Original PDF page 13, section 1. The text section number identifies this passage in the reader.

          GENERAL NOTES                                                                                    EARTHWORKS AND PAVEMENT                                                                                                                                                                                  ROADWORKS NOTES
          GN1.        ALL DIMENSIONS AND SET OUT POINTS ARE TO THE KERB LINE OF THE                        CONSTRUCTION NOTES CONTINUED                                                                                      SEDIMENT & EROSION CONTROL                                                             RD1.    THE CONTRACTOR SHALL ESTABLISH THE LOCATION, LINE & LEVEL OF ALL PUBLIC
                      SPECIFIED KERB TYPE. REFER LOCAL AUTHORITIES STANDARD DRAWINGS FOR
                                                                                                           EW6.        ALL FILLING SHALL BE CLEAN EXCAVATED MATERIAL FREE FROM TOPSOIL
                                                                                                                                                                                                                             NOTES                                                                                          & PRIVATE UTILITY SERVICES PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION.
                      KERB TYPE DETAILS.                                                                                                                                                                                                                                                                                    WHERE UTILITY SERVICES ARE SHOWN ON THE PLANS, THEY ARE SHOWN FOR
                                                                                                                       AND VEGETATION.
                                                                                                                                                                                                                             SE1.   GENERAL:                                                                                THE INFORMATION OF THE CONTRACTOR ONLY. THE PRINCIPAL SHALL NOT BE
          GN2.        FINAL LOCATIONS OF CONDUITS SHALL BE PROVIDED WHEN AVAILABLE FROM                                                                                                                                                 a. TEMPORARY DRAINAGE CONTROL. FLOW SHOULD BE                                       LIABLE FOR ANY OMISSION OF SERVICES FROM THE PLANS OR THE ACCURACY OF
                                                                                                           EW7.       THE EXISTING SITE WON MATERIALS MAY CONTAIN ROCKS AND COBBLES
                      SERVICE AUTHORITIES. (IF REQUIRED).                                                                                                                                                                                    DIVERTED AROUND THE WORK SITE WHERE POSSIBLE.                                  ANY SERVICES SHOWN ON THE PLANS.
                                                                                                                      AND THESE SHALL BE EXCLUDED OVER 100mm NOMINAL SIZE IN ANY
                                                                                                                      EXISTING MATERIAL USED AS FILLING.                                                                                b.   ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE
          GN3.        ALL CONSTRUCTION SHALL JOIN SMOOTHLY TO EXISTING.                                                                                                                                                                      INSTALLED AND BE OPERATIONAL BEFORE COMMENCING                         RD2.    SURFACE LEVELS OVER THE SITE HAVE BEEN INTERPOLATED THROUGH
                                                                                                                                                                                                                                             UP-SLOPE EARTHWORKS.                                                           COMPUTER MODELING OF FIELD SURVEY DATA. THESE CALCULATED LEVELS MAY
                                                                                                           EW8.        ANY IMPORTED FILLING MATERIAL REQUIRED TO MAKE UP SHORTFALLS IN
          GN4.        NOTIFY ALL RELEVANT AUTHORITIES PRIOR TO COMMENCEMENT OF WORK                                                                                                                                                     c.   ALL SEDIMENT & EROSION CONTROL DEVICES MUST BE                                 VARY FROM THE ACTUAL GROUND LEVEL.
                      WITHIN EXISTING ROAD RESERVES.                                                                   QUANTITIES SHALL BE CLEAN SOIL MATERIAL FREE FROM TOPSOIL,
                                                                                                                       VEGETABLE MATTER AND OTHER DELETERIOUS MATERIAL. THE FILLING                                                          REGULARLY INSPECTED AND MAINTAINED BY THE
                                                                                                                                                                                                                                             CONTRACTOR. INSPECTIONS SHOULD OCCUR ON A WEEKLY                       RD3.    ALL CONSTRUCTION LEVELS SHALL BE SET BY THE CONTRACTOR WITH
          GN5.        THE CONTRACTOR SHALL CONTACT ALL RELEVANT SERVICE AUTHORITIES FOR                                SHALL BE FREE FROM COBBLES OR ROCKS IN EXCESS OF 100mm NOMINAL
                                                                                                                                                                                                                                             BASIS (MINIMUM), ALONG WITH BEFORE AND AFTER                                   REFERENCE TO SURVEYED BENCH MARKS PROVIDED BY THE PRINCIPAL'S
                      DETAILED LOCATION AND LEVEL OF SERVICES PRIOR TO COMMENCEMENT OF                                 SIZE. THE MATERIAL SHALL HAVE A MINIMUM SOAKED CBR 15 UNLESS
                                                                                                                                                                                                                                             SIGNIFICANT RUNOFF PRODUCING STORMS.                                           APPOINTED SURVEYOR.
                      WORKS AND THE SITE. ANY DAMAGE TO EXISTING SERVICES SHALL BE                                     OTHERWISE APPROVED BY THE SUPERINTENDENT.
                                                                                                                                                                                                                                        d. ALL DISTURBED LAND MUST BE RENDERED EROSION-PROOF
                      RECTIFIED AT THE CONTRACTORS EXPENSE.                                                                                                                                                                                  BY THE ESTABLISHMENT OF 80% EFFECTIVE GROUND                           RD4.    SUBGRADE EVALUATION IS TO BE UNDERTAKEN IN ACCORDANCE WITH THE
                                                                                                           EW9.        ALL FILLING SHALL BE PLACED IN MAXIMUM 200mm LOOSE LAYER
                                                                                                                                                                                                                                             COVER WITHIN 28 DAYS OF FINAL EARTHWORKS TRIM.                                 PROCEDURES OUTLINED IN ARRB SR41 - A STRUCTURAL DESIGN GUIDE FOR
          GN6.        ALL WORK SHALL CONFORM WITH THE RELEVANT LOCAL AUTHORITY'S                                       THICKNESS WITH EACH LAYER COMPACTED TO AT LEAST 98% COMPACTING
                                                                                                                                                                                                                                        e. IN AREAS WHERE RUNOFF TURBIDITY IS TO BE                                         FLEXIBLE RESIDENTIAL STREET PAVEMENTS.
                      SPECIFICATIONS AND REQUIREMENTS.                                                                 AS MEASURED BY THE STANDARD METHOD DESCRIBED IN AS 1289.
                                                                                                                                                                                                                                             CONTROLLED, EXPOSED SURFACES TO BE EITHER
                                                                                                                                                                                                                                             MULCHED, COVERED WITH EROSION CONTROL BLANKETS                         RD5.    ALL KERBING SHALL CONFORM TO LOCAL AUTHORITY COUNCIL'S RELEVANT
                                                                                                           EW10.      REFER TO THE GEOTECHNICAL REPORT REGARDING REMOVAL AND
          CLEARING OF VEGETATION                                                                                      REPLACEMENT OF EXISTING FILLING MATERIAL. THIS NOTE SHALL APPLY TO                                                     OR TURFED IF EARTHWORKS ARE EXPECTED TO BE                                     STANDARD DRAWINGS.
                                                                                                                      THE SUBGRADE UNDER ALL ROADS, DRIVEWAYS AND FILL BATTERS.                                                              DELAYED FOR MORE THAN 14 DAYS.
          VE1.        NO CLEARING SHALL BE CARRIED OUT BEYOND THE EXTENT                                                                                                                                                                f.   STRAW BALE SEDIMENT TRAPS ARE A SECONDARY OPTION                       RD6.    ALL ROADSIDE VERGE AREAS AND BATTERS SHALL BE TOP S OILED TO A
                                                                                                                      FOLLOWING THE SITE STRIP AND DRIVEWAY SET OUT THE ENGINEER SHALL                                                                                                                                      MINIMUM DEPTH OF 100mm (LIGHTLY COMPACTED) AND TURFED.
                      OF EARTHWORKS OR WHERE NECESSARY FOR SERVICES                                                   BE CALLED TO SITE TO DETERMINE THE PRESENCE OF ANY EXISTING FILL                                                       WHICH GENERALLY SHOULD NOT BE USED IF OTHER
                      CONSTRUCTION WITHOUT THE WRITTEN APPROVAL OF THE                                                UNDER DRIVEWAYS AND ASSOCIATED BATTERS. PROVIDE A BACKHOE FOR                                                          OPTIONS ARE AVAILABLE.
                      SUPERINTENDENT.                                                                                                                                                                                                                                                                               RD7.    PAVEMENT MARKINGS AND SIGNS SHALL BE PROVIDED IN ACCORDANCE WITH THE
                                                                                                                      THE TEST PIT EXPLORATION. THE ENGINEER MAY DIRECT EXISTING LOOSE                                                                                                                                      QUEENSLAND MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES.
                                                                                                                      FILL TO BE REMOVED AND RE-COMPACTED.                                                                   SE2.   SEDIMENT CONTROL FENCE:
          VE2.        MILLABLE LOGS ARE TO BE REMOVED FOR SAWMILLING.                                                                                                                                                                   g. NOT TO BE LOCATED IN AREAS OF CONCENTRATED FLOW.
                                                                                                                                                                                                                                        h. NORMALLY LOCATED ALONG THE CONTOUR WITH A                                RD8.    PROVIDE TELSTRA AND ENERGEX CONDUITS UNDER CONCRETE DRIVE-WAYS,
                                                                                                           EW11.      ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND                                                                                                                                       WHERE DIRECTED.
          VE3.        SUITABLE MATERIAL IS TO BE MULCHED FOR REUSE ON SITE.                                           FULLY OPERATIONAL BEFORE COMMENCING UP-SLOPE EARTHWORKS.                                                              MAXIMUM CATCHMENT AREA 0.6 HA PER 100M LENGTH OF
                                                                                                                                                                                                                                            FENCE.
          EARTHWORKS AND PAVEMENT                                                                          EW12.       ALL EXISTING UNDERGROUND SERVICES TO BE LOCATED AND MARKED                                                       i.  WOVEN FABRICS ARE PREFERRED, NON-WOVEN FABRICS
                                                                                                                                                                                                                                                                                                                    DRAINAGE NOTES
                                                                                                                       PRIOR TO COMMENCING EARTHWORKS.                                                                                      MAY BE USED ON SMALL WORK SITES, I.E. OPERATIONAL
          CONSTRUCTION NOTES                                                                                                                                                                                                                PERIOD LESS THAN 6 MONTHS OR ON SITES WHERE                             DN1.    1.5m WIDE EASEMENTS SHALL BE CREATED OVER ALL INTER-ALLOTMENT
                                                                                                           EW13.      FILL DENSITY TESTING SHALL CONFORM TO THE FOLLOWING:                                                                  SIGNIFICANT SEDIMENT RUNOFF IS NOT EXPECTED.                                    DRAINAGE LINES UNO.
          EW1.        THE CONTRACTOR SHALL PROVIDE CERTIFICATION FROM A RPEQ QUALIFIED                                      a. 1 TEST PER 500 cu.m - GENERALLY                                                                          j.  WHERE FENCES NEED TO BE LOCATED ACROSS THE
                      ENGINEER THAT THE WHOLE OF THE EARTHWORKS AND GEOTECHNICAL                                           b. 1 TEST PER 2 LAYERS PER 40m - TRENCH BACKFILL                                                                 CONTOUR - REFER IPEAW STANDARD DRAWING D-0040 FOR                       DN2.    PIPE BEDDING AND BACKFILL ARE IN ACCORDANCE WITH LOCAL AUTHORITIES
                      SUPERVISION COMPLIES WITH AS3798 FOR                                                                                                                                                                                  DETAILS.                                                                        REFERENCED SPECIFICATION AND/OR STANDARD DRAWINGS.
                                                                                                           EW14.       PLACEMENT OF FILL SHALL CONFORM TO THE FOLLOWING MINIMUM DRY                                                     k.  FENCES ARE REQUIRED 2m MIN FROM TOE OF CUT OR FILL
          EW2.        THE CONTRACTOR SHALL REFER TO GEOTECHNICAL INVESTIGATION                                         DENSITY RATIO (M.D.D.R.) COMPACTION STANDARDS:                                                                       BATTERS, WHERE NOT PRACTICAL ONE FENCE CAN BE AT                        DN3.    PIPE MATERIALS ARE UPVC SEWER PIPE MINIMUM CLASS SN4; UPVC DRAINAGE
                      REPORT - (IF AVAILABLE)                                                                              c.   ALLOTMENTS = 98% STD                                                                                        THE TOE WITH A SECOND FENCE 1M MIN AWAY. FENCE                                  PIPE PLASCOR OR EQUIVALENT OF EQUIVALENT CLASS TO UPVC SEWER CLASS
          EW3.        ALL EXISTING UNDERGROUND SERVICES TO BE LOCATED AND MARKED PRIOR                                     d. ROAD VERGES/EMBANKMENTS = 98% STD                                                                             SHOULD NOT BE LOCATED PARALLEL WITH TOE IF                                      SN4; R.C.P. CLASS "2" RUBBER RING JOINTED OR F.R.C. PIPE CLASS "X" RUBBER
                      TO COMMENCING EARTHWORKS.                                                                            e. PAVEMENT SUBGRADE = 100% STD FOR NON-COHESIVE                                                                 CONCENTRATION OF FLOW WILL OCCUR BEHIND THE FENCE.                              RING JOINTED.
                                                                                                                                MATERIALS, M.D.D.R. = 80%
          EW4.        THE LIMITS OF CUTTING AND FILLING SHALL BE GENERALLY AS SHOWN ON THE                                                                                                                                   SE3.   TEMPORARY CONSTRUCTION ENTRY/EXIT SEDIMENT TRAP:                                DN4.    UPVC PIPES ARE EITHER RUBBER RING JOINTED OR SOLVENT WELD JOINTED.
                      DRAWINGS. THE CONTRACTOR SHALL SET OUT THESE LIMITS FOR INSPECTION                   EW15.       ALL ALLOTMENTS OR AREAS SUBJECT TO EARTHWORKS ARE TO BE FREE                                                     l. ADJACENT STORMWATER RUNOFF TO BE DIVERTED AWAY                                   STANDARD MANUFACTURER'S FITTINGS ARE USED IN BOTH CASES.
                      BY THE ENGINEER PRIOR TO CONSTRUCTION. AMENDMENTS TO EARTHWORKS                                  DRAINING WITH A MINIMUM SLOPE OF 1:100.                                                                             FROM ENTRY/EXIT.
                      AND FINISHED SURFACE CONTOURS MAY BE ADJUSTED BY THE WRITTEN                                                                                                                                                      m. WHEEL - WASH OR SPRAY UNIT MAY BE REQUIRED DURING                        DN5.    FRC AND RCP SYSTEMS ARE CONSTRUCTED BY EMBEDDING THE LOWER PRECAST
                      DIRECTION OF THE ENGINEER DURING CONSTRUCTION.                                       EW16.      ALL EXISTING GRASSED AREAS DISTURBED DURING CONSTRUCTION SHALL                                                       WET WEATHER.                                                                     SECTION INTO A WET CAST-INSITU CONCRETE BASE. CUT OUTS FOR PIPE
                                                                                                                      BE TOP SOILED TO A MINIMUM DEPTH OF 100mm AND TURFED OR SEEDED                                                                                                                                        PENETRATIONS ARE MADE USING CONCRETE SAWS/DRILLS WHILE MINIMIZING
          EW5.        SITE PREPARATION:                                                                               WITH A MINIMUM STRIKE RATE OF 80% PRIOR TO ANY 'ON MAINTENANCE'                                        SE4.   SAFETY ISSUES MUST BE CONSIDERED AT ALL TIMES, INCORPORATE                              DAMAGE TO THE ADJACENT PIPE MATERIALS.
                      a. STRIP TOPSOIL MIN 150 OR MORE AS REQUIRED TO REMOVE ALL                                      INSPECTION.                                                                                                   TRAFFIC CONTROL DEVICES .
                           VEGETABLE MATTER TO THE BASE OF THE SUB GRADE.                                                                                                                                                                                                                                           DN6.    LIDS TO CAST-IN-SITU MANHOLES ARE LIGHT DUTY, CLOSE FITTING BOLT DOWN
                                                                                                           EW17.       ALL TEMPORARY STOCKPILES (IF APPLICABLE) TO HAVE 1:6 MAXIMUM SIDE                                     SE5.   IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT ALL                                CAST IRON OR GALVANISED STEEL, CONCRETE INFILL TYPE (GATIC LIGHT DUTY,
                      b.    FURTHER EXCAVATE IF REQUIRED TO BOX OUT TO MINIMUM PAVEMENT                                BATTERS (GRASS SEEDED).                                                                                      SEDIMENT AND EROSION CONTROL MEASURES HAVE BEEN                                         POLYCRETE BROADSTEL OR SIMILAR) OF APPROXIMATELY THE SAME INTERNAL
                            THICKNESS. REMOVE AND RE-COMPACT FILL AS PER GEOTECHNICAL                                                                                                                                               ADDRESSED AS STIPULATED IN THE ENVIRONMENTAL MANAGEMENT                                 DIMENSIONS AS THE MANHOLE.
                            REPORT NOTE ON THIS DRAWING.                                                          SEDIMENT & EROSION CONTROL PROGRAM                                                                                PLAN. ADDITIONAL OR DIFFERENT SEDIMENT & EROSION CONTROL
                                                                                                                       OBJECTIVE/TARGET                    THE CONTRACTOR MUST COMPLY WITH ALL STATUTORY                            DEVICES MAY BE REQUIRED DURING CONSTRUCTION PHASE TO                            DN7.    ALL STEEL GRATES AND FRAMES TO BE HOT DIPPED GALVANIZED AND SHALL BE
                                                                                                                                                           REGULATIONS AND MAINTAIN THEM DURING EARTHWORKS/                         COMPLY WITH THE ABOVE.
                      c.    COMPACT SUBGRADE TO A MIN RELATIVE DENSITY RATIO OF 98%                                                                        CONSTRUCTION. ALL PROVISIONS AND SPECIFICATIONS                                                                                                                  CYCLE PROOF IN ACCORDANCE WITH AS 3996.
                            STANDARD COMPACTION AS DEFINED IN AS 1289 IN THE TOP 200.                                                                      OUTLINED WITH THE APPROVED ENVIRONMENTAL
                                                                                                                                                           MANAGEMENT PLAN MUST BE ADHERED TO, ALONG WITH                    SE6.   TEMPORARY STOCKPILES TO HAVE 1:6 SIDE BATTERS (MAXIMUM) AND
                                                                                                                                                           ALL EROSION AND SEDIMENT CONTROL MEASURES                                                                                                                DN8.    LIDS MATCH FINISHED SURFACE GROUND SLOPE AND SIT PROUD AS SHOWN ON
                      d.    COMPACT AND PROOF ROLL ALL PREPARED SUBGRADE AREAS PRIOR TO                                                                    PRESCRIBED WITHIN THESE DRAWINGS BY THE                                  BE SHAPED TO ENSURE RUN-OFF IS TREATED AND MANAGED TO THE                               THE LOCAL AUTHORITIES STANDARD AND ARE MARKED "STORMWATER"
                            PLACING ANY FILLING. COMPACTION SHALL BE 100% COMPACTION AS                                                                    SITE ENGINEER                                                            SATISFACTION OF THE SUPERINTENDENT. ALL EXPOSED STOCKPILE                               IMPRESSED INTO THE CONCRETE INFILL. INFILL CONCRETE IS CLASS N25.
                            MEASURED BY THE STANDARD METHOD DESCRIBED IN AS1289 UNO.                                   MANAGEMENT                          THE SITE FOREMAN IS TO IDENTIFY AND CHECK THE
                                                                                                                                                                                                                                    SURFACES TO BE GRASS SEEDED. SEDIMENT FENCES AND CUT-OFF
                                                                                                                       STRATEGY                            DIRECTION OF STORMWATER FLOWS AS SHOWN ON PLAN.                          DRAINS MAY BE REQUIRED.                                                         DN09.   UPVC PIPE AND KERB ADAPTORS ARE USED WHERE DISCHARGE IS INTO THE KERB
                                                                                                                                                           PROVIDE BARRIERS AND OTHER MEASURES SHOWN ON
                      e.    EXCAVATE AND REPLACE WITH STRUCTURAL FILL ANY SOFT SPOTS OR                                                                    PLAN TO PREVENT STORMWATER FLOWS OVER                                                                                                                            AND CHANNEL.
                            HEAVING SUBGRADE AREAS. STRUCTURAL FILL SHALL BE APPROVED                                                                      EMBANKMENTS, AND SEDIMENT INTO GULLY PITS
                            GRANULAR FILL (100mm MAXIMUM PARTICLE SIZE, MINIMUM SOAKED CBR                                                                                                                                                                                                                          DN10.   INTER-ALLOTMENT DRAINAGE LINES ARE LOCATED 0.5 METRES FROM REAR OR
                                                                                                                       TASKS / ACTIONS                     ERECT SEDIMENTATION BARRIERS AS DETAILED.
                            15 PLACED IN LAYERS NOT EXCEEDING 200mm AND COMPACTED TO                                                                       STRATEGICALLY PLACE CHECK DAMS                                           NOTE:                                                                                   SIDE BOUNDARIES WITHIN THE PROPERTIES SERVED.
                            ACHIEVE NOT LESS THAN 98 % MAXIMUM RELATIVE DRY DENSITY                                                                        AROUND GULLY PITS
                                                                                                                                                                                                                                    EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE DESIGNED
                            (STANDARD), OR 75 % DRY DENSITY INDEX IN ACCORDANCE WITH AS 1289.                          PERFORMANCE                         THE SITE FOREMAN IS TO CHECK FOR EROSION AND                             AND PROVIDED IN ACCORDANCE WITH THE INTERNATIONAL EROSION                       DN11.   MATERIALS AND CONSTRUCTION ARE IN ACCORDANCE WITH COUNCIL'S
                            SITE FILLING MATERIAL AND COMPACTION UNDER THE PAVING AND                                  INDICATORS                          SEDIMENT FLOWS AT THE BASE OF EMBANKMENTS AFTER
                                                                                                                                                                                                                                    CONTROL ASSOCIATION (AUSTRALASIA) 2018's "BEST PRACTICE                                 STANDARD SPECIFICATION FOR STORMWATER DRAINAGE.
                                                                                                                                                           SIGNIFICANT RAINFALL AND SHOULD ASCERTAIN THE
                            BUILDING SHALL BE AS ABOVE.                                                                                                    WORKING EFFECTIVENESS OF CHECK DAMS DURING                               EROSION AND SEDIMENT CONTROL FOR BUILDING AND
                                                                                                                                                           THIS WET WEATHER                                                         CONSTRUCTION SITE.                                                              DN12.   THE CONTRACTOR SHALL CONFIRM ALL LEVELS BEFORE COMMENCING WORK.
           UNDERGROUND SERVICES                                                                                        FREQUENCY /                         SITE FOREMAN TO MONITOR PERFORMANCE AFTER                                    .

           UNDERGROUND SERVICES HAVE BEEN LOCATED ONLY WHERE OBVIOUS. SOME SERVICES
                                                                                                                       DEADLINE                            EVERY HEAVY DOWNFALL
                                                                                                                                                                                                                               APPROVED PLAN                                                                        DN13.   THE CONTRACTOR SHALL CONTACT ALL RELEVANT AUTHORITIES AND LOCATE
                                                                                                                                                                                                                                                                                                                            ALL SERVICES BEFORE COMMENCING WORK.THE CONTRACTOR SHALL BE
                                                                                                                                                                                                                        RAL20/0017 & OPW20/0144
                                                                                                                       RESPONSIBILITY                      THE SITE FOREMAN IS RESPONSIBLE FOR ALL INSPECTIONS
           THAT WERE NOT OBVIOUS AND ARE NOT SHOWN ON THE PLAN MAY STILL BE PRESENT. IT                                                                                                                                                                                                                                     RESPONSIBLE FOR ANY DAMAGE CAUSED TO SERVICES BY THE WORKS
           IS THE RESPONSIBILITY OF ANY PERSON EXCAVATING / BUILDING, ON OR ADJACENT TO                                REPORTING REVIEW                    SITE WORKMEN ARE TO ADVISE THE FOREMAN IF ANY                                                                                                                    IRRESPECTIVE OF WHETHER THE SERVICES ARE SHOWN ON THE DRAWINGS OR
           THE SITE TO CONFIRM WITH THE RELEVANT AUTHORITY THE LOCATION OF SERVICES.                                                                       SEDIMENT & EROSION CONTROL DEVICES ARE FAILING
                                                                                                                                                                                                                               NOOSA COUNCIL                                                                                NOT.
           THE AUTHOR OF THIS PLAN ACCEPTS NO RESPONSIBILITY FOR DAMAGE TO SERVICES                                    CORRECTIVE ACTIONS                  THE SITE FOREMAN IS TO REPORT AND ORDER THROUGH
           SHOWN OR NOT SHOWN ON THIS PLAN.
                                                                                                                                                                                                                             3 December 2020
                                                                                                                                                           SUPERVISOR, EXTRA BARRIER OR CHECK DAMS AS
                                                                                                                                                           REQUIRED

                                                                                                                                                                                                                                                                                                   PROJECT:                                                                             JOB NUMBER
                                                                                                                                                                                                                                        .
     REV DATE DESCRIPTION                                   BY     CHKD                                                             SCALE                                                       APPROVED
                                                                                                                                                                                                                                                                                                                                                                                            2023
      A    05-06-20   ORIGINAL ISSUE                         AD      CL
      B    14-10-20   RESPONSE TO INFORMATION REQUEST        AD      CL   DATUM                 AHD                                                                                                                                                                                                                                                                                SHEET:    2   OF     10
                                                                                                       0             1.0            2.0             3.0            4.0              5.0m
                                                                          DESIGN                AD                                                                                             .................                                                                                                                                                                   DRAWING NUMBER        REV
                                                                                                                                                                                                                                                                                                   DRAWING TITLE:
                                                                          DRAWN                 AD                                                                                         Director: CAMERON LANDRETH
                                                                                                                                  SCALE 1:100 A3
                                                                          DESIGN CHECK          CL                                                                                               (RPEQ 19358)                          07 5443 8285
                                                                                                                                                                                                                                                                                                                                                                                        R02                  B
                                                                                                                                                                                                                                       [email protected]      www.barlowshelley.com.au
                                                                                                      This drawing is not to be copied or amended without written permission from
Document Set ID: 21311509                                                 DATE            JUNE 2020   Barlow Shelley Consulting Engineers                                                                                              PO Box 899, Maroochydore,4558 ABN 89 215 591 077
Version: 1, Version Date: 03/12/2020
Log in to download the original file

RAL20 0017 Approved Plans.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.