Council archive · source document
07/1940 - Op Works - Landscaping, Roadworks, Drainage, Stormwater & Earthworks [As Published] · 142007.1940
INTEGRATED PLANNING ACT 1897
Foam 4 HeveloomentApplication
Part E
Neture of the works
Part E, Version 3.0, 3 September 2007
idag)
Building &/or operational works assessable against a planning scheme
1. 1s the application seeking approval of building work assessable against the local government planning scheme?
[>] No
(J Yes
2. Is the application seeking approval of operational work assessable against a planning scheme?
C1) No
Yes
2(a) _ Is the application seeking approval for more that one type of operational work?
([]_ No- Complete Table B
Yes - Complete a new Table B for each type of operational work
Table B
(i) Whats the nature of the operational work?
Roadworks (] Stormwater (L] Water infrastructure
[J Landscaping (5) Clearing vegetation under the planning scheme
(LJ Drainage Works = [_] Other - Specify below
(C1) Sewerage infrastructure
(-) Earthworks
(ii) Is the application for operational work involving the creation of new lots?
No
( Yes - Specify number below
(ii) What type of approval is being sought?
[] Preliminary approval
Development Permit
(iv) Is there a current Preliminary Approval for this operational work on the premises?
No
{[] Yes - Complete Table B(a)
(v) Ave the works subsequent to a previous Development Permit or Preliminary Approval for another aspect of development?
No
[J Yes - Complete Table B(b)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1940 - Op Works - Landscaping, Roadworks, Drainage, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.