Skip to the record
Accept no substitutions.

Council archive · source document

07/1940 - Op Works - Landscaping, Roadworks, Drainage, Stormwater & Earthworks [As Published] · 142007.1940

of 22

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkiist, Version 21.0, 3 September 2007
IPA schedule 8 part? table 5. tem 1
'P Reguiaton schedule 2. table 2 item 1*
IP Regulation scheduse 1. table 5 item 2 (wid river area)
Water Act 2000 section 966C
W.td Rivers Act 2005 section 43A

‘ENVIRONMENTALLY RELEVANT ACTIVITY; WALD RIVER AREA

1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?

0) No
C] Yes

IPA. schedule & part? table 2 tem?

IPA, scheduit & part table 5 tems 3 ana 4

IP Regulator schedue 2. table 2 tems 1 ena Ze

Environmental Protection Act 1994. secron 73AA (wid nver area)
Wild Rivers Act 2005 section 434

WITHIN THE LIMITS OF A PORT

14 ls any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
( No
C1 Yes
IP Regulation schedule 2. table 2. tems 15 and 16

DECLARED FISH HABITAT AREA

15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
(1 No

{([]_ Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under [PA,
schedule 8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not
the Assessment Manager for the application, the agency has jurisdiction as Advice Agency.

IP Reguiation, scheduie 2 table 2, tem 26
COMMUNITY INFRASTRUCTURE
1.6 Is any part of the premises designated for community infrastructure?

[) No
(1 Yes

IP Regulation, schedtite 2 table 3. item 7
WASTE WATER MANAGEMENT
17 Does the proposal involve the establishment or expansion of a waste water disposal system?

() No
C] Yes

IP Regulation, schedule 2, table 3. tem 5

 

Pal, "Section 4 must be completed when the application seeks approval to carry out operational work.
PLANNING SCHEME : Oo

41 \s any of the proposed operational work assessable under a planning scheme?
[J No - Go to Question 4.2 below
Yes - Complete Part E of IDAS Application Form 1 and Questions 4.1.1 - 4.1.8 below

 

 

 

STATE-CONTROLLED ROAD

4.1.4 Is any part of the premises within 100m of a State-controlled road, or part of a future State-controlled road?
] No
(1 Yes

IP Reguiation, scheduie 2. table 3, tem 3
IP Regulation. schedule 2, table 3, itern 1(b)

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1940 - Op Works - Landscaping, Roadworks, Drainage, Stormwater & Earthworks [As Published].pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.