Original PDF page 22, section 1. The text section number identifies this passage in the reader.
5. CONCLUSION
PEAKURBAN have completed a Flood Investigation to support the Reconfiguration of Lot
application for the development at 60 Glenridge Drive, Cooroibah. The objective of this
investigation was to design an appropriate road crossing to service the development,
demonstrate that no impacts and no loss of flood plain storage will result from the proposed
development (and associated earthworks).
This investigation demonstrates that a suitable development strategy has be developed
without creating any impacts to any adjoining property owners. Afflux maps for the 63.2, 39%,
10%, 1% and 1% (2100) AEP flood events and PMF provided in Appendix H demonstrate this.
The investigation has found that there is a reduction in peak flows and increase in flood storage
provided. As such, any further formal on-site detention is not recommended as development
has been designed to achieve the outcome of non-worsening.
The proposed development lot building envelopes are located above the 1% (2100) AEP, and
it is recommended that finished floor levels of future dwellings achieve a minimum 0.3m
freeboard above the DFE or the PMF level as detailed in Table 4-5.
This flood investigation plan successfully demonstrates that:
• The site is developed to create building envelopes that are flood free and enable
future finished floor levels to be a maximum of 0.3m above the DFE or the PMF
event.
• There is no impact to flood levels to adjoining properties as a result of this
development.
• Non-worsening of peak flows downstream of the development is achieved.
• Internal Road has been designed to achieve flood immunity in the 10% AEP event
and trafficable in the 1% AEP event.
• There is no loss in flood plain storage, with the proposed earthworks actually
increasing the available storage.
• Severe storm assessment found that future dwellings with freeboard would remain
free in the 1% (2100) AEP scenario with all culverts 100% blocked.
21-0288-FS001-V3 | Flood Investigation | 60 Glenridge Drive, Cooroibah | 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.