Original source · versioned page text
Further Council Report MCU21-0110.pdf
LEGEND
SITE BOUNDARY
2 ID DESCRIPTION
DA3.01
1
BAL1 COMBINED SOLID & ALUMINIUM ANGLE
DA3.02
BALUSTRADE
FIN1 RENDERED CONCRETE
FIN3 NATURAL STONE WALL
39620 39620
RF1 TERRACOTTA TILE ROOF
P5 P4
SCR1 POWDERCOATED ALUMINIUM BATTEN SCREENING
37550
RF1 P3
SCR2 POWDERCOATED ALUMINIUM WINDOW SCREENING
36180
35650 SH1 POWDERCOATED ALUMINIUM SUNHOOD
P2
FIN1 BAL1 P1 33690
FIN1
RL 35.10
P1
Level 3 SH1 32550
SCR2
RL 31.90
P1
Level 2 FIN3
SCR1
RL 28.70
LEVEL 1 P5 - Assumed NGL
31500 under roof ridge
line
RL 25.50
GROUND LEVEL
FIN3
P4 - Assumed NGL 30300 SCR2
under roof ridge line
3
RL 22.30
LOWER GROUND
P3 - Assumed NGL 25650
under roof ridge line FIN3
P2 - Assumed NGL 23700
RL 19.50 under roof ridge line NGL
BASEMENT
P1 - Assumed NGL
21500 under roof
ridge line
T
RL 13.75
ENTRY LINK LEVEL
EN
WEST ELEVATION
1
1 : 200
M
H
1
2 -
C
DA3.01
DA2.04
---
1
DA3.03
TA
39520 39520 39620
P4 P5 P5
RF1 RF1 RF1
AT
BAL1
RL 35.10
Level 3
RL 31.90
Level 2
RL 28.70 P5 - Assumed NGL
LEVEL 1 31500 under roof ridge
line
RL 25.50
GROUND LEVEL
SOUTH ELEVATION
2
1 : 200
IMPORTANT NOTES: REVISION DATE DESCRIPTION BY CLIENT DRAWING TITLE
1 04/09/20 FOR INFORMATION ST
Do not scale from drawings. All dimensions to be checked
on site before commencement of work. All discrepancies to 2
3
22/09/20
25/09/20
FOR INFORMATION
DA APPROVAL
ST
ST
NOOSA SPRINGS REAL ESTATE PTY SOUTH & WEST ELEVATION
be brought to the attention of the Architect. Larger scale
drawings and written dimensions take preference. This 4
drawing is copyright and the property of the author, and must 5
09/10/20
14/10/20
DA APPROVAL REVISED
DA APPROVAL REVISED
ST
ST
LTD
not be retained, copied or used without the express authority 6 04/11/20 COUNCIL PRESENTATION ST
Marchese Partners International Pty Ltd
of MARCHESE PARTNERS INTERNATIONAL PTY. LTD. 7 01/12/20 DA APPROVAL REVISED ST Level 14, 46 Edward Street. Brisbane, QLD 4000. Australia
8 12/11/21 RFI ST P +61 7 3211 2600 F +61 7 3211 0297 E [email protected] PROJECT SCALE DATE DRAWN CHECKED
9 04/03/22 DA REVISED DESIGN ST
www.marchesepartners.com 1 : 200 @A1
10 13/04/22 REVISED DESIGN BY
NOOSA SPRINGS BOUTIQUE HOTEL 09/02/23 AB BY
FOR APPROVAL 11
12
21/04/22
09/02/23
UPDATED DA DRAW INGS
UPDATED DA DRAW INGS
BY
LC
Sydney · Brisbane· Melbourne · Adelaide
Kuala Lumpur · Auckland · Christchurch · London · Madrid JOB DRAWING REVISION
ABN 33 590 578 323 0 5 10
NOT FOR CONSTRUCTION 20079 DA2.02 12
Document Set ID: 22048375
22309820
Version: 34,
1, Version
32, VersionDate:
Date:15/02/2023
05/07/2023
24/10/2023
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Further Council Report MCU21-0110.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.