Officer:	Wilhelm Koschade
Direct Telephone:	07 53296215
Our Reference:	REC16/0015
Your Reference:	M2683

16 September 2016

Kenlynn Pty Ltd
C/- JFP Urban Consultants Pty Ltd
PO Box 6
MAROOCHYDORE  QLD  4558

Dear Sir/Madam

Decision Notice
Sustainable Planning Act 2009
I refer to your application and advise that on 15 September 2016, Council decided to issue a Preliminary Approval in accordance with conditions referred to below.
Details of the decision are as follows:
application details
Application No:	REC16/0015
Street Address:	2 David Low Way Castaways Beach  Qld  4567
Real Property Description:	Lot 71 MCH 2854
Planning Scheme:	The Noosa Plan (16 September 2013)
Decision details
The following type of approval has been issued:
Preliminary Approval for a Reconfiguration of a Lot - 1 Lot into 2 Lots and Access easement
Relevant period of approval
The relevant period for this preliminary approval is until 15 September 2018.
assessment manager conditions
PLANNING
Preliminary Approval
Prior the issue of a Development Permit, the following documentation must be submitted to Council for review and approval:
A site specific Bushfire Hazard Assessment prepared by a suitably qualified person which either determines the site as a low bushfire risk or provides recommendations of how bushfire risk can be managed. The hazard assessment must avoid interference with vegetation in proposed covenant areas and must comply with The Noosa Plan’s Natural Hazards Overlay Code.
An Effluent Disposal Report prepared by a suitably qualified person which provides comment on the following:
The capacity of existing systems to operate as intended without causing environmental harm; and
Evidence existing systems operate wholly within the lot they intend to serve and accord with proposed covenant areas.
When Conditions Must Be Complied With
Unless otherwise stated, all works required by the conditions of this permit must be completed prior to submission of the subdivision plan to Council for compliance assessment.
Approved Plans
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table and may be further amended by these conditions.
Plan No.	Rev.	Plan, prepared by	Date
M2683 01	B	Reconfiguration Plan, prepared by JFOP Consultants	14/07/2016
M2683E DR01	A	Engineering Concept – Site Distance & Driveway Plan, prepared by JFOP Consultants	09/06/2016
All lot numbering on the subdivision plan submitted to Council for compliance assessment must remain as shown on the Approved Plans.
The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions.
Land Rehabilitation
The cleared land area of 750m2, south east of the southern residence, on public land must be rehabilitated to restore the area to the local variant of Regional Ecosystem 12.2.14. The works must be undertaken in accordance with an Operational Works approval.
Vegetation Covenant
A vegetation protection covenant must be registered against the titles of the properties over the area Vegetation Covenant on the Plan M2683-01B-RP.dwg pursuant to Section 97A of the Land Title Act 1994. The covenant document and a survey plan must be submitted to Council for endorsement prior to lodgement with the relevant titles authority for registration of title. The covenant document must:
incorporate the requirements of this Decision Notice
include Noosa Council as Covenantee.
reference Queensland Land Title Registry Standard Terms Document No. 715597513
If a provision included in the covenant document is requisitioned or refused registration by the relevant titles authority, a substitute provision must be included in the document which as nearly as practicable addresses the objective sought by the requisitioned or refused provision. The wording of the substitute provision must be agreed by Council.
ENGINEERING
Site Access and Driveways
A sealed access driveway must be provided from David Low Way to all lots. The works must be undertaken in accordance with an Operational Works approval and be generally in accordance with drawing number M2683E DR01 Revision A and must include in particular:
a driveway crossover generally in accordance with Council’s standard drawing
a driveway width of 5.5 metres extending from the edge of the road formation to the property boundary
a passing opportunity (minimum 5.5 metres wide) between the front property boundary and the access to Lot 2
a sealed driveway minimum 3.0 metres wide for the remainder of the access handle,
underground service conduits for all utility services.
the works (benching and clearing) required within the David Low Way road reserve to construct a complying access
Vehicle access to Lots 1 & 2 is limited to the constructed driveway only.  A clause must be included in the contract of sale for Lots 1 & 2 which requires vehicle access to be from the constructed driveway only, and which prohibits the driveway from being relocated without Council agreement.
Stormwater Drainage
Stormwater runoff from the development must be disposed of on-site without causing scour or damage to the subject site or any adjoining property.
Electricity and Telecommunication Services
Reticulated electricity and telecommunication services must be provided to each lot in accordance with an approval for Operational Works and the standards and requirements of the relevant service provider.
Unless otherwise stipulated by telecommunications legislation at the time of construction, the development must be provided with all necessary conduits, pits and pipes to accommodate the future connection of optic fibre technology telecommunications.
Certification must be submitted to Council from all relevant service providers which certifies that the development has met the requirements of this Decision Notice and all applicable legislation at the time of construction.
Water Connections
An underground connection to reticulated water must be provided to each lot in accordance with the standards and requirements of Northern SEQ Distributor–Retailer Authority (Unitywater).
A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater) must be submitted to Council that certifies an underground connection to reticulated water has been provided to each lot.
Easements
An easement for access and services must be registered in favour of Lot 2 against the title of Lot 1. The easement must extend for the full extent of the easement shown on the approved plan.
Unless otherwise agreed in writing by the relevant service provider, any public or third party infrastructure located on the subject site must be placed within an easement registered against the title of the property.
All easements must be designed in accordance with the planning scheme and granted at no cost to the Grantee. Where the Grantee is Council or a service authority, the easement documentation must be in accordance with the Grantee’s standard easement terms. Draft easement documentation must be submitted to Council for endorsement.
All works must be kept clear of any existing or proposed easements on the subject land, unless agreed otherwise in writing by the Grantee.
Dedication
The applicant must dedicate as “Road” that part of the site along the David Low Way frontage that is occupied by Council’s existing footpath. The alignment of the new boundary must be a minimum of 500mm from the eastern side of the existing footpath with as few bends as practicable.
Damage to Services and Assets
Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times:
where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or
where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval.
referral agencies
The referral agencies applicable to this application are:
Referral Status	Referral Agency and Address	Referral Trigger	Response

Concurrence	SARA at DSDIP Mike Ahern Government Building 12 First Avenue MAROOCHYDORE  QLD  4558 Email:[email protected]	Reconfiguring a Lot within a Coastal Management District	The agency provided its response on 27 July 2016. A copy of the response is attached.

Advisory notes
The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions:
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations under the ACH Act.
Infrastructure Charges
This Development Permit will trigger an “Infrastructure Charge Notice” to be issued in accordance with Council’s “Charges Resolution” made pursuant to the Sustainable Planning Act 2009 and in conjunction with the State Planning Regulatory Provision (Adopted Charges).
property notes
Not Applicable
preliminary approval overriding planning scheme
Not Applicable
further development permits required
Development Permit to Reconfigure a Lot - 1 Lot into 2 Lots and Access easement
Development Permit for Operational Works (Access)
self assessable codes
Not Applicable
submissions
Not Applicable
reasons/grounds for approval
Not Applicable

RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice” may be given. Taking this step will defer your appeal period, which will commence again from the start the day after you receive a “negotiated decision notice”. (Refer to Part 8 “Dealing with decision notices and approvals” - Division 1 “Changing decision notices and approvals during applicant’s appeal period” of the Sustainable Planning Act 2009.)
OTHER DETAILS
If you wish to obtain more information about Council’s decision, electronic copies are available on line at www.noosa.qld.gov.au, or at Council Offices.
Yours faithfully

Kerri Coyle
Manager Planning & Environment

cc	Unitywater

Mike Ahern Government Building
12 First Avenue
MAROOCHYDORE  QLD  4558
Online: Mydas (at www.dsdip.qld.gov.au)
Email:[email protected]

Enc:	Referral Agency Response
Approved Plans/Documents
Appeal Rights

	Appeal Rights SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009

The following is an extract from the Sustainable Planning Act 2009  (Chapter 7).
MATERIAL CHANGE OF USE, RECONFIGURING A LOT & OPERATIONAL WORKS

Division 8 	Appeals to court relating to development applications and approvals

461 	Appeals by applicants
(1) 	An applicant for a development application may appeal to the court against any of the following—
(a) 	the refusal, or the refusal in part, of the development application;
(b) 	any condition of a development approval, another matter stated in a development approval and the identification or inclusion of a code under section 242;
(c) 	the decision to give a preliminary approval when a development permit was applied for;
(d) 	the length of a period mentioned in section 341;
(e) 	a deemed refusal of the development application.
(2) 	An appeal under subsection (1)(a), (b), (c) or (d) must be started within 20 business days (the applicant’s appeal period) after—
(a) 	if a decision notice or negotiated decision notice is given—the day the decision notice or negotiated decision notice is given to the applicant; or
(b) 	otherwise—the day a decision notice was required to be given to the applicant.
(3) 	An appeal under subsection (1)(e) may be started at any time after the last day a decision on the matter should have been made.

462 	Appeals by submitters—general
(1) 	A submitter for a development application may appeal to the court only against—
(a) 	the part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or
(b) 	the part of the approval relating to the assessment manager’s decision under section 327.
(2) 	To the extent an appeal may be made under subsection (1), the appeal may be against 1 or more of the following—
(a) 	the giving of a development approval;
(b) 	any provision of the approval including—
(i) 	a condition of, or lack of condition for, the approval; or
(ii) 	the length of a period mentioned in section 341 for the approval.
(3) 	However, a submitter may not appeal if the submitter—
(a) 	withdraws the submission before the application is decided; or
(b) 	has given the assessment manager a notice under section 339(1)(b)(ii).
(4) 	The appeal must be started within 20 business days (the submitter’s appeal period) after the decision notice or negotiated decision notice is given to the submitter.

463 	Additional and extended appeal rights for submitters for particular development applications
(1) 	This section applies to a development application to which chapter 9, part 7 applies.
(2) 	A submitter of a properly made submission for the application may appeal to the court about a referral agency’s response made by a prescribed concurrence agency for the application.
(3) 	However, the submitter may only appeal against a referral agency’s response to the extent it relates to—
(a) 	if the prescribed concurrence agency is the chief executive (environment)—development for an aquacultural ERA; or
(b) 	if the prescribed concurrence agency is the chief executive (fisheries)—development that is—
(i) 	a material change of use of premises for aquaculture; or
(ii) 	operational work that is the removal, damage or destruction of a marine plant.
(4) 	Despite section 462(1), the submitter may appeal against the following matters for the application even if the matters relate to code assessment—
(a) 	a decision about a matter mentioned in section 462(2) if it is a decision of the chief executive (fisheries);
(b) 	a referral agency’s response mentioned in subsection (2).

464 	Appeals by advice agency submitters
(1) 	Subsection (2) applies if an advice agency, in its response for an application, told the assessment manager to treat the response as a properly made submission.
(2) 	The advice agency may, within the limits of its jurisdiction, appeal to the court about—
(a) 	any part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or
(b) 	any part of the approval relating to the assessment manager’s decision under section 327.
(3) 	The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is given to the advice agency as a submitter.
(4) 	However, if the advice agency has given the assessment manager a notice under section 339(1)(b)(ii), the advice agency may not appeal the decision.

465 	Appeals about decisions relating to extensions for approvals
(1) 	For a development approval given for a development application, a person to whom a notice is given under section 389, other than a notice for a decision under section 386(2), may appeal to the court against the decision in the notice.
(2) 	The appeal must be started within 20 business days after the day the notice of the decision is given to the person.
(3) 	Also, a person who has made a request under section 383 may appeal to the court against a deemed refusal of the request.
(4)	An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made.

466 	Appeals about decisions relating to permissible changes
(1) 	For a development approval given for a development application, the following persons may appeal to the court against a decision on a request to make a permissible change to the approval—
(a) 	if the responsible entity for making the change is the assessment manager for the application—
(i) 	the person who made the request; or
(ii) 	an entity that gave a notice under section 373 or a pre-request response notice about the request;
(b) 	if the responsible entity for making the change is a concurrence agency for the application—the person who made the request.
(2) 	The appeal must be started within 20 business days after the day the person is given notice of the decision on the request under section 376.
(3) 	Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request.
(4)	An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made.

467 	Appeals about changing or cancelling conditions imposed by assessment manager or concurrence agency
(1) 	A person to whom a notice under section 378(9)(b) giving a decision to change or cancel a condition of a development approval has been given may appeal to the court against the decision in the notice.
(2) 	The appeal must be started within 20 business days after the day the notice of the decision is given to the person.

[word/footer1.xml]
Page 2 of 15

[word/footer2.xml]
PO Box 141		P. (07) 5329 6500	[email protected]	
	TEWANTIN  QLD  4565	F. (07) 5329 6501	www.noosa.qld.gov.au
				Page 1 of 15

[word/header1.xml]
REC16/0015

[Attachment: image10.png (image text)]
 
 
 

 
 
 

a
mm

  

NOOSA
COUNCIL


[Attachment: image3.png (image text)]
 

Queenstand
Government

Department of Infastuctue

Loeal Government and Planning
Ourreference:  S0A0616-091608

Yourreference: RECI80018
27 July 2016

‘The Chief Executive Officer
Noosa Council

PO Box 141

Tewantin Qld 4565,
mail@noosa qld gov.au

Attn: Mr Denis Wallace

Dear Mr Wallace

‘Concurrence agency response—with conditions
2 David Low Way, Castaways Beach Qld 4567
(Given under seotion 288 ofthe Sustainable Planning Act 2008)

‘The referral agency material for the development application described below was received by
the Department of Infrastructure, Local Govemment and Planning under section 272 of the
‘Sustainable Planning Act 2009 on 30 June 2016.

Applicant details

 

Applicant name: Kenlynn Pty Ltd
CE JFP Urban Consuitants Pty Ltd
Applicant contact details: Leanne Simpson

 

PO Box 6
MAROOCHYDORE QLD 4558
[email protected]

Site details

Street address: 2 David Low Way, Castaways Beach Qld 4567

Lot on plan: Lot 71 on MCH2854

Local government area: Noosa Council

Paget

‘SE West Region
Level 117 Brstane Steet,
PO Box 120

Ipswich CLD 4205


[Attachment: image4.png (image text)]
Application details

 

Proposed development. Development Permit for Reconfiguring a Lot (1 Lot into 2
Lots and Access Easement)

Aspects of development and type of approval being sought

 

 

 

 

 

 

 

 

Nature of ‘Approval Brief Proposal of Level of
Development Type Description Assessment
Reconfiguring a | Development | Subdivision (1 Lot into 2 Lots) | Code Assessment
Lot emit and Access Easement
Referral triggers

 

‘The development application was referred to the department under the following

provisions of the Sustainable Planning Regulation 2009:

Referral trigger Schedule 7, Table 2, Item 14—Tidal works, or development in a
coastal management district

Conditions
Under section 287(1)(a) of the Sustainable Planning Act 2009, the conditions set out in
Attachment 1 must be attached to any development approval

Reasons for decision to impose conditions
Under section 289( 1) of the Sustainable Planning Act 2009, the department must set out the
reasons for the decision to impose conditions. These reasons are set out in Attachment 2.

 

‘The department requires that the following plans and specifications set out below and in
Attachment 3 must be attached to any development approval

 

 

 

 

DrawingiReport Title | Prepared by Date Reference | Versionilssue
no.
‘Aspect of development: Reconfiguring a Lot
Reconfiguration Plan FOP Urban 3OMay 2016 | M26ES.OTA- | A
Consultants RE

 

 

 

 

 

 

‘A copy of this response has been sent to the applicant for their information,

For further information, please contact Jane McInnes, Senior Planning Officer, SARA SEQ West
Ipswich on 3432 2423, or email ipswichSARA@dilgp qld gov au who will be pleased to assist.

Yours sincerely

AU wat

Ursula O'Donnell
Manager — Plani

 

 

Deparment of rfastuchie, Local Goverment and Planing Page2


[Attachment: image5.png (image text)]
lenc: Attachment !—Consitions to be imposed
“Attachment 2—Raasons for decision fo impose conditions:
‘Attachment 3 Approved Plans and Specifications

ce: —Kenlynn Pty id Cle JFP Urban Consultants Pty Lt, [email protected] au
Deparment of Environment and Hertage Protection, sara@ehp qld gov au

Deparment of rfastuchie, Local Goverment and Planing Pageo


[Attachment: image6.png (image text)]
Ourreference:  S0A0616-091608
Yourreference: REC1A/0015,

Attachment 1—Conditions to be imposed

 

No. | Conditions Condition timing

 

Reconfiguring a lot

 

‘Schedule 7, Table 2, Item 14—Pursuant to section 255D of the Sustainable Planning Act 2009, the
chief executive administering the Act nominates the Director-General of Department of
Environment and Heritage Protection to be the assessing authority for the development to which
this development approval relates for the administration and enforcement of any matter relating to
the following condition(s)

 

 

1 ‘The development must be carried out generally in accordance —_| Atal mes.
with the following plans:
‘+ Reconfiguration Plan, prepared by JFOP Urban
Consultants, dated 30 May 2016, M2683.01A.RP,
Revision A.

 

 

 

Deparment of rfastuchie, Local Goverment and Planing Page

 


[Attachment: image7.png (image text)]
Ourreference:  S0A0616-091608
Yourreference: REC1A/0015,

 

Attachment 2—Reasons for decision to impose conditions

 

‘The reasons for this decision are:

‘+ Toensure the development is carried out generally in accordance with the plans of
development submitted with the application.

Deparment of rfastuchie, Local Goverment and Planing Pages


[Attachment: image8.png (image text)]
Ourreference:  S0A0616-091608
Yourreference: REC1A/0015,

Attachment 3—Approved plans and specifications

 

Deparment of rfastuchie, Local Goverment and Planing Page


[Attachment: image9.png (image text)]
 

 

 

  
 
  
 

‘enw te

SEERA seprova,
Aepoiine: SOA OI6ON186

 
 

 

[sinter

 

 

SOTAL AREA S67? (Oe) in ponnntegetlatteete

RECONFIGURATION PLAN
KENLYNN PTY LTD
szs =| 2 DAVID LOW WAY, CASTAWAYS BEACH

 
     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
Log in to download the original file

SUPERSEDED - APPROVED Decision Notice REC16_0015.docx · 994 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.