                                                            Traffic Engineering Report 11347
                                                          MCU: Agricultural Use Poultry Farm
                                                                              Milligan Farms
                                                                                   June 2013

        Week 3              Grain              5             10              1.4
        Week 4              Grain              6             12              1.7
        Week 5              Grain             10             20              2.9
        Week 6              Grain             10             20              2.9
        Week 7              Grain             24             44              6.3
        End of Batch     Chooks Depart        44             88              12.6
        Total                                             24 trips       3 to 4 trips
        Average                                          per week          per day

The staff manager resides on the site and therefore no additional staff trips are
required. Additional trips for small maintenance supplies will be undertaken as multi-
purpose trips and part of the trip generation for the existing residential dwelling.
Therefore the existing poultry operation will generate an average of 4 trips per
day including 3 truck movements.

Based on the information provided above, the impact of traffic generated from
the site is actually reduced from 76 trips per day to 12 trips per day (8 trips per
day during the peak avocado season and an average of 4 trips per day for the
poultry farm).


4.3    Trip Distribution and Assignment

Trip origin and destination for the proposed development has been assessed. All
routes to and from the site will travel east along Top Forestry Road, turning left into
Old Ceylon Road and then right into Cooroy-Belli Creek Road and returning to the
Bruce Highway.

The types of vehicles accessing the site will be a combination of light vehicles, semi-
trailers and 19m B-doubles. The arrival and departure of chickens will be undertaken
via semi-trailers and the delivery of grain will be via 19m B-doubles. It must be noted
that only 19m B-doubles are proposed and not 25m B-doubles. As per TMR’s
Guidelines for Multi-Combination Vehicles in Queensland (Clause 4.1.3), 19m B-
doubles can operate on all general access roads and an approved B-double route is
NOT required. It is envisaged that during peak periods there will be 3 semi / B-
double trips per day

              Table 5 – Average Daily Trips and Types of Vehicles
              Use                Average Daily Trips & Types Of Vehicles
          Poultry Trips                         3 Trucks
                                       (19m Semi or 19m B-Double)
          Poultry Trips                      1 Light Vehicle
          Avocado Trips                         2 Mini Bus
          Avocado Trips                           1 Truck
          Avocado Trips                      4 Light Vehicles




                                                                                    Page 10
Log in to download the original file

2184 Traffic Report - Poultry Farm- Cooroy (RFI June 2013).pdf · 2.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.