Original source · versioned page text
2018-05-08 Planning & Environment Committee Agenda
The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 8 MAY 2018
Figure 12: Part basement plan for building 4B – POSCWP encroachment
The proposal seeks to vary the 6 metre setback to the rear POSCWP by intruding into the
setback between 969mm and 1.28 metres. This relates to a small section of the basement which
protrudes above the ground. Predominantly the proposal accords with the rear setback
requirement and will not result in the removal of vegetation. The variation does not cause conflict
with the bushfire requirements. The setbacks are considered to meet the Specific Outcomes of
the Noosa Heads Locality Code and will not negatively impact upon the streetscape of Serenity
Close or adjoining properties.
5. CONCLUSION & REASONS FOR DECISION
The application seeks to make changes to the form of the development with the number of
dwellings and the density remaining the same as the original approval. Whilst the proposed
changes result in minor variation to the roof pitch, change to the area of roof which encroaches
above the 15 metre height limit, and minor variations to existing setback variations, the
development remains generally consistent with the existing approval. No concerns are raised
with respect to the reduced setbacks or the building height which is consistent with previous
approvals for the sites and approved development on an adjoining allotment. The proposed
buildings are setback in accordance with the conditions of the lot reconfiguration from the Private
Open Space area with the exception of a small area of basement on Lot 8. There are no issues
with regards to Gross Floor Area and Site Cover.
It is therefore recommended that the application be approved.
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Officer Community Development Financial Services
Executive Support Community Facilities ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property
Waste & Environmental Health Revenue Services
Executive Services X Environment & Sustainable Development Infrastructure Services
Community Engagement Building & Plumbing Services Asset Management
Customer Service X Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning Infrastructure Planning,
Design and Delivery
Page 87 of 125
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.