Original source · versioned page text
2018-05-08 Planning & Environment Committee Agenda
The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
BRANCH ACTIVITIES RECENT ACHIEVEMENTS CURRENT PRIORITIES THE NEXT QUARTER
Development Assessment
Local Government Infrastructure Plan for Minister review of draft LGIP and Public Notification of draft LGIP and Review of submissions received to
existing planning scheme approval to proceed to public supporting documents draft LGIP by Council and resolve to
consultation received proceed
Second independent review of draft
LGIP
Minister’s second review of draft
LGIP and approval for Council to
adopt
Council adoption of LGIP
Local Government Infrastructure Plan for Working group formed for LGIP Transference of Unitywater’s DMaTT Finalise draft LGIP
next planning scheme Audit of existing trunk networks model to Council’s T1 property Submit draft LGIP to independent
Review of future works proposed for system reviewer
trunk networks Review LGIP mapping of Priority Report draft LGIP to Council as part
Reviewing and refining Unitywater’s Infrastructure Area (PIA) & Plans for of the next planning scheme
DMaTT population and development Trunk Infrastructure (PFTI)
model
Auditing program for Advertising Devices Agreement reached with a number Currently auditing signage in the Continue auditing program for
of business owners in Tewantin and Noosaville industrial area advertising devices – Hinterland
Noosa Junction to address non- Ongoing inspection of signage area
compliant signage complaints and advice on signage
requirements
Discussions commenced with
business owners with non-compliant
signage in Tewantin & Noosa
Junction
Business as Usual activities Two Appeals withdrawn including Preparation work for Thomco Continued assessment of
Harbour (Swim School) and Kenlynn Appeal, with joint expert reports Development Applications lodged
(2 lot subdivision) being prepared. under The Noosa Plan
Monthly reporting to Treasury QLD Preparation work for Kenlynn Appeal
State Government and Australian (6 lot subdivision)
Bureau of Statistics on development Compliance action commenced with
approval information. Palm Lakes, Altum Developments,
Infringement Notice Module for and a number of sites for breaches
planning non-compliances of The Noosa Plan
established Internal guideline identifying
responsibilities for works on road
reserve
Page 123 of 125
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.