SDA-0117-036529 - s285 Concurrence agency response With conditions_combined
Attached to the e-mail Concurrence agency response with conditions - Claude Batten Dr.
SDA-0117-036529
No. Conditions Condition timing
Site 12, prepared by International Coastal Management,
dated 20 Oct 2016, reference 2016.0028-015, revision A;
Site 13, prepared by International Coastal Management,
dated 20 Oct 2016, reference 2016.0028-016, revision B;
Site 14, prepared by International Coastal Management,
dated 20 Oct 2016, reference 2016.0028-017, revision A;
Site 16, prepared by International Coastal Management,
dated 20 Oct 2016, reference 2016.0028-019, revision A;
Detail, prepared by International Coastal Management,
dated 20 Oct 2016, reference 2016.0028-020, revision A;
2. For the proposed works only use materials which are free from For the duration of
contaminants as defined under section 11 of the Environmental the works the subject
Protection Act 1994. of this approval
3. (a) The works are to be attached to the land the subject of this At all times
approval.
(b) Should the works become detached the Noosa Shire
Council shall be responsible for the collection and removal
of all debris at their own expense.
4. Where a particular oyster reef restoration unit does not meet the Prior to four (4) years
performance objectives listed in Attachment 2 of the Resource post deployment
Allocation Authority Number 2016CA0575, and is not a viable and
self-sustaining oyster reef fish habitat at the completion of the 3
year trial period, the particular oyster reef restoration unit must be
removed and disposed of appropriately.
5. All works are to be constructed and maintained in a safe At all times
condition, generally in accordance with the drawing titled Detail,
prepared by International Coastal Management, dated 20 Oct
2016, reference 2016.0028-020, revision A.
6. Should the works become damaged as a result of erosion, At all times
flooding or storm tide inundation, the Noosa Shire Council shall be
responsible for the removal of all debris at their own expense.
7.2.15—Pursuant to section 255D of the Sustainable Planning Act 2009, the chief executive
administering the Act nominates the Director-General of the Department of Transport and Main
Roads to be the assessing authority for the development to which this development approval
relates for the administration and enforcement of any matter relating to the following condition(s):
7. (a) “As Constructed” drawings of the approved structure/s Within two (2) weeks
must be provided to: of the completion of
the works.
Regional Harbour Master (Brisbane)
Maritime Operations Base
MacArthur Avenue East
Pinkenba QLD 4008
(b) “As Constructed” drawings must include a Class C
Department of Infrastructure, Local Government and Planning Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.