A blockage factor of 20% has been applied as per the ARR blockage assessment completed
in Appendix E.
Table 4-2: Model Culvert Information
ID Size Length USIL (m AHD) DSIL (m AHD)
1 1 x 1800 x 900mm RCBC 7.00 14.66 14.56
2 1 x 900mm RCP 11.15 14.08 14.01
3 1 x 300mm RCP 11.17 14.04 13.95
4 1 x 300mm RCP 10.74 13.63 13.60
5 1 x 450mm RCP 10.78 13.13 13.06
6 1 x 375mm RCP 15.00 12.89 12.78
7 4 x 750mm RCP 15.00 12.53 12.49
8 1 x 300 x 450mm RCBC 11.83 12.77 12.74
9 1 x 380mm RCP 13.32 13.40 13.30
10 1 x 380mm RCP 11.55 14.60 14.50
11 10 x 750mm RCP 11.2 13.95 13.80
12 3 x 1200 x 900mm RCBC 11.2 11.94 11.83
13 1 x 1500mm RCP 9.79 11.30 11.10
14 5 x 900mm RCP 11.2 15.68 15.62
15 1 x 380mm RCP 10.99 15.95 15.8
16 10 x 750mm RCP 11.2 14.05 13.95
17 5 x 2400 x 1500 9.24 6.50 6.40
18 1 x 450mm RCP 6.2 8.72 8.68
Internal 9 x 1200mm x 600mm RCBC 10.00 11.80 11.75
Driveway 1 x 300mm RCP 5 12.94 12.92
Model Scenarios
The Existing (E01) and Proposed (P01) scenarios are described below and depicted in
Appendix D.
4.2.1. Existing Scenario (E02)
In representing the Existing Scenario, the model was setup to represent the overland flow
characteristics that existed prior to the site being developed. A combination of LiDAR and
detailed survey was used to represent the existing model terrain. The model was run for the
63.2%, 39%, 10% and 1% AEP for durations ranging from 30min to 12hrs.
3.2.3 Proposed Scenario (P03)
The Proposed Scenario has utilised the Existing Scenario model to represent the proposed
development. The following changes were made:
• Represent internal road at RL12.7m AHD (2d_zsh).
• Represent new 9 x 1200 x 600mm RCBC under internal road (1d_nwk).
• Represent filling of building envelopes of Lot 1 and 4 to achieve flood immunity
(2d_zsh).
• Represent minor regrading beside building envelope of Lot 1 (2d_zsh).
• Adjustments to roughness to account for new road (2d_mat).
The model was run for the 63.2%, 39%, 10% and 1% AEP for durations ranging from 60min to
24hrs.
21-0288-FS001-V3 | Flood Investigation | 60 Glenridge Drive, Cooroibah | 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.