Fauna Management
78. Vegetation must only be removed or disturbed in accordance with a Fauna Management
Plan (or part thereof) prepared by a qualified person* and endorsed through an Operational
Works approval. *(Refer to Advisory Note)
79. Permanent artificial nesting boxes must be installed within the Koala Habitat (Core) to provide
compensatory habitat for arboreal mammals and hollow dependent avian species. The works
must be undertaken in accordance with an Operational Works approval.
Bushfire Management
80. The development must be carried out in accordance with the approved Bushfire Hazard
Assessment Report & Mitigation Plan version 4 dated 30 April 2022, and as amended by the
Further Advice letter from Rob Friend and Associates Pty Ltd dated 10 February 2023, listed
within this Decision Notice, with the exception of the following:
a. Establishment of an additional evacuation point offsite within the golf course that is
separated from buildings and is located outside of identified bushfire hazard prone
areas or potential impact buffer.
The report must be resubmitted to Council incorporating the above amendments prior
to the issue of any Development Permit for Operational Works. *
*(Refer to Advisory Note)
81. Certification must be submitted to Council from a qualified person* which certifies that the
4
development has been constructed in accordance with the bushfire management conditions
of this Decision Notice. *(Refer to Advisory Note)
T
82. Certification must be submitted to Council from a qualified Person which certifies that the
development is sufficiently serviced by reticulated water with hydrant standpipes, in ground
EN
hydrants and water pressure to meet firefighting needs in an emergency.
83. A copy of the Bushfire Hazard Assessment Report & Mitigation Plan and evacuation
procedure listed within this Decision Notice must be provided to the nearest fire authority.
M
*(Refer to Advisory Note)
WASTE DISPOSAL
H
84. Prior to the issue of any Operational Works approvals for this development an Operational
C
Waste Management Plan must be submitted to Council. The Waste Management Plan must
be in accordance with the Waste management Code and Planning Scheme Policy 9 - Waste
TA
Management.
85. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9 - Waste Management. The facilities must include an impervious
AT
area, within the site, correctly sized for all refuse and recycling containers and suitably
screened from public places and neighbouring properties. A bin wash area is required with a
cold-water tap, hose and drain outlet connected to sewer, via a bucket trap. The drain outlet
must be designed to prevent storm water entry to the sewerage system.
86. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
87. Storage, disposal and management of solid, liquid and vegetative waste is conducted in a
safe and ecologically sustainable manner without environmental nuisance. In this regard,
vegetated waste must be disposed of via a green waste bin or at a local transfer station.
Page 10 of 10
Document Set ID: 22632986
Version: 7, Version Date: 07/11/2023
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Further Council Report MCU21-0110.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.