SARA reference: SDA-0117-036529 Council reference: OPW17/0016 Applicant reference: OP0028449 15 March 2017 The Chief Executive Officer Noosa Shire Council PO Box 141 TEWANTIN QLD 4565 [email protected] Dear Sir Concurrence agency response—with conditions Tidal waters adjacent to Noosa Woods Park & Public Toilets Claude Batten Drive, Noosa Heads (Given under section 285 of the Sustainable Planning Act 2009) The referral agency material for the development application described below was received by the Department of Infrastructure, Local Government and Planning under section 272 of the Sustainable Planning Act 2009 on 27 January 2017. Applicant details Applicant name: Noosa Shire Council Applicant contact details: PO Box 141 TEWANTIN QLD 4565 [email protected] Site details Street address: Tidal waters adjacent to Noosa Woods Park & Public Toilets, Claude Batten Drive, Noosa Heads Lot on plan: 114 MCH839107 (adjacent lot) Total site area: 180m2 (15 disparate sites x 12m2) Local government area: Noosa Shire Council Application details Page 1 SEQ North Region Level 8, Mike Ahern Building 12 First Avenue PO Box 1129 Maroochydore QLD 4558
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 32 pages
Page 2
SDA-0117-036529
Proposed development: Development Permit for Operational Works (Prescribed
Tidal Works – 15 Artificial Oyster Reefs)
Aspects of development and type of approval being sought
Nature of Approval Brief Proposal of Level of
Development Type Description Assessment
Operational Work Development Installation of coir log bags Code Assessment
permit filled with oyster shells to
facilitate natural oyster
recruitment at 15 disparate
sites throughout the Noosa
River.
Referral triggers
The development application was referred to the department under the following
provisions of the Sustainable Planning Regulation 2009:
Referral trigger Schedule 7, Table 2, Item 13 – Tidal works (Coastal protection)
Schedule 7, Table 2, Item 15 – Tidal works (Maritime safety)
Schedule 7, Table 2, Item 26 – Fish Habitat Areas
Conditions
Under section 287(1)(a) of the Sustainable Planning Act 2009, the conditions set out in
Attachment 1 must be attached to any development approval.
Reasons for decision to impose conditions
Under section 289(1) of the Sustainable Planning Act 2009, the department must set out the
reasons for the decision to impose conditions. These reasons are set out in Attachment 2.
Approved plans and specifications
The department requires that the following plans and specifications set out below and in
Attachment 3 must be attached to any development approval.
Drawing/Report Prepared by Date Reference Version/Issue
Title no.
Aspect of development: Operational works
Site Location International Coastal 20 Oct, 2016 2016.0028- A
Management 001
Plan Layout Site 1–12 International Coastal 20 Oct, 2016 2016.0028- A
Management 002
Plan Layout Site 13–16 International Coastal 20 Oct, 2016 2016.0028- A
Management 003
Site 1 International Coastal 20 Oct, 2016 2016.0028- A
Management 004
Site 2 International Coastal 20 Oct, 2016 2016.0028- A
Management 005
Site 3 International Coastal 20 Oct, 2016 2016.0028- A
Management 006
Site 4 International Coastal 20 Oct, 2016 2016.0028- A
Department of Infrastructure, Local Government and Planning Page 2
Page 3
SDA-0117-036529
Management 007
Site 5 International Coastal 20 Oct, 2016 2016.0028- A
Management 008
Site 6 International Coastal 20 Oct, 2016 2016.0028- A
Management 009
Site 7 International Coastal 20 Oct, 2016 2016.0028- A
Management 010
Site 8 International Coastal 20 Oct, 2016 2016.0028- A
Management 011
Site 9 International Coastal 20 Oct, 2016 2016.0028- A
Management 012
Site 10 International Coastal 20 Oct, 2016 2016.0028- A
Management 013
Site 11 International Coastal 20 Oct, 2016 2016.0028- A
Management 014
Site 12 International Coastal 20 Oct, 2016 2016.0028- A
Management 015
Site 13 International Coastal 20 Oct, 2016 2016.0028- B
Management 016
Site 14 International Coastal 20 Oct, 2016 2016.0028- A
Management 017
Site 16 International Coastal 20 Oct, 2016 2016.0028- A
Management 019
Detail International Coastal 20 Oct, 2016 2016.0028- A
Management 020
Further advice
The department offers the following advice to the applicant about the development
application:
- Proximity to buoy moorings: Installation of the restoration unit at Site 5 must ensure
that the unit is located at least 30m away from adjacent permanent buoy moorings.
- Maintenance of aids to navigation:
(a) Noosa Shire Council will be responsible for the installation and maintenance of
aids to navigation associated with the development.
(b) MSQ must approve the intended aids to navigation prior to installation.
(c) MSQ can conduct the works on a cost recovery basis. Please contact MSQ for
further information.
- Resource Allocation Authority: The applicant is advised that the works subject to
this approval require a valid Resource Allocation Authority before works can
commence and while the trial is in progress. Resource Allocation Authorities
(provision of ‘resource entitlement’) are issued under the Fisheries Act 1994.
A copy of this response has been sent to the applicant for their information.
For further information, please contact Tom Kasauskas, Senior Planning Officer, SARA SEQ North
on 5352 9717, or email [email protected] who will be pleased to assist.
Department of Infrastructure, Local Government and Planning Page 3
Page 4
SDA-0117-036529
Yours sincerely
Nathan Rule
Director, Southern Region
cc: Noosa Shire Council, [email protected]
enc: Attachment 1—Conditions to be imposed
Attachment 2—Reasons for decision to impose conditions
Attachment 3—Approved plans and specifications
Department of Infrastructure, Local Government and Planning Page 4
Page 5
SDA-0117-036529
SARA reference: SDA-0117-036529
Ass manager reference: OPW17/0016
Applicant reference: OP0028449
Attachment 1—Conditions to be imposed
No. Conditions Condition timing
Development Permit for Operational Works
7.2.13—Pursuant to section 255D of the Sustainable Planning Act 2009, the chief executive
administering the Act nominates the Director-General of the Department of Environment and
Heritage Protection to be the assessing authority for the development to which this development
approval relates for the administration and enforcement of any matter relating to the following
condition(s):
1. The development must be carried out generally in accordance For the duration of
with the following plans: works.
Site Location, prepared by International Coastal
Management, dated 20 Oct 2016, reference 2016.0028-
001, revision A;
Plan Layout Site 1-12, prepared by International Coastal
Management, dated 20 Oct 2016, reference 2016.0028-
002, revision A;
Plan Layout Site 13-16, prepared by International Coastal
Management, dated 20 Oct 2016, reference 2016.0028-
003, revision A;
Site 1, prepared by International Coastal Management,
dated 20 Oct 2016, reference 2016.0028-004, revision A;
Site 2, prepared by International Coastal Management,
dated 20 Oct 2016, reference 2016.0028-005, revision A;
Site 3, prepared by International Coastal Management,
dated 20 Oct 2016, reference 2016.0028-006, revision A;
Site 4, prepared by International Coastal Management,
dated 20 Oct 2016, reference 2016.0028-007, revision A;
Site 5, prepared by International Coastal Management,
dated 20 Oct 2016, reference 2016.0028-008, revision A;
Site 6, prepared by International Coastal Management,
dated 20 Oct 2016, reference 2016.0028-009, revision A;
Site 7, prepared by International Coastal Management,
dated 20 Oct 2016, reference 2016.0028-010, revision A;
Site 8, prepared by International Coastal Management,
dated 20 Oct 2016, reference 2016.0028-011, revision A;
Site 9, prepared by International Coastal Management,
dated 20 Oct 2016, reference 2016.0028-012, revision A;
Site 10, prepared by International Coastal Management,
dated 20 Oct 2016, reference 2016.0028-013, revision A;
Site 11, prepared by International Coastal Management,
dated 20 Oct 2016, reference 2016.0028-014, revision A;
Department of Infrastructure, Local Government and Planning Page 5
Page 6
SDA-0117-036529
No. Conditions Condition timing
Site 12, prepared by International Coastal Management,
dated 20 Oct 2016, reference 2016.0028-015, revision A;
Site 13, prepared by International Coastal Management,
dated 20 Oct 2016, reference 2016.0028-016, revision B;
Site 14, prepared by International Coastal Management,
dated 20 Oct 2016, reference 2016.0028-017, revision A;
Site 16, prepared by International Coastal Management,
dated 20 Oct 2016, reference 2016.0028-019, revision A;
Detail, prepared by International Coastal Management,
dated 20 Oct 2016, reference 2016.0028-020, revision A;
2. For the proposed works only use materials which are free from For the duration of
contaminants as defined under section 11 of the Environmental the works the subject
Protection Act 1994. of this approval
3. (a) The works are to be attached to the land the subject of this At all times
approval.
(b) Should the works become detached the Noosa Shire
Council shall be responsible for the collection and removal
of all debris at their own expense.
4. Where a particular oyster reef restoration unit does not meet the Prior to four (4) years
performance objectives listed in Attachment 2 of the Resource post deployment
Allocation Authority Number 2016CA0575, and is not a viable and
self-sustaining oyster reef fish habitat at the completion of the 3
year trial period, the particular oyster reef restoration unit must be
removed and disposed of appropriately.
5. All works are to be constructed and maintained in a safe At all times
condition, generally in accordance with the drawing titled Detail,
prepared by International Coastal Management, dated 20 Oct
2016, reference 2016.0028-020, revision A.
6. Should the works become damaged as a result of erosion, At all times
flooding or storm tide inundation, the Noosa Shire Council shall be
responsible for the removal of all debris at their own expense.
7.2.15—Pursuant to section 255D of the Sustainable Planning Act 2009, the chief executive
administering the Act nominates the Director-General of the Department of Transport and Main
Roads to be the assessing authority for the development to which this development approval
relates for the administration and enforcement of any matter relating to the following condition(s):
7. (a) “As Constructed” drawings of the approved structure/s Within two (2) weeks
must be provided to: of the completion of
the works.
Regional Harbour Master (Brisbane)
Maritime Operations Base
MacArthur Avenue East
Pinkenba QLD 4008
(b) “As Constructed” drawings must include a Class C
Department of Infrastructure, Local Government and Planning Page 6
Page 7
SDA-0117-036529
No. Conditions Condition timing
hydrographic survey for each restoration unit site to enable
publically available maritime geospatial information to be
updated.
8. (a) Provide written notice to the Regional Harbour Master (a) At least two (2)
(Brisbane) (address below) when the development weeks prior to
authorised under this approval is scheduled to commence. the
commencement
Each notice must state this application number, the location of works.
and name of registered place and the condition number
under which the notice is being given.
(b) Provide written notice to the Regional Harbour Master (b) Within two (2)
(Brisbane) (address below) when the development weeks of the
authorised under this approval has been completed. completion of
works.
Each notice must state this application number, the location
and name of registered place and the condition number
under which the notice is being given.
Address:
Regional Harbour Master (Brisbane)
Maritime Operations Base
MacArthur Avenue East
Pinkenba QLD 4008
9. Structures must be lit/marked in accordance with the following At all times.
specifications, such that they do not cause a risk to the safe
navigation of other ships:
Site 1 – No navigational aid requirements
Site 2 – No navigational aid requirements
Site 3 – No navigational aid requirements
Site 4 – No navigational aid requirements
Site 5 – No navigational aid requirements
Site 6 – Signage required indicating underwater
obstruction
Site 7 - Signage required indicating underwater
obstruction
Site 8 - No navigational aid requirements
Site 9 - No navigational aid requirements
Site 10 - No navigational aid requirements
Site 11 - No navigational aid requirements
Site 12 - No navigational aid requirements
Site 13 - Signage required indicating underwater
obstruction
Site 14 - Signage required indicating underwater
obstruction
Site 16 – No navigational aid requirements
Any lighting provided must not obscure, disguise or otherwise
interfere with the effectiveness of navigational lighting.
Department of Infrastructure, Local Government and Planning Page 7
Page 8
SDA-0117-036529
No. Conditions Condition timing
7.2.26—Pursuant to section 255D of the Sustainable Planning Act 2009, the chief executive
administering the Act nominates the Director-General of the Department of Agriculture and
Fisheries to be the assessing authority for the development to which this development approval
relates for the administration and enforcement of any matter relating to the following condition(s):
10. The development must be in accordance with the Noosa River For the duration of
Oyster Reef Restoration Plan, prepared by Dr Ben Gilby, Dr the works.
Andrew Olds, Dr Thomas Schlacher, Dr Simon Walker and Dr
Michael Gloster, dated 11 January 2017, in particular;
Oyster reef restoration units that do not meet the
performance objectives listed in section 12 Monitoring
schedule, within 3 years post deployment, will be removed
as soon as practical and prior to 4 years post deployment.
11. Development authorised under this approval is limited as follows: At all times
the operational works within the Noosa River declared Fish
Habitat Area Management A area being limited to a total of
180m2 (12m2 within each of the 15 sites) for the placement
of oyster reef restoration units and shown in the following
plans:
o Plan Layout Site 1-12, prepared by International
Coastal Management, dated 20 Oct 2016, reference
2016.0028-002, revision A;
o Plan Layout Site 13-16, prepared by International
Coastal Management, dated 20 Oct 2016, reference
2016.0028-003, revision A;
o Site 1, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-004, revision A;
o Site 2, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-005, revision A;
o Site 3, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-006, revision A;
o Site 4, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-007, revision A;
o Site 5, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-008, revision A;
o Site 6, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-009, revision A;
o Site 7, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-010, revision A;
o Site 8, prepared by International Coastal
Management, dated 20 Oct 2016, reference
Department of Infrastructure, Local Government and Planning Page 8
Page 9
SDA-0117-036529
No. Conditions Condition timing
2016.0028-011, revision A;
o Site 9, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-012, revision A;
o Site 10, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-013, revision A;
o Site 11, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-014, revision A;
o Site 12, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-015, revision A;
o Site 13, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-016, revision B;
o Site 14, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-017, revision A;
o Site 16, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-019, revision A;
o Detail, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-020, revision A;
12. Provide written notice to [email protected], when the At least five (5)
development authorised under this approval has started, and business days but
when it has been completed. no greater than
twenty (20)
These notices must state this permit number, the location and business days prior
the condition number under which the notice is being given. to the
commencement of
The notice advising of the completion date must also include a fisheries
report documenting the completed development works, including development works
but not limited to:
photographs taken before, during and after the And then, as to the
development works at specific photo-monitoring sites. notice advising of the
completion date,
within 15 business
an evaluation of the actual impacts of the development days of the
on the Noosa River Fish Habitat Area as per section 12 completion of the
Monitoring schedule, of the Noosa River Oyster Reef fisheries
Restoration Plan, prepared by Dr Ben Gilby, Dr Andrew development works.
Olds, Dr Thomas Schlacher, Dr Simon Walker and Dr
Michael Gloster, dated 11 January 2017.
13. Spoil is not disposed of on tidal lands or within waterways and is At all times
managed to prevent acid soil development.
Department of Infrastructure, Local Government and Planning Page 9
Page 10
SDA-0117-036529
No. Conditions Condition timing
14. Until the works have been completed, permit access to the place For the duration of
where the works are located by Department of Agriculture and the works the subject
Fisheries officers if requested. of this approval
15. Mark with buoys the boundary of the approved tidal component Prior to the
of the development footprint, as shown on the following plans: commencement of
o Site 1, prepared by International Coastal the works, and to be
Management, dated 20 Oct 2016, reference maintained until the
works have been
2016.0028-004, revision A;
completed
o Site 2, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-005, revision A;
o Site 3, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-006, revision A;
o Site 4, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-007, revision A;
o Site 5, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-008, revision A;
o Site 6, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-009, revision A;
o Site 7, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-010, revision A;
o Site 8, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-011, revision A;
o Site 9, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-012, revision A;
o Site 10, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-013, revision A;
o Site 11, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-014, revision A;
o Site 12, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-015, revision A;
o Site 13, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-016, revision B;
o Site 14, prepared by International Coastal
Management, dated 20 Oct 2016, reference
Department of Infrastructure, Local Government and Planning Page 10
Page 11
SDA-0117-036529
No. Conditions Condition timing
2016.0028-017, revision A;
o Site 16, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-019, revision A;
o Detail, prepared by International Coastal
Management, dated 20 Oct 2016, reference
2016.0028-020, revision A;
16. Tidal land profiles that are temporarily disturbed by the Upon completion of
development works, including tidal lands where any oyster reef the works the
restoration units are removed, must be promptly restored to pre- subject of this
work profiles. approval
Department of Infrastructure, Local Government and Planning Page 11
Page 12
SDA-0117-036529
SARA reference: SDA-0117-036529
Ass manager reference: OPW17/0016
Applicant reference: OP0028449
Attachment 2—Reasons for decision to impose conditions
The reasons for this decision are:
Coastal protection:
To ensure the development is carried out generally in accordance with the plans of
development submitted with the application.
To ensure the development avoids or minimises adverse impacts on coastal
resources and their values.
To ensure landowners are aware they must take responsibility for their damaged
property as they can impact on coastal resources and public safety.
To ensure demolition of tidal work occurs in a timely fashion and does not
adversely impact on coastal processes.
Development works must comply with the approved plans to avoid unacceptable
impact on coastal values and physical coastal processes. RPEQ signoff indicates
the development is appropriately designed and is structurally sound.
Damaged structures can impact on coastal resources and public safety.
Maritime safety:
To facilitate the monitoring of the development works for compliance purposes.
To facilitate the monitoring of the development works for compliance purposes.
To ensure that at all times, all lights on or above the development site do not
interfere with safe navigation in surrounding waterways.
Fisheries resources:
To ensure development in fish habitats avoid the unnecessary loss or, degradation of fish
habitats or limits fish movement during key seasonal periods.
To ensure the development is carried out in the location and to the extent specified on the
approved plans of development.
To facilitate the monitoring of the development works for compliance purposes.
Department of Infrastructure, Local Government and Planning Page 12
Page 13
SDA-0117-036529
To ensure the disturbance of acid sulfate soil is managed to prevent impacts on
fisheries resources and fish habitats.
To facilitate the monitoring of the development works for compliance purposes.
To ensure the development does not encroach into fish habitat areas outside the
approved area.
To ensure tidal land profiles are restored to match the surrounding or pre-works
sediment profile to aid re-colonisation by flora and fauna.
Department of Infrastructure, Local Government and Planning Page 13
Page 14
SDA-0117-036529 SARA reference: SDA-0117-036529 Ass manager reference: OPW17/0016 Applicant reference: OP0028449 Attachment 3—Approved plans and specifications Department of Infrastructure, Local Government and Planning Page 14
Page 15
LOCALITY PLAN
NOOSA RIVER
NORTH
Notes
1. Purpose of works: Restore natural oyster recruitment
processes via provision of oyster spat settlement sites that
were lost from anthropogenic impacts.
2. Scope of Works:
NOTES
2.1 Establish Resource Allocation Area at 15 sites
1. Purpose of Works: Restore oyster settlement areas
2.2 Deployment of oyster reef restoration units at each
throughout the Noosa river that were lost to heavy dredging
site. in the 19th century.
2. Scope
-Each of Works:
Oyster reef restoration unit comprises three
2.1. Establish Resource Allocation Area (RAA) at 16 sites
restoration nurseries
2.2. Deployment of oyster reefs at each site
-Each restoration
- Each nursery comprises
oyster reef comprisesthree coiroyster
of three bagsunits
- Each oyster
-Materials anticipated to unit comprises
biodegrae as of three reef
oyster coir bags
restoration
- Materials anticipated to biodegrade as oyster reef
unit establishes.
establishes
- See drawing 2016.0028 - 020 for detail
Drawing List
2016.0028 - 001 A Site Location
2016.0028 - 002 A Plan Layout Sites 1 - 12
2016.0028 - 003 A Plan Layout Sites 13 - 16
2016.0028 - 004 A Reef Site 1
2016.0028 - 005 A Reef Site 2
2016.0028 - 006 A Reef Site 3
2016.0028 - 007 A Reef Site 4
2016.0028 - 008 A Reef Site 5
2016.0028 - 009 A Reef Site 6
2016.0028 - 010 A Reef Site 7
2016.0028 - 011 A Reef Site 8
2016.0028 - 012 A Reef Site 9
2016.0028 - 013 A Reef Site 10
2016.0028 - 014 A Reef Site 11
2016.0028 - 015 A Reef Site 12
2016.0028 - 016 B Reef Site 13
2016.0028 - 017 A Reef Site 14
2016.0028 - 018 A Reef Site 15
2016.0028 - 019 A Reef Site 16
2016.0028 - 020 A Oyster Reef Detail
3. All sites within Noosa River Fish Habitat Area, High
Ecological Value Waters and Areas of High Ecological
Significance. Works are intended to reinstate habitat
previously lost in these locations.
4. No disturbance of marine plants. If marine plants are present
in nominated location, reef to be relocated.
5. Some sites plot within Noosa River Protected Area, Areas of
Wildlife Habitat or Regulated Vegetation. All reefs to be
relocated below HAT and clear of existing terrestrial and
LEGEND
marine vegetation.
6. No separate cultural heritage assessment undertaken.
LEGEND
Oyster Reef Restoration Unit Site
OYSTER
(referred REEF SITESin this drawing
to hereafter
set as Oyster Reef Restoration Site
OR oyster reef location)
AHD
VERTICAL DATUM: HORIZONTAL DATUM: MGA
REVISION REGISTER
A 19/10/16 Notes Amended SK BC AJ
LAKE WEYBA REV.NO. DATE DESCRIPTION BY ENG. APP.
International
Coastal
Management
OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
TELEPHONE +61 7 55640564 FAX +61 7 55329147
WEBSITE www.coastalmanagement.com.au
PROJECT NAME
NOOSA
NOOSA RIVER
RIVER OYSTER
OYSTER REEFS
RESTORATION
DRAWING TITLE
SITE LOCATION
DRAWING No. REVISION:
2016.0028 - 001 A
DRAWN : SK CHECKED : BC APPROVED : AJ
RPEQ 2876
SIZE: A3 SCALE : DATE : 20 Oct, 2016
Page 16
LOCALITY PLAN
SITE 1
NORTH
SITE 10
SITE 2 NOTES
1. Locations given are indicative based on available survey
data. Final locations may be adjusted on site to ensure
design intent is achieved
- Site coordinate located at approximately LAT
- Crest of reef units NOT to be above HAT
- Reef units are placed within a 5m equilaterial triangle
footprint
SITE 9
- Where possible, 2 reef units to be placed with base at
LAT
2. Resource Allocation Area (RAA) to be 90m 2 circle of
5.35m radius centered at site coordinates provided
SITE 3
SITE 6
SITE 7 SITE 8
SITE 4
NOOSA RIVER SITE 11
LEGEND
SITE 5
OYSTER
OYSTERREEF
REEFSITE
RESTORATION SITE
SITE 12
RESOURCE ALLOCATION AREA (RAA)
(5.35m Radius)
VERTICAL DATUM: AHD HORIZONTAL DATUM: MGA
REVISION REGISTER
Site Number Easting Northing Site Number Easting Northing
1 504268 7082455 7 505433 7080679 A 19/10/16
add RAA
and updated site locations SK BC AJ
DATE DESCRIPTION BY ENG. APP.
2 504555 7081863 8 506151 7080584
REV.NO.
International
3 504293 7081482 9 507055 7081187 Coastal
4 504441 7080714 10 507134 7081732 Management
OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
5 504960 7080594 11 508037 7080212 POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
TELEPHONE +61 7 55640564 FAX +61 7 55329147
WEBSITE www.coastalmanagement.com.au
6 505112 7080859 12 507660 7079935
PROJECT NAME
NOOSA
NOOSA RIVER
RIVER
NOOSA OYSTER
OYSTER
RIVER RESTORATION
RESTORATION
OYSTER REEFS
DRAWING TITLE
PLAN LAYOUT SITE 1 - 12
DRAWING No. REVISION:
2016.0028 - 002 A
DRAWN : SK CHECKED : BC APPROVED : AJ
RPEQ 2876
SIZE: A3 SCALE : DATE : 20 Oct, 2016
Page 17
LOCALITY PLAN
NORTH
NORTH
SITE 13
NOTES
1. Locations given are indicative based on available survey
data. Final locations may be adjusted on site to ensure
design intent is achieved
- Site coordinate located approximately at LAT
SITE 16 - Crest of reef units NOT to be above HAT
- Reef units are placed within a 5m equilaterial triangle
footprint
Site 15 15
SITE - Where possible, 2 reef units to be placed with base
at LAT
Resource Allocation Area (RAA) to be 90m 2 circle of
deleted 2.
5.35m radius centered at site coordinates provided
LAKE WEYBA
SITE 14
LEGEND
OYSTER REEF
OYSTER REEF SITE
RESTORATION SITE
RESOURCE ALLOCATION AREA (RAA)
(5.35m Radius)
VERTICAL DATUM: AHD HORIZONTAL DATUM: MGA
REVISION REGISTER
Site Number Easting Northing Site Number Easting Northing
13 507103 7078796 16 506176 7075586
add RAA
A 19/10/16 and updated site locations SK BC AJ
14 507105 7078683 REV.NO. DATE DESCRIPTION BY ENG. APP.
15 507283 7078633 International
Coastal
Management
OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
TELEPHONE +61 7 55640564 FAX +61 7 55329147
WEBSITE www.coastalmanagement.com.au
PROJECT NAME
NOOSA
NOOSA RIVER
RIVER OYSTER
OYSTER REEFS
RESTORATION
DRAWING TITLE
PLAN LAYOUT SITE 13 - 16
DRAWING No. REVISION:
2016.0028 - 003 A
DRAWN : SK CHECKED : BC APPROVED : AJ
RPEQ 2876
SIZE: A3 SCALE : DATE : 20 Oct, 2016
Page 18
LOCALITY PLAN
NORTH NORTH
FLOOD FLOW
DIRECTION
NOTES
1. All measurements are in meters
2. Tidal levels based on Marine Safety Queensland Tide Tables
2016
3. Hydrographic survey by Definium, 2011
4. Aerial photograph from Google Earth, 20/5/2016
OYSTER REEF LA
5. For oyster reef location;
- see drawing 2016.0028-002
T 6. For reef unit design;
- see drawing 2016.0028-020
7. Numerical Modelling data provided by WMA Water
- Peak tidal velocity = 0.07 m/s
- 50yr peak flood velocity = 0.51m/s
TO RIVER
ENTRANCE
LEGEND
Mean High Water Springs (MHWS)
Mean Low Water Springs (MLWS)
Lowest Astronomical Tide (LAT)
55 MCH1667
RP Boundaries
Oyster
Oyster Reef
Reef Restoration Site
Resource Allocation Area (RAA)
(5.35m Radius)
Buffer Zone
(20m outside boundary of RAA)
VERTICAL DATUM: AHD HORIZONTAL DATUM: MGA
0 5 10 15 20m REVISION REGISTER
A 19/10/16 add RAA and 20m buffer SK BC AJ
REV.NO. DATE DESCRIPTION BY ENG. APP.
International
Coastal
Management
OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
TELEPHONE +61 7 55640564 FAX +61 7 55329147
WEBSITE www.coastalmanagement.com.au
PROJECT NAME
NOOSA
NOOSA RIVER
NOOSA
RIVER OYSTER
RIVER RESTORATION
OYSTER
OYSTER REEFS
RESTORATION
Definium Survey 2011 DRAWING TITLE
REEF SITE 1
DRAWING No. REVISION:
2016.0028 - 004 A
DRAWN : SK CHECKED : BC APPROVED : AJ
RPEQ 2876
SIZE: A3 SCALE : DATE : 20 Oct, 2016
Page 19
LOCALITY PLAN
S
NORTH
MLW
NORTH
LAT
OYSTER REEF
NOTES
1. All measurements are in meters
2. Tidal levels based on Marine Safety Queensland Tide Tables
2016
3. Hydrographic survey by Definium, 2011
AND Aurecon 2013 flood model bathymetry
4. Aerial photograph from Google Earth, 20/5/2016
5. For oyster reef location;
- see drawing 2016.0028-002
6. For reef unit design;
- see drawing 2016.0028-020
7. Numerical Modelling data provided by WMA Water
- Peak tidal velocity = 0.11 m/s
- 50yr peak flood velocity = 0.39m/s
FLOOD FLOW
LEGEND
DIRECTION Mean High Water Springs (MHWS)
Mean Low Water Springs (MLWS)
Lowest Astronomical Tide (LAT)
RP Boundaries
Oyster Reef
Oyster Reef Restoration Site
Resource Allocation Area (RAA)
(5.35m Radius)
Buffer Zone
TO RIVER (20m outside boundary of RAA)
0 10 20 30 40 50m ENTRANCE AHD
VERTICAL DATUM: HORIZONTAL DATUM: MGA
0 5 10 15 20m REVISION REGISTER
A 19/10/16 add RAA and 20m buffer SK BC AJ
REV.NO. DATE DESCRIPTION BY ENG. APP.
International
Coastal
Management
OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
TELEPHONE +61 7 55640564 FAX +61 7 55329147
WEBSITE www.coastalmanagement.com.au
WMA Water Model
Aurecon 2013 Bathymetry PROJECT NAME
Definium Survey 2011 NOOSA
NOOSARIVER
NOOSA OYSTER
RIVER
RIVER RESTORATION
OYSTER
OYSTER REEFS
RESTORATION
DRAWING TITLE
REEF SITE 2
DRAWING No. REVISION:
2016.0028 - 005 A
DRAWN : SK CHECKED : BC APPROVED : AJ
RPEQ 2876
SIZE: A3 SCALE : DATE : 20 Oct, 2016
Page 20
LOCALITY PLAN
NORTH
NORTH
307 MCH4551
LAT NOTES
S 1. All measurements are in meters
W
OYSTER REEF ML 2. Tidal levels based on Marine Safety Queensland Tide Tables
2016
3. Hydrographic survey by Definium, 2011
4. Aerial photograph from Google Earth, 20/5/2016
5. For oyster reef location;
- see drawing 2016.0028-002
6. For reef unit design;
- see drawing 2016.0028-020
7. Numerical Modelling data provided by WMA Water
- Peak tidal velocity = 0.10 m/s
- 50yr peak flood velocity = 0.33 m/s
FLOOD FLOW
DIRECTION
LEGEND
Mean High Water Springs (MHWS)
Mean Low Water Springs (MLWS)
Lowest Astronomical Tide (LAT)
RP Boundaries
Oyster Reef
Oyster Reef Restoration Site
Resource Allocation Area (RAA)
(5.35m Radius)
Buffer Zone
(20m outside boundary of RAA)
TO RIVER AHD
VERTICAL DATUM: HORIZONTAL DATUM: MGA
0 10 20 30 40 50m ENTRANCE 0 5 10 15 20m REVISION REGISTER
A 19/10/16 add RAA and 20m buffer SK BC AJ
REV.NO. DATE DESCRIPTION BY ENG. APP.
International
Coastal
Management
OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
TELEPHONE +61 7 55640564 FAX +61 7 55329147
WEBSITE www.coastalmanagement.com.au
PROJECT NAME
NOOSA RIVER
NOOSA OYSTER
RIVER RESTORATION
OYSTER REEFS
Definium Survey 2011
DRAWING TITLE
REEF SITE 3
DRAWING No. REVISION:
2016.0028 - 006 A
DRAWN : SK CHECKED : BC APPROVED : AJ
RPEQ 2876
SIZE: A3 SCALE : DATE : 20 Oct, 2016
Page 21
LOCALITY PLAN
MLWS
NORTH NORTH
LAT
1 SP254358
35 MCH4795
NOTES
1. All measurements are in meters
2. Tidal levels based on Marine Safety Queensland Tide Tables
2016
3. Hydrographic survey by Definium, 2011
4. Aerial photograph from Google Earth, 20/5/2016
5. For oyster reef location;
- see drawing 2016.0028-002
6. For reef unit design;
- see drawing 2016.0028-020
7. Numerical Modelling data provided by WMA Water
- Peak tidal velocity = 0.17 m/s
- 50yr peak flood velocity = 0.42 m/s
OYSTER REEF
35 MCH4795
LEGEND
FLOOD FLOW Mean High Water Springs (MHWS)
DIRECTION Mean Low Water Springs (MLWS)
Lowest Astronomical Tide (LAT)
RP Boundaries
Oyster Reef Restoration Site
Oyster Reef
Resource Allocation Area (RAA)
(5.35m Radius)
Buffer Zone
(20m outside boundary of RAA)
TO RIVER AHD
VERTICAL DATUM: HORIZONTAL DATUM: MGA
0 10 20 30 40 50m ENTRANCE 0 5 10 15 20m REVISION REGISTER
A 19/10/16 add RAA and 20m buffer SK BC AJ
REV.NO. DATE DESCRIPTION BY ENG. APP.
International
Coastal
Management
OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
TELEPHONE +61 7 55640564 FAX +61 7 55329147
WEBSITE www.coastalmanagement.com.au
PROJECT NAME
NOOSA RIVER
NOOSA OYSTER
RIVER RESTORATION
OYSTER REEFS
Definium Survey 2011 DRAWING TITLE
REEF SITE 4
DRAWING No. REVISION:
2016.0028 - 007 A
DRAWN : SK CHECKED : BC APPROVED : AJ
RPEQ 2876
SIZE: A3 SCALE : DATE : 20 Oct, 2016
Page 22
LOCALITY PLAN
NORTH NORTH
35 MCH4795
MHWS
NOTES
1. All measurements are in meters
2. Tidal levels based on Marine Safety Queensland Tide Tables
2016
3. Hydrographic survey by Definium, 2011
AND Aurecon 2013 flood model bathymetry
MLWS
4. Aerial photograph from Google Earth, 20/5/2016
LAT 5. For oyster reef location;
- see drawing 2016.0028-002
6. For reef unit design;
- see drawing 2016.0028-020
OYSTER REEF 7. Numerical Modelling data provided by WMA Water
- Peak tidal velocity = 0.19 m/s
- 50yr peak flood velocity = 0.05 m/s
LEGEND
Mean High Water Springs (MHWS)
Mean Low Water Springs (MLWS)
Lowest Astronomical Tide (LAT)
RP Boundaries
Oyster
OysterReef
ReefRestoration Site
FLOOD FLOW
Resource Allocation Area (RAA)
DIRECTION (5.35m Radius)
TO RIVER Buffer Zone
ENTRANCE (20m outside boundary of RAA)
VERTICAL DATUM: AHD HORIZONTAL DATUM: MGA
0 10 20 30 40 50m 0 5 10 15 20m REVISION REGISTER
A 19/10/16 add RAA and 20m buffer SK BC AJ
REV.NO. DATE DESCRIPTION BY ENG. APP.
International
Coastal
Management
OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
TELEPHONE +61 7 55640564 FAX +61 7 55329147
WEBSITE www.coastalmanagement.com.au
WMA Water Model
Aurecon 2013 Bathymetry
PROJECT NAME
Definium Survey 2011 NOOSA RIVER
NOOSA OYSTER
RIVER RESTORATION
OYSTER REEFS
DRAWING TITLE
REEF SITE 5
DRAWING No. REVISION:
2016.0028 - 008 A
DRAWN : SK CHECKED : BC APPROVED : AJ
RPEQ 2876
SIZE: A3 SCALE : DATE : 20 Oct, 2016
Page 23
LOCALITY PLAN
276 M37229
NORTH
NORTH
NOTES
1. All measurements are in meters
2. Tidal levels based on Marine Safety Queensland Tide Tables
2016
3. Hydrographic survey by Definium, 2011
4. Aerial photograph from Google Earth, 20/5/2016
5. For oyster reef location;
- see drawing 2016.0028-002
6. For reef unit design;
- see drawing 2016.0028-020
FLOOD FLOW 7. Nuemrical Modelling data provided by WMA Water
DIRECTION - Peak tidal velocity = 0.13 m/s
- 50yr peak flood velocity = 0.48 m/s
OYSTER REEF
TO RIVER Ap
pr
Recent site inspection ENTRANCE ox
.L
indicates site is AT
free of marine plants
LEGEND
Mean High Water Springs (MHWS)
Mean Low Water Springs (MLWS)
Lowest Astronomical Tide (LAT)
RP Boundaries
Oyster Reef
Resource Allocation Area (RAA)
(5.35m Radius)
Buffer Zone
(20m outside boundary of RAA)
0 10 20 30 40 50m VERTICAL DATUM: AHD HORIZONTAL DATUM: MGA
0 5 10 15 20m REVISION REGISTER
add RAA, 20m buffer
A 19/10/16 updated site location SK BC AJ
REV.NO. DATE DESCRIPTION BY ENG. APP.
International
Coastal
Management
OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
TELEPHONE +61 7 55640564 FAX +61 7 55329147
WEBSITE www.coastalmanagement.com.au
Definium Survey 2011 PROJECT NAME
NOOSA RIVER
NOOSA OYSTER
RIVER RESTORATION
OYSTER REEFS
DRAWING TITLE
REEF SITE 6
DRAWING No. REVISION:
2016.0028 - 009 A
DRAWN : SK CHECKED : BC APPROVED : AJ
RPEQ 2876
SIZE: A3 SCALE : DATE : 20 Oct, 2016
Page 24
LOCALITY PLAN
NORTH NORTH
FLOOD FLOW
DIRECTION
NOTES
1. All measurements are in meters
TO RIVER 2. Tidal levels based on Marine Safety Queensland Tide Tables
2016
ENTRANCE
Recent site inspection 3. Hydrographic survey by Definium, 2011
indicates site is 4. Aerial photograph from Google Earth, 20/5/2016
free of marine plants 5. For oyster reef location;
- see drawing 2016.0028-002
6. For reef unit design;
- see drawing 2016.0028-020
7. Numerical Modelling data provided by WMA Water
- Peak tidal velocity = 0.17 m/s
- 50yr peak flood velocity = 0.47 m/s
OYSTER REEF
S
LW
T
LA
M
LEGEND
Mean High Water Springs (MHWS)
Mean Low Water Springs (MLWS)
Lowest Astronomical Tide (LAT)
RP Boundaries
Oyster
Oyster Reef
Reef Restoration Site
Resource Allocation Area (RAA)
(5.35m Radius)
Buffer Zone
(20m outside boundary of RAA)
0 10 20 30 40 50m 0 5 10 15 20m VERTICAL DATUM: AHD
REVISION REGISTER
HORIZONTAL DATUM: MGA
add RAA, 20m buffer
A 19/10/16 SK BC AJ
updated site location
REV.NO. DATE DESCRIPTION BY ENG. APP.
International
Coastal
Management
OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
TELEPHONE +61 7 55640564 FAX +61 7 55329147
WEBSITE www.coastalmanagement.com.au
Definium Survey 2011 PROJECT NAME
NOOSA
NOOSA RIVER
RIVER OYSTER
OYSTER REEFS
RESTORATION
DRAWING TITLE
REEF SITE 7
DRAWING No. REVISION:
2016.0028 - 010 A
DRAWN : SK CHECKED : BC APPROVED : AJ
RPEQ 2876
SIZE: A3 SCALE : DATE : 20 Oct, 2016
Page 25
LOCALITY PLAN
NORTH NORTH WS
MH
MLWS NOTES
1. All measurements are in meters
LAT 2. Tidal levels based on Marine Safety Queensland Tide Tables
2016
3. Hydrographic survey by Definium, 2011
AND Aurecon 2013 flood model bathymetry
OYSTER REEF 4.
5.
Aerial photograph from Google Earth, 20/5/2016
For oyster reef location;
- see drawing 2016.0028-002
6. For reef unit design;
- see drawing 2016.0028-020
7. Numerical Modelling data provided by WMA Water
- Peak tidal velocity = 0.21 m/s
- 50yr peak flood velocity = 0.51 m/s
TO RIVER
ENTRANCE
FLOOD FLOW
DIRECTION
LEGEND
Mean High Water Springs (MHWS)
Mean Low Water Springs (MLWS)
Lowest Astronomical Tide (LAT)
RP Boundaries
Oyster
OysterReef
Reef Restoration Site
Resource Allocation Area (RAA)
(5.35m Radius)
Buffer Zone
(20m outside boundary of RAA)
0 10 20 30 40 50m AHD
VERTICAL DATUM: HORIZONTAL DATUM: MGA
0 5 10 15 20m REVISION REGISTER
A 19/10/16 add RAA and 20m buffer SK BC AJ
REV.NO. DATE DESCRIPTION BY ENG. APP.
International
Coastal
Management
OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
TELEPHONE +61 7 55640564 FAX +61 7 55329147
WEBSITE www.coastalmanagement.com.au
WMA Water Model
Aurecon 2013 Bathymetry
PROJECT NAME
NOOSA RIVERRIVER
NOOSA OYSTER RESTORATION
OYSTER REEFS
DRAWING TITLE
Definium Survey 2011 REEF SITE 8
DRAWING No. REVISION:
2016.0028 - 011 A
DRAWN : SK CHECKED : BC APPROVED : AJ
RPEQ 2876
SIZE: A3 SCALE : DATE : 20 Oct, 2016
Page 26
LOCALITY PLAN
NORTH TO RIVER NORTH
ENTRANCE
MHWS
NOTES
1. All measurements are in meters
2. Tidal levels based on Marine Safety Queensland Tide Tables
FLOOD FLOW 2016
DIRECTION 3. Hydrographic survey by Definium, 2011
AND Aurecon 2013 flood model bathymetry
4. Aerial photograph from Google Earth, 20/5/2016
5. For oyster reef location;
- see drawing 2016.0028-002
6. For reef unit design;
- see drawing 2016.0028-020
7. Numerical Modelling data provided by WMA Water
- Peak tidal velocity = 0.08 m/s
- 50yr peak flood velocity = 0.40 m/s
OYSTER REEF
LEGEND
Mean High Water Springs (MHWS)
MLW
S Mean Low Water Springs (MLWS)
Lowest Astronomical Tide (LAT)
LAT
RP Boundaries
Oyster
Oyster Reef
Reef Restoration Site
Resource Allocation Area (RAA)
(5.35m Radius)
Buffer Zone
(20m outside boundary of RAA)
AHD
VERTICAL DATUM: HORIZONTAL DATUM: MGA
0 10 20 30 40 50m
0 5 10 15 20m REVISION REGISTER
A 19/10/16 add RAA and 20m buffer SK BC AJ
REV.NO. DATE DESCRIPTION BY ENG. APP.
International
Coastal
Management
OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
TELEPHONE +61 7 55640564 FAX +61 7 55329147
WEBSITE www.coastalmanagement.com.au
WMA Water Model
Aurecon 2013 Bathymetry
PROJECT NAME
NOOSA
NOOSA RIVER
RIVER OYSTER
OYSTER REEFS
RESTORATION
DRAWING TITLE
Definium Survey 2011 REEF SITE 9
DRAWING No. REVISION:
2016.0028 - 012 A
DRAWN : SK CHECKED : BC APPROVED : AJ
RPEQ 2876
SIZE: A3 SCALE : DATE : 20 Oct, 2016
Page 27
LOCALITY PLAN
LAT
TO RIVER
ENTRANCE
NORTH
MLWS
NORTH
NOTES
1. All measurements are in meters
OYSTER REEF 2. Tidal levels based on Marine Safety Queensland Tide Tables
2016
3. Hydrographic survey by Definium, 2011
AND Aurecon 2013 flood model bathymetry
4. Aerial photograph from Google Earth, 20/5/2016
5. For oyster reef location;
- see drawing 2016.0028-002
6. For reef unit design;
- see drawing 2016.0028-020
7. Numerical Modelling data provided by WMA Water
- Peak tidal velocity = 0.19 m/s
- 50yr peak flood velocity = 0.17 m/s
FLOOD FLOW
DIRECTION
LEGEND
Mean High Water Springs (MHWS)
Mean Low Water Springs (MLWS)
Lowest Astronomical Tide (LAT)
RP Boundaries
Oyster Reef Restoration Site
Oyster Reef
Resource Allocation Area (RAA)
(5.35m Radius)
Buffer Zone
(20m outside boundary of RAA)
VERTICAL DATUM: AHD HORIZONTAL DATUM: MGA
0 10 20 30 40 50m 0 5 10 15 20m REVISION REGISTER
A 19/10/16 add RAA and 20m buffer SK BC AJ
REV.NO. DATE DESCRIPTION BY ENG. APP.
International
Coastal
Management
OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
TELEPHONE +61 7 55640564 FAX +61 7 55329147
WEBSITE www.coastalmanagement.com.au
WMA Water Model
Aurecon 2013 Bathymetry
PROJECT NAME
NOOSA RIVER
NOOSA OYSTER
RIVER RESTORATION
OYSTER REEFS
DRAWING TITLE
Definium Survey 2011 REEF SITE 10
DRAWING No. REVISION:
2016.0028 - 013 A
DRAWN : SK CHECKED : BC APPROVED : AJ
RPEQ 2876
SIZE: A3 SCALE : DATE : 20 Oct, 2016
Page 28
LOCALITY PLAN
TO RIVER
ENTRANCE
NORTH NORTH
FLOOD FLOW
DIRECTION NOTES
1. All measurements are in meters
2. Tide levels provided from model by WMA Water 2016
3. Profile derived from Aurecon 2013 flood model bathymetry
4. Aerial photograph from Google Earth, 20/5/2016
5. For oyster reef location;
- see drawing 2016.0028-002
6. For reef unit design;
- see drawing 2016.0028-020
7. Numerical Modelling data provided by WMA Water
- Peak tidal velocity = 0.02 m/s
OYSTER REEF - 50yr peak flood velocity = 0.22 m/s
LAT
T
HA
LEGEND
Mean High Water Springs (MHWS)
Mean Low Water Springs (MLWS)
604 SP188270 Lowest Astronomical Tide (LAT)
RP Boundaries
Oyster
Oyster Reef
Reef Restoration Site
Resource Allocation Area (RAA)
(5.35m Radius)
Buffer Zone
(20m outside boundary of RAA)
AHD
VERTICAL DATUM: HORIZONTAL DATUM: MGA
0 10 20 30 40 50m 0 5 10 15 20m REVISION REGISTER
A 19/10/16 add RAA and 20m buffer SK BC AJ
REV.NO. DATE DESCRIPTION BY ENG. APP.
International
Coastal
Management
OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
TELEPHONE +61 7 55640564 FAX +61 7 55329147
WEBSITE www.coastalmanagement.com.au
PROJECT NAME
WMA Water Model NOOSA
NOOSA RIVER
RIVER OYSTER
OYSTER REEFS
RESTORATION
Aurecon 2013 Bathymetry DRAWING TITLE
REEF SITE 11
DRAWING No. REVISION:
2016.0028 - 014 A
DRAWN : SK CHECKED : BC APPROVED : AJ
RPEQ 2876
SIZE: A3 SCALE : DATE : 20 Oct, 2016
Page 29
LOCALITY PLAN
TO RIVER 145 MCH4796
ENTRANCE
NORTH NORTH
FLOOD FLOW NOTES
DIRECTION 1. All measurements are in meters
2. Tide levels provided from model by WMA Water 2016
3. Profile derived from Aurecon 2013 flood model bathymetry
4. Aerial photograph from Google Earth, 20/5/2016
5. For oyster reef location;
- see drawing 2016.0028-002
6. For reef unit design;
- see drawing 2016.0028-020
7. Numerical Modelling data provided by WMA Water
- Peak tidal velocity = 0.21 m/s
- 50yr peak flood velocity = 0.18 m/s
T
LA
OYSTER REEF
Recent site inspection
indicates site is
162 CP849516
free of marine plants LEGEND
Mean High Water Springs (MHWS)
Mean Low Water Springs (MLWS)
Lowest Astronomical Tide (LAT)
RP Boundaries
Oyster Reef Restoration Site
Oyster Reef
Resource Allocation Area (RAA)
(5.35m Radius)
Buffer Zone
(20m outside boundary of RAA)
AHD
VERTICAL DATUM: HORIZONTAL DATUM: MGA
0 10 20 30 40 50m
0 5 10 15 20m REVISION REGISTER
A 19/10/16 add RAA and 20m buffer SK BC AJ
REV.NO. DATE DESCRIPTION BY ENG. APP.
International
Coastal
Management
OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
TELEPHONE +61 7 55640564 FAX +61 7 55329147
WEBSITE www.coastalmanagement.com.au
WMA Water Model
Aurecon 2013 Bathymetry PROJECT NAME
NOOSA RIVERRIVER
NOOSA OYSTER RESTORATION
OYSTER REEFS
DRAWING TITLE
REEF SITE 12
DRAWING No. REVISION:
2016.0028 - 015 A
DRAWN : SK CHECKED : BC APPROVED : AJ
RPEQ 2876
SIZE: A3 SCALE : DATE : 20 Oct, 2016
Page 30
LOCALITY PLAN
NORTH
NORTH
Storm Water
Outlet TO RIVER
ENTRANCE NOTES
1. All measurements are in meters
2. Tide levels provided from model by WMA Water 2016
3. Profile derived from Aurecon 2013 flood model bathymetry
4. Aerial photograph from Google Earth, 20/5/2016
OYSTER REEF 5. For oyster reef location;
- see drawing 2016.0028-003
6. For reef unit design;
- see drawing 2016.0028-020
7. Numerical Modelling data provided by WMA Water
- Peak tidal velocity = 0.14 m/s
- 50yr peak flood velocity = 0.17 m/s
FLOOD FLOW
DIRECTION
LEGEND
Approx. LAT
Mean High Water Springs (MHWS)
Mean Low Water Springs (MLWS)
Lowest Astronomical Tide (LAT)
RP Boundaries
Stormwater Outlet
Oyster Reef
Oyster Reef Restoration Site
Resource Allocation Area (RAA)
(5.35m Radius)
Buffer Zone
(20m outside boundary of RAA)
AHD
VERTICAL DATUM: HORIZONTAL DATUM: MGA
0 10 20 30 40 50m 0 5 10 15 20m REVISION REGISTER
B 19/10/16 add RAA and 20m buffer SK BC AJ
A 07/09/16 add stormwater outlet SK BC AJ
REV.NO. DATE DESCRIPTION BY ENG. APP.
International
Coastal
Management
OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
TELEPHONE +61 7 55640564 FAX +61 7 55329147
WEBSITE www.coastalmanagement.com.au
WMA Water Model
Aurecon 2013 Bathymetry
PROJECT NAME
NOOSA RIVERRIVER
NOOSA OYSTER RESTORATION
OYSTER REEFS
DRAWING TITLE
REEF SITE 13
DRAWING No. REVISION:
2016.0028 - 016 B
DRAWN : SK CHECKED : BC APPROVED : AJ
RPEQ 2876
SIZE: A3 SCALE : DATE : 20 Oct, 2016
Page 31
LOCALITY PLAN
TO RIVER
ENTRANCE
NORTH NORTH
FLOOD FLOW
Approx. LAT
DIRECTION
NOTES
1. All measurements are in meters
2. Tide levels provided from model by WMA Water 2016
3. Profile derived from Aurecon 2013 flood model bathymetry
4. Aerial photograph from Google Earth, 20/5/2016
5. For oyster reef location;
OYSTER REEF 6.
- see drawing 2016.0028-003
For reef unit design;
- see drawing 2016.0028-020
7. Numerical Modelling data provided by WMA Water
- Peak tidal velocity = 0.23 m/s
- 50yr peak flood velocity = 0.24 m/s
LEGEND
Mean High Water Springs (MHWS)
Mean Low Water Springs (MLWS)
Lowest Astronomical Tide (LAT)
0 10 20 30 40 50m 0 5 10 15 20m
RP Boundaries
Oyster
Oyster Reef
Reef Restoration Site
Resource Allocation Area (RAA)
(5.35m Radius)
Buffer Zone
(20m outside boundary of RAA)
AHD
VERTICAL DATUM: HORIZONTAL DATUM: MGA
REVISION REGISTER
add RAA, 20m buffer
A 19/10/16 updated site location SK BC AJ
REV.NO. DATE DESCRIPTION BY ENG. APP.
International
Coastal
Management
OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
TELEPHONE +61 7 55640564 FAX +61 7 55329147
WEBSITE www.coastalmanagement.com.au
WMA Water Model PROJECT NAME
Aurecon 2013 Bathymetry NOOSA
NOOSA RIVER
RIVER OYSTER
OYSTER REEFS
RESTORATION
DRAWING TITLE
REEF SITE 14
DRAWING No. REVISION:
2016.0028 - 017 A
DRAWN : SK CHECKED : BC APPROVED : AJ
RPEQ 2876
SIZE: A3 SCALE : DATE : 20 Oct, 2016
Page 32
LOCALITY PLAN
NORTH
NORTH
Approx. Waters Edge
NOTES
1. All measurements are in meters
2. Tide levels assumed based on model by WMA Water 2016
3. Profile assumed - no data available
4. Aerial photograph from Google Earth, 20/5/2016
5. For oyster reef location;
- see drawing 2016.0028-003
6. For reef unit design;
- see drawing 2016.0028-020
Numerical Modelling data not available
OYSTER REEF
TO RIVER
ENTRANCE
LEGEND
Approx. Waters Edge
RP Boundaries
Oyster Reef Restoration Site
FLOOD FLOW Resource Allocation Area (RAA)
(5.35m Radius)
DIRECTION Buffer Zone
(20m outside boundary of RAA)
AHD MGA
0 10 20 30 40 50m 0 5 10 15 20m VERTICAL DATUM:
REVISION REGISTER
HORIZONTAL DATUM:
add RAA, 20m buffer
A 19/10/16 SK BC AJ
updated site location
REV.NO. DATE DESCRIPTION BY ENG. APP.
International
Coastal
Management
OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
TELEPHONE +61 7 55640564 FAX +61 7 55329147
WEBSITE www.coastalmanagement.com.au
Assumed Profile Only - Survey PROJECT NAME
Not Available NOOSA
NOOSA RIVERRIVER OYSTER
OYSTER REEFS
RESTORATION
DRAWING TITLE
REEF SITE 16
DRAWING No. REVISION:
2016.0028 - 019 A
DRAWN : SK CHECKED : BC APPROVED : AJ
RPEQ 2876
SIZE: A3 SCALE : DATE : 20 Oct, 2016
Page 33
LOCALITY PLAN
Restoration unit for natural
recruitment of oyster spat
NOTES
1. Measurements are in meters.
The general layout of the Restoration Units in
2. The reef general layout will be placed in a 5m equilateral
the Oyster Reef Restoration Unit will be placed
triangle.
in a 5m equilateral triangle.
3. Oyster shells are:
- To be whole (not fragments)
- Not to be sourced from within any Fish Habitat Area
- To be boiled for at least 10 minutes in accordance with
biosecurity principles
4. Unfilled coir bags are:
- to be 0.3m in diameter
- to be 1.3m in length with one end closed during
manufacturing
- to have an apeture of approx. 20mm.
- to be Geofabrics Australia CoirLog or engineer approved
equivalent
5. Coir bags are to be filled with the oyster shell mix to 1m
length of the bag.
- Remaining 0.3m length of bag to be used to tie end
closed
- Oyster fill is to be well packed using a tube sleeve
- Bag end closed using approx 0.3m of manila rope to form
a single Miller's (bag) knot, followed by a single overhand
knot
- Two coir bags at base of reef unit to be in direct contact
with minimal space betwen
Nominal LAT 6. Wooden stakes
- to be 0.6m length hardwood with 25x25mm thickness
- to be suitable for marine environments
FLOOD FLOW DIRECTION - to have 10mm diamter hole drilled approx 30mm from top
of stake
Oyster Reef Restoration
OYSTER Unit - Cross Section
REEF - XSECTION 7. Manila rope
OysterOYSTER
Reef Restoration Unit - Plan
REEF - PLAN - to be 8mm diameter Emmett's Ropes Three-Strand
Hawser Laid Manila or engineer approved equivalent
- length for anchorage to be approx. 2m
- to be tied to wooden stakes such that approx. 1.3m length
of manila rope remains between stakes
- to be attached to wooden stakes by threading rope
LEGENDthrough drill hole, followed by a double stopper knot. The
remaining manila rope end is to be hitched back onto the
wooden stake
8. Anchorage to be manila rope tied between two hardwood
stakes, see note 6 and 7.
- stake/rope anchors to be placed approx. 0.2m from ends
Oyster Shell Fill, see note 3. Coir Bag, see note 5. of reef unit
toward reef unit. Wooden stakes NOT to be angled away
from reef units
- manila rope to be pulled tight across coir bags such that
Crest Bags, see note 8 1m crest bag is NOT able to roll
- Reefs to be relocated where hard substrate is
Manila Rope, see note 7. encountered
Wooden stake / manila rope
Two Base Bags, see note 8 AHD
VERTICAL DATUM: HORIZONTAL DATUM: MGA
Wooden Stake, see note 6. REVISION REGISTER
A 07/09/16 amended notes SK BC AJ
DESCRIPTION
0.6m
REV.NO. DATE BY ENG. APP.
Sandy or Sandy/Muddy International
Coastal
Management
OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
TELEPHONE +61 7 55640564 FAX +61 7 55329147
WEBSITE www.coastalmanagement.com.au
Maximum angle towards reef unit, see note 8
approx. 200mm approx. 200mm
PROJECT NAME
NOOSA
NOOSA RIVER
RIVER OYSTER
OYSTER REEFS
RESTORATION
DRAWING TITLE
REEF DETAIL
Restoration
REEFUnit
UNIT- -Cross
PLAN Section DRAWING No. REVISION:
Restoration Unit-- XSECTION
REEF UNIT Cross Section DRAWN : SK
2016.0028 - 020
CHECKED : BC APPROVED :
A
AJ
RPEQ 2876