22 51 22 Yes Yes Yes Yes Yes Yes Yes Yes Yes
A Restaurant (Outdoor dining) 83 0 83 4 4 0 900 1 3.5 -11 0 -18 -11 43 14 43 14 0 -29 46 17 46 17 0 -29 50 21 50 21 0 -29 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Car passby 71 0 71 12 8 4 15 1 15 0 0 -18 -24 16 -13 15 -14 12 -17 0 -29 0 -29 0 -29 17 -12 17 -12 17 -12 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Car door closure 71 2 73 12 8 4 2 1 15 0 0 -18 -24 10 -19 8 -21 5 -24 0 -29 0 -29 0 -29 0 -29 0 -29 0 -29 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Car start 72 2 74 12 8 4 2 1 15 0 0 -18 -24 11 -18 9 -20 6 -23 0 -29 0 -29 0 -29 0 -29 0 -29 0 -29 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Van delivery 78 0 78 1 1 1 60 1 15 0 0 -18 -24 19 -10 19 -10 19 -10 0 -29 0 -29 0 -29 24 -5 24 -5 24 -5 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Total 47 18 47 18 44 15 50 21 50 21 47 18 54 25 54 25 51 22 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Criteria 50 35 30 55 40 35 65 45 40
Restaurant (Internal) (including music)83 0 83 4 4 4 900 1 15 0 -10 -18 -24 31 2 31 2 31 2 34 5 34 5 34 5 38 9 38 9 38 9 Yes Yes Yes Yes Yes Yes Yes Yes Yes
B Restaurant (Outdoor dining) 83 0 83 4 4 0 900 1 15 0 0 -18 -24 41 12 41 12 0 -29 44 15 44 15 0 -29 48 19 48 19 0 -29 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Car passby 71 0 71 12 8 4 15 1 20 0 0 -18 -26 14 -15 12 -17 9 -20 0 -29 0 -29 0 -29 15 -14 15 -14 15 -14 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Car door closure 71 2 73 12 8 4 2 1 20 0 0 -18 -26 7 -22 5 -24 2 -27 0 -29 0 -29 0 -29 0 -29 0 -29 0 -29 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Car start 72 2 74 12 8 4 2 1 20 0 0 -18 -26 8 -21 6 -23 3 -26 0 -29 0 -29 0 -29 0 -29 0 -29 0 -29 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Van delivery 78 0 78 1 1 1 60 1 20 0 0 -18 -26 16 -13 16 -13 16 -13 0 -29 0 -29 0 -29 21 -8 21 -8 21 -8 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Total 42 13 42 13 32 3 45 16 45 16 35 6 49 20 49 20 39 10 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Criteria 50 35 30 55 40 35 65 45 40
Restaurant (Internal) (including music)83 0 83 4 4 4 900 1 21 0 0 -18 -26 39 10 39 10 39 10 42 13 42 13 42 13 46 17 46 17 46 17 Yes Yes Yes Yes Yes Yes Yes Yes Yes
C. Restaurant (Outdoor dining) 83 0 83 4 4 0 900 1 21 0 -10 -18 -26 29 0 29 0 0 -29 32 3 32 3 0 -29 36 7 36 7 0 -29 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Car passby 71 0 71 12 8 4 15 1 9 0 0 -18 -19 21 -8 19 -10 16 -13 0 -29 0 -29 0 -29 22 -7 22 -7 22 -7 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Car door closure 71 2 73 12 8 4 2 1 9 0 0 -18 -19 14 -15 12 -17 9 -20 0 -29 0 -29 0 -29 0 -29 0 -29 0 -29 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Car start 72 2 74 12 8 4 2 1 9 0 0 -18 -19 15 -14 13 -16 10 -19 0 -29 0 -29 0 -29 0 -29 0 -29 0 -29 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Van delivery 78 0 78 1 1 1 60 1 9 0 0 -18 -19 23 -6 23 -6 23 -6 0 -29 0 -29 0 -29 28 -1 28 -1 28 -1 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Total 39 10 39 10 39 10 42 13 42 13 42 13 46 17 46 17 46 17 Yes Yes Yes Yes Yes Yes Yes Yes Yes
*Correction due to tonality and impulsiveness as per AS1055:2018.
Compliance is predicted on the condition the recommendation in Section 9 is implemented.
2023121 R01M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 15
Page 16
8.3 Offsite Activities to Onsite Receivers
During site investigation, offsite activities were not audible at the proposed development due to
screening of the building and road traffic noise, therefore modelling of offsite activities were
undertaken to account for potential impacts of the surrounding commercial and retail. Table 16
presents the predicted noise impacts from the nearest commercial premise to the proposed
development. The predicted noise impacts of the offsite activities are compared against the internal
noise requirements of the EPP Acoustic Quality Objectives as shown in Table 12.
Table 12: Predicted external noise impacts to onsite receivers.
Receivers #### Barrier (height (m)) 29 29 29 29 29 29 29 29 29
A. South facade
LA10 adj,1hr ext. dB(A) Night
LAeq adj,1hr ext. dB(A) Night
LA10 adj,1hr int. dB(A) Night
LAeq adj,1hr int. dB(A) Night
LA1 adj,1hr ext. dB(A) Night
LA10 adj,1hr ext. dB(A) Day
LA1 adj,1hr int. dB(A) Night
LAeq adj,1hr ext. dB(A) Day
LA10 adj,1hr ext. dB(A) Eve
LAeq adj,1hr ext. dB(A) Eve
LA10 adj,1hr int. dB(A) Day
B. East facade
No. of events per 1hr Night
LAeq adj,1hr int. dB(A) Day
LA10 adj,1hr int. dB(A) Eve
LAeq adj,1hr int. dB(A) Eve
LA1 adj,1hr ext. dB(A) Day
LA1 adj,1hr ext. dB(A) Eve
LA1 adj,1hr int. dB(A) Day
LA1 adj,1hr int. dB(A) Eve
No. of events per 1hr Day
Corrected Leq@1m dB(A)
No. of events per 1hr Eve
C. North facade
Source Leq@1m dB(A)
Distance (m) Receiver
Dist atten. @-6dB/dd
Building Screening dB
Transmission Loss dB
D. West facade
Distance (m) Source
Amenity LA10 LA1
Barrier screening dB
Duration per event
Correction dB(A)*
LAeq Compliance Compliance Compliance
Day / Day / Day /
Receiver
Day / Night Day / Night Day / Night
eve eve eve
eve indoor eve indoor eve indoor
indoor indoor indoor
No
Description
Criteria 50 35 30 55 40 35 65 45 40
Noosa Drive Commercial (Mechanical Plant)
55 0 55 4 4 4 900 1 10 0 0 -10 -20 25 -4 25 -4 25 -4 25 -4 25 -4 25 -4 28 -1 28 -1 28 -1 Yes Yes Yes Yes Yes Yes Yes Yes Yes
A Noosa Drive Commercial (restaurant activities)
75 0 75 4 4 4 900 1 10 0 0 -10 -20 45 16 45 16 45 16 45 16 45 16 45 16 48 19 48 19 48 19 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Car passby 71 0 71 20 20 20 15 1 10 0 0 -10 -20 30 1 30 1 30 1 0 -29 0 -29 0 -29 31 2 31 2 31 2 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Car start 72 2 74 20 20 20 2 1 10 0 0 -10 -20 24 -5 24 -5 24 -5 0 -29 0 -29 0 -29 27 -2 27 -2 27 -2 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Car door closure 71 2 73 20 20 20 2 1 10 0 0 -10 -20 23 -6 23 -6 23 -6 0 -29 0 -29 0 -29 25 -4 25 -4 25 -4 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Total 45 16 45 16 45 16 45 16 45 16 45 16 48 19 48 19 48 19 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Criteria 50 35 30 55 40 35 65 45 40
Noosa Drive Commercial (Mechanical Plant)
55 0 55 4 4 4 900 1 15 0 0 -10 -24 21 -8 21 -8 21 -8 21 -8 21 -8 21 -8 24 -5 24 -5 24 -5 Yes Yes Yes Yes Yes Yes Yes Yes Yes
B Noosa Drive Commercial (restaurant activities)
75 0 75 4 4 4 900 1 15 0 0 -10 -24 41 12 41 12 41 12 41 12 41 12 41 12 44 15 44 15 44 15 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Car passby 71 0 71 20 20 20 15 1 15 0 0 -10 -24 27 -2 27 -2 27 -2 0 -29 0 -29 0 -29 28 -1 28 -1 28 -1 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Car start 72 2 74 20 20 20 2 1 15 0 0 -10 -24 21 -8 21 -8 21 -8 0 -29 0 -29 0 -29 24 -5 24 -5 24 -5 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Car door closure 71 2 73 20 20 20 2 1 15 0 0 -10 -24 20 -9 20 -9 20 -9 0 -29 0 -29 0 -29 22 -7 22 -7 22 -7 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Total 42 13 42 13 42 13 42 13 42 13 42 13 45 16 45 16 45 16 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Criteria 50 35 30 55 40 35 65 45 40
Noosa Drive Commercial (Mechanical Plant)
55 0 55 4 4 4 900 1 18 0 0 -15 -25 15 -14 15 -14 15 -14 15 -14 15 -14 15 -14 18 -11 18 -11 18 -11 Yes Yes Yes Yes Yes Yes Yes Yes Yes
C Noosa Drive Commercial (restaurant activities)
75 0 75 4 4 4 900 1 18 0 0 -15 -25 35 6 35 6 35 6 35 6 35 6 35 6 38 9 38 9 38 9 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Car passby 71 0 71 20 20 20 15 1 18 0 0 -15 -25 20 -9 20 -9 20 -9 0 -29 0 -29 0 -29 21 -8 21 -8 21 -8 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Car start 72 2 74 20 20 20 2 1 18 0 0 -15 -25 14 -15 14 -15 14 -15 0 -29 0 -29 0 -29 17 -12 17 -12 17 -12 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Car door closure 71 2 73 20 20 20 2 1 18 0 0 -15 -25 13 -16 13 -16 13 -16 0 -29 0 -29 0 -29 15 -14 15 -14 15 -14 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Total 35 6 35 6 35 6 35 6 35 6 35 6 38 9 38 9 38 9 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Criteria 50 35 30 55 40 35 65 45 40
Noosa Drive Commercial (Mechanical Plant)
55 0 55 4 4 4 900 1 12 0 0 -10 -22 23 -6 23 -6 23 -6 23 -6 23 -6 23 -6 26 -3 26 -3 26 -3 Yes Yes Yes Yes Yes Yes Yes Yes Yes
D Noosa Drive Commercial (restaurant activities)
75 0 75 4 4 4 900 1 12 0 0 -10 -22 43 14 43 14 43 14 43 14 43 14 43 14 46 17 46 17 46 17 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Car passby 71 0 71 20 20 20 15 1 12 0 0 -10 -22 29 0 29 0 29 0 0 -29 0 -29 0 -29 30 1 30 1 30 1 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Car start 72 2 74 20 20 20 2 1 12 0 0 -10 -22 23 -6 23 -6 23 -6 0 -29 0 -29 0 -29 26 -3 26 -3 26 -3 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Car door closure 71 2 73 20 20 20 2 1 12 0 0 -10 -22 22 -7 22 -7 22 -7 0 -29 0 -29 0 -29 24 -5 24 -5 24 -5 Yes Yes Yes Yes Yes Yes Yes Yes Yes
Total 44 15 44 15 44 15 43 14 43 14 43 14 47 18 47 18 47 18 Yes Yes Yes Yes Yes Yes Yes Yes Yes
*Correction due to tonality and impulsiveness as per AS1055:2018.
Compliance is predicted on the condition the recommendation in Section 9 is implemented.
2023121 R01M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 16
Page 17
9. Recommendations
9.1 Road Traffic and Offsite Noise
Acoustic façade treatments are required to minimise noise from road traffic and offsite noise from
the neighbouring commercial premise. The dominant noise source, road traffic, is driving the
recommendation is listed for each noise-affected room.
9.1.1 Glazing
The minimum glazing treatments are presented in Table 13, with the installed glazing system to
comply with the following:
• The minimum glass thickness specified shall not be reduced regardless of the Rw
performance of the glazing system.
• If compliance cannot be achieved with the minimum Rw ratings, the glass system shall be
upgraded until compliance is achieved.
• Glazing specified with acoustic seals requires a Q-lon seal or an equivalent product, mohair
seals are not acceptable.
• The glazier shall provide NATA test reports on request to verify compliance with the minimum
Rw ratings. Generic reports are not acceptable.
Table 13: Rw Ratings & Glazing Treatments
Location Rw Ratings
Acoustic seals
QDC
Noise Glazing
Glazing
Roof
Wall
Unit Level Room Category
- B Restaurant - 41 - 35 10.38 lam yes
Kitchen/Living/Dining 1 41 - 35 10.38 lam yes
1 GF Bedroom 1 1 41 - 35 10.38 lam yes
Bedroom 2 1 41 - 35 10.38 lam yes
Kitchen/Living/Dining 1 41 - 35 10.38 lam yes
1 Bedroom 1 1 41 - 35 10.38 lam yes
Bedroom 2 1 41 - 35 10.38 lam yes
Kitchen/Living/Dining 2 41 - 35 10.38 lam yes
2 1 Bedroom 1 2 41 - 35 10.38 lam yes
Bedroom 2 2 41 - 35 10.38 lam yes
Kitchen/Living/Dining 2 41 - 35 10.38 lam yes
3 Bedroom 1 0 41 - 35 10.38 lam yes
Bedroom 2 0 41 - 35 10.38 lam yes
Kitchen/Living 1 41 38 35 10.38 lam yes
P1 2 Bedroom 1 1 41 38 35 10.38 lam yes
Bedroom 2 2 41 38 35 10.38 lam yes
Kitchen/Living 2 41 38 35 10.38 lam yes
P2 2 Bedroom 1 2 41 38 35 10.38 lam yes
Bedroom 2 2 41 38 35 10.38 lam yes
9.1.2 Alternative Ventilation
We recommend that all locations nominated in Table 13 have the provision for an alternative
ventilation system similar to air-conditioning or mechanical ventilation to allow windows and doors
to be closed. Refer to National Construction Code (NCC) 2022 requirements and AS1668.2
Mechanical Ventilation in Buildings.
2023121 R01M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 17
Page 18
9.1.3 Wall Construction
The wall construction recommendations from QDC MP4.4 are included in the table below. Note that
these are not the only allowable methods of construction for the development, and alternative
constructions to achieve the required Rw ratings may also be provided. QDC Noise Categories are
nominated in Table 13.
Table 14: QDC typical wall construction
QDC
Wall
Noise Minimum Wall Treatment
Rw
Category
Two leaves of clay brick masonry at least 110mm thick with cavity not less than 50mm
between leaves
OR
Single leaf of clay brick masonry at least 110mm thick with:
(i) a row of at least 70mm x 35mm timber studs or 64mm steel studs at 600mm centres,
spaced at least 20mm from the masonry wall; and
(ii) mineral insulation or glass wool insulation at least 50mm thick with a density of at least
11kg/m3 positioned between studs; and
(iii) One layer of plasterboard at least 10mm thick fixed to outside face of studs
2 41
OR
Single leaf of brick masonry at least 110mm thick with at least 13mm thick render on each
face
OR
Concrete brickwork at least 110mm thick
OR
In-situ concrete at least 100mm thick
OR
Precast concrete at least 100mm thick and without joints.
Single leaf of clay brick masonry at least 110mm thick with:
(i) a row of at least 70mm x 35mm timber studs or 64mm steel studs at 600mm centres,
spaced at least 20mm from the masonry wall; and
(ii) One layer of plasterboard at least 10mm thick fixed to outside face of studs
1 35
OR
Minimum 6mm thick fibre cement sheeting or weatherboards or plank cladding externally,
minimum 90mm deep timber stud or 92mm metal stud, standard plasterboard at least 13mm
thick internally.
0 N/A Standard Construction
9.1.4 Roof Construction
The roof construction recommendations from QDC MP4.4 are included in the table below. Note that
these are not the only allowable methods of construction for the development, and alternative
constructions to achieve the required Rw ratings may also be provided. QDC Noise Categories are
nominated in Table 13.
Table 15: QDC typical roof construction
QDC
Noise Roof Rw Minimum Roof Treatment
Category
Concrete or terracotta tile or metal sheet roof with sarking, plasterboard ceiling at least
2 38 10mm thick fixed to ceiling cavity, mineral insulation or glass wool insulation at least 50mm
thick with a density of at least 11kg/m3.
Concrete or terracotta tile or metal sheet roof with sarking, plasterboard ceiling at least
1 35
10mm thick fixed to ceiling cavity.
0 n/a Standard Construction
2023121 R01M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 18
Page 19
9.2 Onsite Activities
Noise impacts at the nearby sensitive receiver locations are predicted to comply with the nominated
criteria for all time periods on the condition the following recommendation are implemented:
• All glazing associated with the onsite restaurant shall be upgraded to achieve Rw32 with the
glass to be a minimum thickness of 10.38 laminate glass.
• Outdoor dining shall cease between the hours of 10pm to 7 am with any openable windows
or doors for the restaurant to remain closed except for the purposes of ingress or egress to
the restaurant.
• Amplified music will only be played within the inside of the restaurant, no speakers shall be
located withing the external areas. Noise limits from amplified music shall be limited to
83dB(A) when measured at a distance of 1 metre from the speaker. We recommend a
compliance assessment is undertaken in accordance with OLGR requirements before the
restaurant is operational to determine maximum allowable noise levels.
• As noted in Table 13, all units will comply with the minimum glazing thickness of 10.38mm
laminate glass achieving a minimum Rw 35. As noted Section 9.1.2 all units onsite will require
the provision of alternative ventilation to allow window and door to be closed.
9.2.1 Onsite Mechanical Plant
No information regarding mechanical services was available at the time of the assessment. We
recommend that any new mechanical plant is designed to comply with the noise criteria stated in
Section 6.2 with an assessment by qualified acoustic consultant to be conducted prior to installation.
9.2.2 Waste collection
We recommend that waste collection be conducted in accordance with the surrounding residential
properties with daytime hours of 7am to 6pm.
2023121 R01M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 19
Page 20
10. Conclusion A road traffic and environmental noise assessment was conducted for the proposed mixed-use development located at 2 Bottlebrush Avenue, Noosa Heads. On the condition the recommendations detailed in Section 9 are implemented, compliance is predicted with Noosa Shire Council assessment criteria. If you should have any queries, please do not hesitate to contact us. Report Prepared By Martin Jacobs Acoustic Consultant 2023121 R01M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 20
Page 21
11. Appendices 11.1 Development Plans 2023121 R01M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 21
Page 22
acousticworks))) TPOTTLE BKGSH MIXED USE Rook Ran GeoenD'idoe ace BOTTLE BHUSH MKED USE Roce nan tive a zu j 3 3 3 2023121 RO1M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 22
Page 23
JS TN. JS acousticworks))) 7 TOTTE BRUSH MINED USE poi @ | osama Sea) 1 a ee | | stares | accor | ; | =f | sans acco 2023121 RO1M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 23
Page 24
acousticworks))) stares acco [BOTTLE BRUSH MIXED USE JS ease $K3001 2023121 RO1M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 24
Page 25
acousticworks)))
exsrva wh
Une oue EXSTRG Hi
trae
by _— THRcONCRETE -
tr suseoce
sun To souncety
CONCRETE ma
conn a80NG
‘SCREENS TONAL
xp THR CONCRETE
aNTED
Son awanes
WHER LOOK,
SOREENNG TO CAREWE
NesorBOUMNG ELLOS
CONCRETE USGAN SEATEAB
PER PADE 2 OF THE NOOEA
Leads ceemanenescecaes!
‘SOTTLE BRUSH MIXED USE
JS
TN.
ARCHITECTS.
‘stam acco
2023121 RO1M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 25
Page 26
acousticworks De ] Tome anusn mn USE] — | . 3 TN. anaiea| 8 ancaTects | om wees JS | TN. | ARCHITECTS ] BOTTLE BRUSH MIXED USE | 3 | susan | 1 acco 2023121 RO1M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 26
Page 27
acousticworks)))
JS ] ] {DOTTIE BRUSH MIXED USE
|e | . 5
i | | scion |
ARCHITECTS LF | stares ‘accot
JS | Stfiascss sacemins| ] SOME BRUSH MIXED USE]
| | | s
° | | ji |
anchirects | | Sas | ceo
2023121 RO1M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 27
Page 28
11.2 Unit Numbering
GF-1
2023121 R01M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 28
Page 29
1F-2 1F-1
1F-3
2023121 R01M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 29
Page 30
acousticworks 2023121 RO1M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 30
Page 31
11.3 Noise Monitoring Charts 11.3.1 Road Traffic Noise and Ambient Noise Levels 2023121 R01M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 31
Page 32
acousticworks))) 71 Noosa Drive, Noosa Heads Road Traffic Noise Monitoring wo Saturday — 20/05/2023 80 Sound Pressure Level dB(A) 30 20 eegeaeeeeea2e2e32ea2932a293 82939 8293828282888 82eseseseeegeesegeseose2s83838828828888 888 or NOT HO OrF DOD WOKE NOTH OH DW WEE AM 2 Soe S52 22 8 SS 28 acs & Time 24hrs 71 Noosa Drive, Noosa Heads Road Traffic Noise Monitoring wo Sunday 2105/2023 Sound Pressure Level dB(A) 30 20 ggeegeeeeeeeeeeeegeeeeee2e8ee28e8 SeSssesege see 88 S858 8 8 6 6 eseseeegeqgaqgqs S Sar ASO FH OR HOS STAHRF HSK HRSEEEARSE Time 24hrs 2-1 sre Lid: ——Leq — Wo ---- sms Li0- —— Leq —Wo 2023121 RO1M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 32
Page 33
acousticworks))) 71 Noosa Drive, Noosa Heads Road Traffic Noise Monitoring Monday 2205/2023 one = a a 3 —=-Li0 s 5 § & 3 —— leq & —Ww cit) 20 2e:328e8888s8e82888288288282888828828 8 8 8B ae 5-5 8 &6© FF © © F&F &® ®@ SF FS A 8 FF BG G&G HF &® fF FG =- AB EG See eH Se 8 & SSS a SB Time 24hrs 71 Noosa Drive, Noosa Heads Road Traffic Noise Monitoring wo Tuesday 23/05/2023 Soe =z a vv S ——-Li10 S a 3 & 2 HH Z amet & ZU c 2 9° 3 — 30 20 + + eeeseaeadn 2 eeeseeag 2 eeee2e8 8$3e23s:sessesgseegsesessse8e238e8s38e28s8888888 S-ANAS tS SOR HOSSEHTAKRFTKESRNRKRSESHE ABS Se SS = oS 8 Eee See ace & Time 24hrs 2023121 RO1M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024 Page 33
Page 34
acousticworks))) 71 Noosa Drive, Noosa Heads Road Traffic Noise Monitoring 2 a 2 = ot a 3 7 : $ | ' ' | | | oO a So Q wo 2 + a > s 3 a a . 3 = 2 2 2 2 8 8 8 a (wap janeq eunssesg punos o0-0 00: 00:22 00:12 00:07 00:61 00:8) 00:21 00:91 00:S1 OoFL Oost O0:z1 00:41 00:01 00:6 00:8 00:2 00:9 00: 00: oo-€ Oot 0} 00:0 Time 24hrs 71 Noosa Drive, Noosa Heads Road Traffic Noise Monitoring -2-=U1 ——-Li0 ——Leq —0 Thursday 25/05/2023 o0-0 00-2 p 002% 00:12 00:02 00°61 00:8) 00:21 00:1 00's) Oo-FL y OOet o0:z1 00:14 00-01 00:6 00:8 00:2 00:9 00: 00 oo Oot ‘00:1 90 (wap janeq eunssesg punog 30 00:0 20 Time 24hrs Page 34 2023121 RO1M 2 Bottlebrush Avenue Noosa Heads RTN ENV.docx © Acoustic Works 2024