OPW20-0092 - Applicant's Response to Council's IR · OPW20/0092
Council’s Issue
There are concerns regarding potential of conflict between the proposed stormwater connection pipeline
(225mm , FI5/5-G6/5), from the development into proposed stormwater Pit G6/5, with the existing
intersecting services (sewer main, water main, telecommunication cables) within the road reserve verge.
Information Required by Council
1. Carry out a field investigation to ascertain the locations and depths of the existing intersecting
services and provide a cross section to demonstrate no potential of conflict in this regard. Also,
carrying out a field investigation of the location and depth of the receiving stormwater
structure/pipeline will be an advantage.
Also, it is to be noted that the proposed stormwater line F3/3-FI5/5 intersects the existing sewer
connection from the subject site.
Applicant’s Response
1. The applicant has undertaken investigations to determine the location and depth of the existing services.
As shown on Drawing Number 20538-C12 prepared by TOD Engineers (refer Attachment 1), the existing
watermain will cross under the proposed 225 diameter stormwater pipe from FI5/5 -G6/5. An extract
from the engineering drawing illustrates the location of the proposed pipe in Figure 1.
Figure 1: Extract from engineering drawings indicating proposed stormwater pipe to be located above
existing water line.
Source: TOD Engineers
PO Box 1818 07 5474 3873
Noosa Heads [email protected]
QLD 4567 rgstrategic.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW20-0092 - Applicant's Response to Council's IR.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.