20220198 3 Delorme St Civil OPW

Attached to the e-mail MCU22/0158, OPW22/0228, RAL22/0022 - Response to Further Advice 9_12_22 - RE_ Information Response - 3 Delorme St Noosa Heads.

of 20

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 2, section 1. The text section number identifies this passage in the reader.

GENERAL NOTES                                                                     18. DRAWINGS TO BE READ IN CONJUNCTION WITH ARCHITECT, SURVEYOR,                      THAT THE GEOTECHNICAL CONSULTANT BE CONTACTED TO CONFIRM THE                  CONFIRMATION THAT WORKS CAN COMMENCE.
                                                                                      HYDRAULICS, ETC. CONSULTANT AND CONTRACTOR DRAWINGS.                              SOIL CONDITIONS PRIOR TO EARTHWORKS COMMENCING.                           20. ALL EXCAVATIONS ARE TO BE CONDUCTED IN ACCORDANCE WITH THE
1.   ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN.                                                                                                     2. GRASS AND TOPSOIL SHALL BE STRIPPED TO A MINIMUM DEPTH OF 100MM                REQUIREMENTS OF THE GEOTECHNICAL ENGINEER AS OUTLINED IN THE
                                                                                  19. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT AUTHORITY:
2. ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.                   ROAD OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN FOR ALL WORKS                     OVER THE EXTENT OF THE WORKS UNLESS DIRECTED OTHERWISE AND                    GEOTECHNICAL INVESTIGATION REPORT BY TECTONIC. TEMPORARY
   CONTRACTOR TO ALLOW FOR ALL MEANS NECESSARY TO ACCURATELY                          WITHIN COUNCIL ROAD RESERVES. CONTRACTOR TO ALLOW FOR ALL COSTS                   STOCKPILED WHERE REQUIRED FOR FILL OF LANDSCAPING AREAS. TOPSOIL              UNSURCHARGED CUTS IN LOOSE TO VERY LOOSE SAND TO BE FORMED AT
   SETOUT THE WORKS.                                                                  ASSOCIATED WITH IMPLEMENTATION OF THE TMP.                                        MATERIALS MUST NOT BE USED IN STRUCTURAL FILL.                                1V:2H, AND IN MEDIUM DENSE SAND AT 1V:1H FOR BATTERS UP TO 3M IN
                                                                                                                                                                    3. UNSUITABLE NATURAL MATERIALS SUCH AS SATURATED, LOOSE OR SOFT                  HEIGHT. DEEPER CUTS ARE TO BE ASSESSED BY THE GEOTECHNICAL
3. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT                         20. ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH ALL LOCAL AUTHORITY                                                                                                ENGINEER.
   SPECIFICATIONS AND WHERE FURTHER DETAILS ARE REQUIRED THE                                                                                                            MATERIALS ENCOUNTERED SHOULD BE REMOVED DURING SUBGRADE
                                                                                      APPROVALS RECEIVED FOR THE PROJECT AND IN ACCORDANCE WITH OPW                     PREPARATION FOR BULK EARTHWORKS. ALL UNSUITABLE MATERIAL TO BE            21. WHERE THE ABOVE TEMPORARY BATTER SLOPES CAN NOT BE ACHIEVED,
   CONTRACTOR SHALL REFER TO NOOSA SHIRE COUNCIL DEVELOPMENT                          APPROVALS BY COUNCIL.
   GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES, ASSOCIATED STANDARD                                                                                                    REMOVED FROM SITE AT CONTRACTORS EXPENSE.                                     TEMPORARY SHORING WILL BE REQUIRED UNDER THE ADVICE OF A
   DRAWINGS AND SPECIFICATIONS U.N.O.                                             21. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE                     4. COMPACTION OF THE EXPOSED SAND SUBGRADE REQUIRES SUBSTANTIAL                   SPECIALIST SHORING CONTRACTOR.
                                                                                      BOUNDARY WITHOUT FORMAL APPROVAL BY THE OWNER/CUSTODIAN OF                        VOLUMES OF WATER COMBINED WITH VIBRATORY COMPACTION EQUIPMENT.            22. EXCAVATIONS IN PROXIMITY TO EXISTING STRUCTURES WILL REQUIRE
3. SHOULD ANY OF THE CONSTRUCTED WORKS BE CONSTRUCTED OUTSIDE OF                      THAT LAND INCLUDING BUT NOT LIMITED TO PRIVATE PROPERTY, ROAD                     CARE MUST BE TAKEN TO ENSURE THERE ARE NO IMPACTS ON                          SPECIFIC DESIGN TO PREVENT UNDERMINING WHICH SHOULD BE CARRIED
   THE TOLERANCES SPECIFIED WITHIN THE PROJECT SPECIFICATION AND                      RESERVE, PARKS/OPENSPACE, EASEMENTS.                                              SURROUNDING STRUCTURES. MATERIAL TO BE COMPACTED IN ACCORDANCE                OUT BY A SUITABLY QUALIFIED AND EXPERIENCED RPEQ STRUCTURAL
   LOCAL AUTHORITY REQUIREMENTS, THE CONTRACTOR WILL RECTIFY AT                                                                                                         WITH GEOTECHNICAL REPORT AND AS1289.                                          ENGINEER.
   THEIR COST INCLUSIVE OF ANY ADDITIONAL COSTS INCURRED BY RECOR.                22. THE CONTRACTOR SHALL HAVE AN APPROVED SET OF CONSTRUCTION
                                                                                      DRAWINGS AND APPROVALS ON SITE AT ALL TIMES.                                  5. A MINIMUM 150MM THICK GRANULAR WORKING PLATFORM MAY BE REQUIRED            23. CONTRACTOR'S RPEQ GEOTECHNICAL ENGINEER IS TO CONFIRM THAT ANY
4. EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS                                                                                                        ON SOIL SUBGRADES ALONG HAUL ROADS AND LAYDOWN AREAS TO                       CONSTRUCTED CUT/FILL BATTERS AND RETAINING STRUCTURES ON THE SITE
   SUCH THEIR ACCURACY CANNOT BE GUARANTEED. NO RESPONSIBILITY IS                 23. ALL WATER AND SEWER RETICULATION WORKS TO BE CONSTRUCTED IN                       IMPROVE TRAFFICABILITY. SPECIFIC PLATFORM DESIGN WOULD BE REQUIRED            HAVE ACHIEVED ADEQUATE STABILITY WITH A LONG-TERM FACTOR OF
   TAKEN BY RECOR OR THE PRINCIPAL FOR THE ACCURACY AND                               ACCORDANCE WITH THE SEQ WATER SUPPLY AND SEWERAGE DESIGN AND                      PRIOR TO MOBILISATION AND TRAFFICKING OF ANY HEAVY MOBILE PLANT ON            SAFETY AGAINST GEOTECHNICAL FAILURES TO THEIR SATISFACTION.
   COMPLETENESS OF THIS INFORMATION. IT IS THE RESPONSIBILITY OF THE                  CONSTRUCTION CODE (2013).                                                         THE SITE.                                                                 24. EARTHWORKS LEVELS SHOWN ARE FINISHED SURFACE LEVELS INCLUSIVE OF
   CONTRACTOR TO ACCURATELY ESTABLISH THE LOCATION AND LEVEL OF ALL                                                                                                 6. IMPORTED GENERAL FILL MATERIAL SHALL BE SUPPLIED AND COMPACTED                 TOPSOIL LAYER. REFER TO STRUCTURAL ENGINEERING DRAWINGS FOR
   EXISTING SERVICES PRIOR THE COMMENCEMENT OF ANY WORKS. ANY                     STANDARD SIGNS AND LINE MARKING NOTES                                                 WHERE UNSUITABLE NATURAL MATERIALS ARE LOCATED AND AS OTHERWISE               BUILDING SLAB THICKNESSES AND HYDRAULIC DRAWINGS FOR SUB-FLOOR
   DISCREPANCIES SHALL BE REPORTED TO THE SUPERINTENDENT.                                                                                                               NECESSARY TO OBTAIN SUBGRADE/PLATFORM LEVEL. IMPORTED GENERAL                 DRAINAGE FOR DETERMINATION OF REQUIRED BULK EARTHWORKS SURFACE.
   CONTRACTOR TO LOCATE AND PROTECT SERVICES AS REQUIRED DURING                   1. GENERAL                                                                            FILL MATERIAL SHALL BE CLEAN GRADED MATERIAL FREE OF ORGANIC              25. ANY PRELOADING REQUIRED IS TO OCCUR IN ACCORDANCE WITH THE
   PROPOSED WORKS.                                                                 1.1. ALL SIGNS AND PAVEMENT MARKING IS TO BE IN ACCORDANCE WITH THE                  MATTER AND STONES, WITH MAXIMUM PARTICLE SIZE OF 100mm AND                    GEOTECHNICAL ENGINEERS REQUIREMENTS. CONTRACTOR TO ALLOW FOR
5. THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND                            QUEENSLAND TRANSPORT MANUAL OF UNIFORM TRAFFIC CONTROL                         CAPABLE OF BEING COMPACTED INTO COHERENT FILLING TO THE SPECIFIED             THE IMPORT AND REMOVAL OF ALL NECESSARY MATERIAL TO UNDERTAKE
   SURVEY ALL CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS SHOWN                       DEVICES (CURRENT EDITION).                                                     STANDARD. THE MATERIAL SHALL HAVE A MAXIMUM PLASTICITY INDEX OF               THE PRELOADING OPERATIONS.
   ON THE DRAWINGS INCLUDING ANY POTENTIAL EXISTING SERVICES CLASHES              2. SIGNS                                                                              15%, A SHRINK-SWELL INDEX OF LESS THAN OR EQUAL TO 1% AND A MINIMUM       26. REFER ARCHITECTURAL DRAWINGS FOR BUILDING SETOUT.
   PRIOR TO COMMENCEMENT OF CIVIL WORKS. CONTRACTOR TO IMMEDIATELY                  2.1. ALL SIGNS TO BE REFLECTORISED CLASS 1 TO AS1906.1:2007 UNLESS                  C.B.R. OF 10%.
   REPORT ANY DISCREPANCIES TO RECOR AND AWAIT FORMAL DIRECTION                          NOTED OTHERWISE.                                                           7. ALL EARTHWORKS TO BE CARRIED OUT AT +/- 2% OPTIMUM MOISTURE
   PRIOR TO COMMENCING CIVIL WORKS.                                                 2.2. SIGNS ARE TO BE INSTALLED WITH THE FOLLOWING CLEARANCES TO                     CONTENT FOR STANDARD COMPACTION.                                          INSPECTIONS:
                                                                                         EDGE OF SIGN: LOCATION CLEARANCE NO KERB 600 BEHIND GUIDE                  8. ANY PROPOSED RETAINING WALL WORKS MUST BE WHOLLY WITHIN THE                THE FOLLOWING INSPECTIONS MUST BE COMPLETED BY RECOR ENGINEERS
6. ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS SHALL                                                                                                    PROPERTY BOUNDARY OF THE SUBJECT SITE, INCLUDING REAR OF
   BE RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS, FOOTPATHS,                            POSTS BARRIER KERB 300 FROM FACE MOUNTABLE KERB 500 FROM FACE                                                                                            BEFORE ENGINEERING CERTIFICATION WILL BE ISSUED. THE CONTRACTOR IS TO
                                                                                         OF KERB.                                                                       RETAINING WALL DRAINAGE INFRASTRUCTURE FOR RETAINING WALLS IN CUT.        PROVIDE A MINIMUM OF 72 HOURS NOTICE TO RECOR FOR REQUIRED
   CONCRETE AREAS, GRAVEL AREAS, GRASSED AREAS AND ROAD PAVEMENTS.                                                                                                      RETAINING WALLS ARE TO BE PREPARED IN ACCORDANCE WITH STRUCTURAL
                                                                                    2.3. PARKING CONTROL SIGNS TO BE MOUNTED TO FACE APPROACHING                                                                                                  INSPECTIONS. SHOULD THE
7. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO                           TRAFFIC AT 45° TO KERB OR CARRIAGEWAY EDGE. ALL OTHER SIGNS TO                 ENGINEERS SPECIFICATIONS, AND IN CONFORMANCE WITH CONSTRUCTION
   AUTHORITY/COUNCIL'S INFRASTRUCTURE. SUCH REPAIR OR REINSTATEMENT                                                                                                     REQUIREMENTS OF GEOTECHNICAL REPORT.                                      CONTRACTOR FAIL TO REQUEST AN INSPECTION, THE CONTRACTOR WILL BE
                                                                                         BE TURNED AWAY BY 5° FROM THE NORMAL TO APPROACHING                                                                                                      RESPONSIBLE FOR ALL COSTS TO ALLOW FOR THE WORKS TO BE INSPECTED TO
   TO BE CARRIED OUT IMMEDIATELY TO THE SATISFACTION OF                                  HEADLIGHT.                                                                 9. REFER ARCHITECT/LANDSCAPE ARCHITECT DRAWINGS FOR CONFIRMATION
   INFRASTRUCTURE OWNER/MANAGER / AUTHORITY/COUNCIL.                                                                                                                    OF RETAINING WALL COLOUR AND FINISH.                                      THE SATISFACTION OF RECOR. ANY INSPECTIONS THAT FAIL ARE TO BE
                                                                                  3. SIGN SUPPORTS                                                                                                                                                RE-INSPECTED WITH ALL REINSPECTION COSTS TO BE PAID BY THE CONTRACTOR.
8. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL                         3.1.  SLEEVED SIGNS SUPPORTS ARE TO BE PROVIDED IN ALL AREAS WHERE              10. ALL EARTHWORKS OPERATIONS SHALL BE CARRIED OUT WITH 'LEVEL 2' SOIL
   WORKPLACE HEALTH AND SAFETY REQUIREMENTS.                                             THEY ARE IN A PAVED SURFACE.                                                   ENGINEERING SUPERVISION IN ACCORDANCE WITH APPENDIX B OF AS 3798.         a. PRESTART
                                                                                  4. LINEMARKING                                                                        THE NOMINATED GEOTECHNICAL TESTING AUTHORITY SHALL PROVIDE                b. EARTHWORKS - FINAL STRIPPING OF TOPSOIL, INSTALLATION OF SEDIMENT
9. WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN CLOSE                                                                                                        CERTIFICATION THAT ALL GENERAL EARTHWORKS OPERATIONS HAVE BEEN
   PROXIMITY TO NEIGHBOURING LOT BOUNDARIES OR INFRASTRUCTURE,                      4.1. REDUNDANT LINEMARKING IS TO BE GROUND OFF.                                                                                                                  AND EROSION CONTROL MEASURES UNSUITABLE GROUND
                                                                                                                                                                        CARRIED OUT IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS
   CONTRACTOR TO ALLOW IN SCOPE OF WORKS TO PROVIDE ALL MEASURES                    4.2. THERMOPLASTIC LINEMARKING TO BE USED FOR ALL CONCRETE.                         AND THE CONTROLLED FILL IS SUITABLE FOR PURPOSE TO THE REQUIRED           c. SIDE AND CUT OFF DRAINS
   NECESSARY TO ENSURE THE INTEGRITY OF EXISTING BOUNDARIES AND                                                                                                         BEARING CAPACITY UNDER THE PLATFORM/STRUCTURES AS SPECIFIED BY
   INFRASTRUCTURE. THIS MAY INCLUDE THE USE OF LOW VIBRATION                                                                                                                                                                                      d. STORMWATER PIPE LAID ON BEDDING PRIOR TO BACKFILL
   EQUIPMENT, TRENCH SHORING ETC AS REQUIRED.
                                                                                  JOINTING NOTES                                                                        THE GEOTECHNICAL REPORT.
                                                                                                                                                                                                                                                  e. STORMWATER TRENCH BACKFILLED PRIOR TO PAVEMENT PLACEMENT
                                                                                                                                                                    11. ALL EARTHWORKS FILL AND EXCAVATED AREAS SHALL BE COMPACTED TO
10. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THESE                1. ALL JOINTING AND CONCRETE TO BE IN ACCORDANCE WITH THE                             98% STANDARD MAXIMUM DRY DENSITY OR A DRY DENSITY INDEX OF AT             f.    STORMWATER STRUCTURE BASE SLABS
    DRAWINGS, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN                  REQUIREMENTS OF AS3727.1:2016.                                                     LEAST 75% IN ACCORDANCE WITH THE GEOTECHNICAL REPORT IN LAYERS OF         g. SEWER RETICULATION
    CONFIRMATION THAT WORKS CAN COMMENCE.                                         2. SAW CUT JOINTS MUST BE:                                                            250MM LOOSE THICKNESS (PRIOR TO COMPACTION).
                                                                                                                                                                    12. COMPACTION TESTING TO BE CARRIED OUT AT A MINIMUM OF TWO TESTS            h. WATER RETICULATION
                                                                                             BETWEEN1 AND1 OF CONCRETE PAVEMENT DEPTHS.
11. CONTRACTOR TO PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL
    CONSTRUCTED WORKS IN ACCORDANCE WITH LOCAL GOVERNMENT                          2.1.                                                                                 PER VERTICAL LIFT WHERE STRUCTURAL FILL HEIGHTS EXCEED 300MM IN           i.    PAVEMENT SUBGRADE
    REQUIREMENTS. UNLESS OTHERWISE ADVISED BY RECOR CONTRACTOR TO                                   4 3                                                                 ACCORDANCE WITH AS3798. CONTRACTOR TO UNDERTAKE ALL
                                                                                   2.2. CLEARED OF ANY DEBRIS FROM THE CUTTING METHOD.                                  EARTHWORKS TESTING IN ACCORDANCE WITH GEOTECHNICAL ENGINEER                j.   PAVEMENT REINFORCING
    NOTE COUNCILS ADAC REQUIREMENTS.
                                                                                   2.3. PERFORMED WITHIN 6 TO 12 HOURS OF FINISHING CONCRETE POURS.                     AND LOCAL AUTHORITY REQUIREMENTS.                                         k. PAVEMENT PRIOR TO SEALING (PRESEAL)
12. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH RELEVANT                 3. DOWELL BARS MUST BE INSTALLED EXACTLY 90° TO THE FACE OF JOINT TO              13. FINISHED SURFACES TO ALL DISTURBED AREAS ARE TO BE TREATED IN
    APPROVALS.                                                                                                                                                                                                                                    l.    RETAINING WALL FOOTING REINFORCING
                                                                                      ALLOW EXPANSION AND CONTRACTION MOVEMENTS.                                        ACCORDANCE WITH LANDSCAPE DRAWINGS.
13. CONTRACTOR TO ALLOW TO LIASE/CO-ORDINATE WITH ELECTRICAL,                     4. JOINTING LAYOUT TO BE CONFIRMED BY SUPERINTENDANT PRIOR TO                     14. ALL NEW WORKS TO MATCH NEATLY INTO EXISTING LEVELS.                       m. RETAINING WALL BLOCKWORK PRIOR TO CORE FILL
    LANDSCAPE AND OTHER SERVICE CONTRACTORS THROUGHOUT CIVIL                          CONSTRUCTION COMMENCING. LAYOUT SHOULD AVOID ACUTE ANGLES IN                  15. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH APPROVED                   n. STEEL REINFORCEMENT OF CONCRETE STRUCTURES
    CONSTRUCTION.                                                                     THE CONCRETE SLAB AND AVOID MISMATCHED JOINTS.                                    MANAGEMENT PLANS.
                                                                                  5. JOINT SEALANTS WHERE USED MUST ADHERE TO SIDE OF JOINT FACES ONLY                                                                                            o. PRACTICAL COMPLETION
14. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR DEMOLITION                                                                                                  16. CONTRACTOR TO ENSURE SUITABLE EROSION CONTROL MEASURES ARE
    WORKS COMMENCING ON SITE.                                                         AND SHALL NOT EXTEND ABOVE SIDES OF JOINTS ONTO THE SLAB SURFACE.                 INSTALLED INCLUDING BUT NOT LIMITED TO SHAKE DOWNS, SILT FENCE ETC        p. ON MAINTENANCE
                                                                                  6. DOWEL BARS ARE TO BE                                                               IN ACCORDANCE WITH EROSION AND SEDIMENT CONTROL PLAN.                     q. OFF MAINTENANCE
15. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS
    AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O.                 6.1. FOR 100MM THICK SLAB, 12MM Ø OF LENGTH 300MM AND SPACED AT                  17. ADEQUATE SAFETY FENCING/BARRIERS TO BE APPLIED TO ALL BATTERS OR
                                                                                         400MM CENTRES                                                                  RETAINING WALLS (TEMPORARY OR PERMANENT) AS PER RELEVANT                  r.    ANY OTHER INSPECTION AS SPECIFIED BY LOCAL COUNCIL (REFER
16. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING                                                                                                           AUSTRALIAN STANDARDS AND LEGISLATION.                                           DEVELOPMENT APPROVAL)
                                                                                   6.2. FOR 125MM THICK SLAB, 16MM Ø OF LENGTH 350MM AND SPACED AT
    PROPERTIES AND COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT                        300MM CENTRES                                                              18. DUST CONTROL MEASURES ARE TO INCLUDE SPRAYING WATER ON UNPAVED            s.    ANY OTHER INSPECTION AS REQUIRED BY UNITY WATER AND WHERE
    OF ANY WORKS ON SITE.                                                          6.3. FOR 150MM THICK SLAB, 20MM Ø OF LENGTH 400MM AND SPACED AT                      ROADS, ACCESS TRACKS AND STOCKPILES AT A SUFFICIENT LEVEL TO                    RELEVANT TO THEIR CERTIFICATION SCHEME
17. CONTRACTOR TO CLEAR AND GRUB ALL VEGETATION ON SITE AS IDENTIFIED                    300MM CENTRES                                                                  SUPPRESS DUST GENERATION. ADDITIONALLY CONTRACTORS ARE TO COVER
    IN THE APPROVED VEGETATION MANAGEMENT PLAN. CONTRACTOR TO                                                                                                           OR ENCLOSE STOCKPILES WHERE REASONABLY PRACTICAL TO RESTRICT
    ENSURE ALL TREE ROOTS AND STUMPS ARE COMPLETELY REMOVED AND                                                                                                         DUST MOVEMENT.
    BACKFILLED TO LEVEL 1 SUPERVISION. CONTRACTOR TO ALLOW TO MULCH
                                                                                  EARTHWORKS NOTES                                                                  19. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THIS
    ALL CLEARED VEGETATION AND STOCKPILE ON SITE OR REMOVE FROM SITE              1.    FOR DETAILED GEOTECHNICAL INFORMATION, REFER GEOTECHNICAL                       DRAWING, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN
    AS DIRECTED.                                                                        INVESTIGATION REPORT BY GEOTECHNICAL ENGINEER. IT IS RECOMMENDED




                                                                                                          CLIENT DETAILS:                                     PROJECT ADDRESS:                                  APPROVED BY:                  PROJECT NAME:

                                                                                                                                                                                                                                              3 DELORME STREET, NOOSA HEADS
                                                                                                                                                                                                                                              TITLE:                                 STATUS:
                                                                                                                            CAPITAL PRUDENTIAL
                                                                                                                                                                                                                                              GENERAL NOTES                          FOR APPROVAL
                                                                                                                                                               3 DELORME STREET, NOOSA HEADS
         © ABN 89 647 469 707                                                                                                                                                                                            JARO BAULEKA                                                NOT FOR CONSTRUCTION
           75 NOOSA DRIVE                                                                                                                                                                                                 RPEQ: 20693
                                       01   26/08/222   ISSUED FOR APPROVAL            MVP    JAC   JB    SCALE:
        NOOSA HEADS, QLD 4567
                                      REV    DATE               DESCRIPTION            DWN   CHK    APP                                                                                                                                       DRAWING NUMBER:                        PROJECT NUMBER:                SHEET REV:
            +61 7 5211 1003
                                                                                                                                AS INDICATED                                                                             DATE: 26/08/22                                                                              SIZE:
       RECORCONSULTING.COM                                            REVISIONS
                                                                                                                              DO NOT SCALE, IF IN DOUBT ASK
                                                                                                                                                                                                                                              002                                    20220198                       A1 01
Log in to download the original file

20220198 3 Delorme St Civil OPW.pdf · 9.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.