20220198 3 Delorme St Civil OPW

Attached to the e-mail MCU22/0158, OPW22/0228, RAL22/0022 - Response to Further Advice 9_12_22 - RE_ Information Response - 3 Delorme St Noosa Heads.

of 20

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 8, section 1. The text section number identifies this passage in the reader.

                                                                                                                                    1 METER MAX.              STAR PICKETS
                                           PROVIDE WASH WATER FOR                                                                                             DROP INLET
TIMBER SLEEPER OR METAL                                                                                                                                       WITH GRATE
                                           TRUCKS EXITING SITE
GRID 100mm HIGH AND                                                                                                                                           WIRE OR STEEL MESH
SPACED AT 300mm CTS                          MIN LEN                                                                                                          (14 GAUGE x 150mm                                                                                            WRAP FILTER
                                                    GTH 10m
                                                                              BERM 300 HIGH MIN                                                               OPENINGS) WHERE GEOTEXTILE                                                                                   CLOTH OVER GRATE
  CONSTRUCTION SITE                                                                                                                                           IS NOT SELF-SUPPORTING
                                                                                                                                                              WOVEN GEOTEXTILE                                                                                                                                                                                             1.5m STAR
                                                                                  EXISTING ROADWAY                                                                                                                                                                                                                                                                         PICKETS
                                                                                                                                                                                                                                                                                                                                                                           AT MAX. 2.5m CENTRES




                                                                                                                                                                                                                                                                                                                                    500 - 600mm
 GEOTEXTILE FABRIC                                                                                                                                       STAR PICKET                                                                                                                                                                                                   SELF-SUPPORTING
                                                                                                                                                         FITTED WITH                                                                                                                                                                                                   GEOTEXTILE
                                       50-75mm GRAVEL BED                                                                                                SAFETY CAP                                                                                                                                                                                                                 OW
                                       MIN 200mm THICK                                                                                                                                                                                                                                                                                                              DIRECTION OF FL
                RUNOFF FROM PAD DIRECTED                                                             SANDBAGS                                      WOVEN GEOTEXTILE




                                                                                                                                                                                                                                                                                                                                    600mm MIN.
                TO SEDIMENT TRAP
                                                                                                                                                            RUNOFF                                                                         WRAP FILTER
                                                                                                                                                                                                                     RUNOFF                                                                                                                                           ON SOIL, 150mm x 100mm
          TEMPORARY CONSTRUCTION VEHICLE EXIT                                                                                                                                                                                              CLOTH OVER GRATE




                                                                                                                             FLOW
                                                                                                                                                            WATER WITH
                                                                                                                                                                                                                     WATER WITH                                                                                                                                       TRENCH WITH
                                  SCALE: N.T.S.                                                      WATERWAY                                               SEDIMENT
                                                                                                                                                                                                                     SEDIMENT                                                                                                                                         COMPACTED BACKFILL
                                                                                                                                                                                                                                                                                                                                                                      AND ON ROCK, SET INTO
                                                                                                     EXCAVATION                                                                                                                                                                                                                                                       SURFACE CONCRETE
                                                                                                                                                                                                                                                         FILTERED                                                                                        SECTION DETAIL
                                                                                                                                                                                      FILTERED
                                                                                                                                                                                       WATER                                                              WATER
                                                                                                                                         GEOTEXTILE
                                                                                                     EARTH BANK                          EMBEDDED 150mm
                                                                                                                                         INTO GROUND                                                                                                                                                                                                            20m MAX.




                                                                                                                                                                                                                                                                                                                MIN. 1.5m
                                                                                                                                  FOR DROP INLETS AT NON-SAG POINTS,                                                        GEOTEXTILE INLET FILTER TYPE B                                                                                                                    FLOW
                                                                                                                                  SANDBAGS, EARTH BANK OR EXCAVATION                                                                            SCALE N.T.S
                                                                                                                                  USED TO CREATE ARTIFICIAL SAG POINT                                                                                                                                                                        STAR PICKETS AT
                                                                                                                                                                                                                                                                                                                                             MAX. 2.5m SPACINGS
                                                                                                      GEOTEXTILE INLET FILTER CONSTRUCTION NOTES:                                                                                                                                                                                            TYPICAL
                                                                                                      1. FABRICATE A SEDIMENT BARRIER MADE FROM GEOTEXTILE OR STRAW BALES.

                                                                                                      2.   PICKET SPACING TO BE A MAXIMUM 1.0m CENTRES.                                                                                                                                                                                                          PLAN

                                                                                                      3.   IN WATERWAYS, ARTIFICIAL SAG POINTS CAN BE CREATED WITH SANDBAGS
                                                                                                           OR EARTH BANKS AS SHOWN IN THE DRAWING.

                                                                                                      4.   DO NOT COVER THE INLET WITH GEOTEXTILES UNLESS THE DESIGN IS                                                                                                                                                                                               DIRECTION
                                                                                                           ADEQUATE TO ALLOW FOR ALL WATERS TO BYPASS IT.                                                                                                                                                                                         DISTURBED                            1.5m STAR PICKETS
                                                                                                                                                                                                                                                                                                                                                  AREA                OF FLOW          AT MAX. 2.5m
                                                                                                                  GEOTEXTILE INLET FILTER A                                                                                                                                                                                                                                            CENTRES
                                                                                                                                          SCALE N.T.S

                 TIMBER SPACER                    KERB-SIDE
                 TO SUIT                          INLET



                                                                                                                                                                                                                                                                                                                                                  UNDISTURBED
                                                                                                                                                                                                                                                                                                                                                  AREAS

                                                 GRAVEL-FILLED WIRE
                                                 MESH OR GEOTEXTILE
                                                 "SAUSAGE"
                           OVERFLOW        TIMBER SPACER
 RUNOFF                                                                                                           GRADIENT OF
 WATER WITH                                TO SUIT                                                                                                         CAN BE CONSTRUCTED         ALL BATTER
                                                                                                                  DRAIN 1% TO 5%
 SEDIMENT                                                                                                                                                  WITH OR WITHOUT            GRADES 2(H):1(V)
                                                                                                                                                           CHANNEL                    MAX.                                                                                                                 SEDIMENT FENCE CONSTRUCTION NOTES:
                                                                                                                                                                                                                                                              STABILISE STOCKPILE SURFACE                  1. CONSTRUCT SEDIMENT FENCES AS CLOSE AS POSSIBLE TO BEING PARALLEL
                                                                                                                  DIRECTION O
                                                                                                                                           F FLOW                                                             EARTH BANK                                                                                       TO THE CONTOURS OF THE SITE, BUT WITH SMALL RETURNS AS SHOWN IN THE
                                                                                                                                                                                                                                                  AX.)      2:1
                                                                                                                                                                                                                                                                  SLO




                                                                                                                                                                                          300mm MIN.
    SEDIMENT
                                                                                                                                                                                                                                            PE (M                    PE
                                                                                                                                                                                                                                                                                                               DRAWING TO LIMIT THE CATCHMENT AREA OF ANY ONE SECTION. THE
                                             FILTERED WATER
                                                                                                                                                                                                                     FLOW               SLO                               (MA                                  CATCHMENT AREA SHOULD BE SMALL ENOUGH TO LIMIT WATER FLOW IF
     GRAVEL-FILLED WIRE                                                                                                                                                                                                           2:1                                        X.)                               CONCENTRATED AT ONE POINT TO 50 LITRES PER SECOND IN THE DESIGN
     MESH OR GEOTEXTILE                                                                                                                                                                                                                                                                                        STORM EVENT, USUALLY THE 10-YEAR EVENT.
                                                                                                                                                               2m MIN
     "SAUSAGE"
                                                                                                                        150mm MIN




     MESH & GRAVEL INLET FILTER CONSTRUCTION NOTES:                                                                               NOTE: ONLY TO BE USED AS TEMPORARY                                                                                      SEDIMENT FENCE                                   2.               CUT A 150mm DEEP TRENCH ALONG THE UPSLOPE LINE OF THE FENCE FOR
     1. INSTALL FILTERS TO KERB INLETS ONLY AT SAG POINTS.                                                                        BANK WHERE MAXIMUM UPSLOPE LENGTH                                                                                                                                                         THE BOTTOM OF THE FABRIC TO BE ENTRENCHED.
                                                                                                                                  IS 80 METRES.
                                                                                                                                                                                                                STOCKPILE CONSTRUCTION NOTES:                                                              3.               DRIVE 1.5m LONG STAR PICKETS INTO GROUND AT 2.5m INTERVALS (MAX.) AT
     2.   FABRICATE A SLEEVE MADE FROM GEOTEXTILE OR WIRE MESH LONGER THAN                                        DIVERSION DRAIN CONSTRUCTION NOTES:
          THE LENGTH OF THE INLET PIT AND FILL IT WITH 25mm TO 50mm GRAVEL.                                                                                                                                     1. PLACE STOCKPILES MORE THAN 2 (PREFERABLY 5) METRES FROM EXISTING                                         THE DOWNSLOPE EDGE OF THE TRENCH. ENSURE ANY STAR PICKETS ARE
                                                                                                                  1. BUILD WITH GRADIENTS BETWEEN 1% AND 5%.
                                                                                                                                                                                                                   VEGETATION, CONCENTRATED WATER FLOW, ROADS AND HAZARD AREAS.                                             FITTED WITH SAFETY CAPS.
     3.   FORM AN ELLIPTICAL CROSS-SECTION ABOUT 150mm HIGH x 400mm WIDE.                                         2.     AVOID REMOVING TREES AND SHRUBS IF POSSIBLE - WORK AROUND THEM.
                                                                                                                                                                                                                2.    CONSTRUCT ON THE CONTOUR AS LOW, FLAT, ELONGATED MOUNDS.                             4.               FIX SELF-SUPPORTING GEOTEXTILE TO THE UPSLOPE SIDE OF THE POSTS
     4.   PLACE THE FILTER AT THE OPENING LEAVING AT LEAST A 100mm SPACE                                          3.    ENSURE THE STRUCTURES ARE FREE OF PROJECTIONS OR OTHER                                                                                                                                              ENSURING IT GOES TO THE BASE OF THE TRENCH. FIX THE GEOTEXTILE WITH
          BETWEEN IT AND THE KERB INLET. MAINTAIN THE OPENING WITH SPACER                                                                                                                                       3.    WHERE THERE IS SUFFICIENT AREA, TOPSOIL STOCKPILES SHALL BE LESS                                      WIRE TIES OR AS RECOMMENDED BY THE MANUFACTURER. ONLY USE
                                                                                                                        IRREGULARITIES THAT COULD IMPEDE WATER FLOW.
          BLOCKS.                                                                                                                                                                                                     THAN 2 METRES IN HEIGHT.                                                                              GEOTEXTILE SPECIFICALLY PRODUCED FOR SEDIMENT FENCING. THE USE OF
                                                                                                                  4.    BUILD THE DRAINS WITH CIRCULAR, PARABOLIC OR TRAPEZOIDAL                                                                                                                                            SHADE CLOTH FOR THIS PURPOSE IS NOT SATISFACTORY.
     5.   FORM A SEAL WITH THE KERB TO PREVENT SEDIMENT BYPASSING THE FILTER.                                                                                                                                   4.    WHERE THEY ARE TO BE PLACE FOR MORE THAN 10 DAYS, STABILISE
                                                                                                                        CROSS-SECTIONS, NOT "V" SHAPED.
                                                                                                                                                                                                                      FOLLOWING THE APPROVED ESCP OR SWMP TO REDUCE THE C-FACTOR TO                        5.               JOIN SECTIONS OF FABRIC AT A SUPPORT POST WITH A 150mm OVERLAP.
     6.   SANDBAGS FILLED WITH GRAVEL CAN SUBSTITUTE FOR THE MESH OR                                                                                                                                                  LESS THAN 0.10.
                                                                                                                  5.    ENSURE BANKS ARE PROPERLY COMPACTED TO PREVENT FAILURE.
          GEOTEXTILE PROVIDING THEY ARE PLACED SO THAT THEY CAN FIRMLY ABUT                                                                                                                                                                                                                                6.               BACKFILL THE TRENCH OVER THE BASE OF THE FABRIC AND COMPACT IT
          EACH OTHER AND SEDIMENT-LADEN WATERS CANNOT PASS BETWEEN.                                                                                                                                             5.    CONSTRUCT EARTH BANKS ON THE UPSLOPE SIDE TO DIVERT WATER AROUND                                      THOROUGHLY OVER THE GEOTEXTILE.
                                                                                                                  6.    COMPLETE PERMANENT OR TEMPORARY STABILISATION WITHIN 10 DAYS OF
                                                                                                                                                                                                                      STOCKPILES AND SEDIMENT FENCES 1 TO 2 METRES DOWNSLOPE.
                                                                                                                        CONSTRUCTION.
                   MESH & GRAVEL INLET FILTER                                                                                                      DIVERSION DRAIN                                                                                STOCKPILES                                                                                         SEDIMENT FENCE
                                  SCALE N.T.S                                                                                                            SCALE N.T.S                                                                                     SCALE N.T.S                                                                                       SCALE: N.T.S.




                                                                                                                                      CLIENT DETAILS:                                                    PROJECT ADDRESS:                                                          APPROVED BY:                                   PROJECT NAME:

                                                                                                                                                                                                                                                                                                                                  3 DELORME STREET, NOOSA HEADS
                                                                                                                                                                                                                                                                                                                                  TITLE:                                                   STATUS:
                                                                                                                                                        CAPITAL PRUDENTIAL
                                                                                                                                                                                                                                                                                                                                  EROSION SEDIMENT                                        FOR APPROVAL
                                                                                                                                                                                                          3 DELORME STREET, NOOSA HEADS
           © ABN 89 647 469 707                                                                                                                                                                                                                                                               JARO BAULEKA                        CONTROL DETAILS                                         NOT FOR CONSTRUCTION
             75 NOOSA DRIVE                                                                                                                                                                                                                                                                    RPEQ: 20693
                                                       01   26/08/222   ISSUED FOR APPROVAL          MVP    JAC        JB             SCALE:
          NOOSA HEADS, QLD 4567
                                                  REV        DATE               DESCRIPTION          DWN    CHK        APP                                                                                                                                                                                                        DRAWING NUMBER:                                          PROJECT NUMBER:   SHEET REV:
              +61 7 5211 1003
                                                                                                                                                            AS INDICATED                                                                                                                      DATE: 26/08/22                                                                                                  SIZE:
          RECORCONSULTING.COM                                                         REVISIONS
                                                                                                                                                          DO NOT SCALE, IF IN DOUBT ASK
                                                                                                                                                                                                                                                                                                                                  031                                                      20220198          A1 01
Log in to download the original file

20220198 3 Delorme St Civil OPW.pdf · 9.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.