Council archive · source document
MCU14/0073 - Decision Notice - 1036841
SDA-0914-014464
Equitable Access and Facilities
2. The plans for the proposed building work have NOT been assessed for compliance
with the requirements of the National Construction Code - Building Code of
Australia (Volume 1) as they relate to people with disabilities. Your attention is
also directed to the fact that in addition to the requirements of the National
Construction Code as they relate to people with disabilities, one or more of the
following may impact on the proposed building work:
d. the Disability Discrimination Act 1992 (Commonwealth);
e. the Anti-Discrimination Act 1991 (Queensland); and
f. the Disability (Access to Premises – Buildings) Standards.
Development Compliance Inspection
3. Prior to the commencement of the use, please contact Council's Development
Audit & Response Unit to arrange a Development Compliance Inspection.
Building and Construction Industry (Portable Long Service Leave) Levy
4. The QLeave levy must be paid prior to the issue of a development permit where it
is required. Council will not be able to issue a Decision Notice without receipt of
details that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or
(07) 3212 6855.
Co-ordination of Operational Works Assessment
5. Additional application fees apply to Operational Work applications where the
different aspects of the works are lodged separately. Significant savings in
application fees will result if all works are lodged in a single application.
Preparation of a Preliminary Construction Management Plan
6. The works identified in this Decision Notice will be required to be carried out in
accordance with a Construction Management Plan endorsed by Council through
an approval for Operational Works. To ensure expedient assessment of any
Operational Works application, the applicant is advised to submit a preliminary
Construction Management Plan that addresses the requirements of the planning
scheme. In particular, the preliminary Construction Management Plan should
address the following:
g. provisions that ensure the proposed construction does not unduly impact on
the surrounding area and ensure the site is safe for members of the public,
implementing appropriate traffic signage in accordance with the Manual of
Uniform Traffic Control Devices (MUTCD) and making provision for safe
pedestrian access across the frontage of the site both during daily
construction and after daily construction has ceased.
Plumbing, Drainage, Waste Water Treatment and Disposal System
7. The establishment of Plumbing and Drainage and a waste water treatment and
disposal system for the site requires a Compliance Permit to be obtained from
Council under the Plumbing and Drainage Act 2002. The system must be designed
in accordance with the Queensland Plumbing and Wastewater Code, Australian
Standards AS/NZS3500, AS/NZS1547: 2000 “On-site Domestic Wastewater
Management”.
Department of State Development, Infrastructure and Planning Page 8
Document Set ID: 19845988
Version: 1, Version Date: 22/12/2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU14/0073 - Decision Notice - 1036841Related documentApplication case desk ↗
About this file
- File size
- 297 KB (small file)
- File type
No other editions are linked here.