Original source · versioned page text
Decision Notice - Approved by Delegation of Authority MCU21 0190
Officer: Lisa Pienaar Direct Telephone: 07 53296514 Our Reference: MCU21/0190 Your Reference: 21-7662 30 November 2022 Hanifin Education Management ATF The Hanifin Family Trust C/- Urban Strategies P/L PO Box 3368 SOUTH BRISBANE QLD 4101 [email protected] Dear Sir/Madam, Decision Notice Planning Act 2016 I refer to your application and advise that on 28 November 2022, Council decided to approve the application, subject to conditions. Details of the decision are as follows: application details Application No: MCU21/0190 Street address: 65 & 67 Elanda St Sunshine Beach Real property description: Lot 410 RP 48112, Lot 411 RP 48112 Planning Scheme: Noosa Plan 2020 (25 September 2020) Decision details Council decided to issue the following type of approval: Development Permit for Material Change of Use - Multiple dwelling Development Permit for Building Work - Demolition of Dwelling CURRENCY PERIOD of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions PLANNING When Conditions must be Complied With Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date Sheet 01 of 17 I Cover Page, prepared by Invilla Designs 02.11.2022 Sheet 03 of 17 J Site Plan, prepared by Invilla Designs 02.11.2022 Sheet 04 of 17 J Areas Plan, prepared by Invilla Designs 02.11.2022 Sheet 04A of 17 J GFA Plan, prepared by Invilla Designs 02.11.2022 Sheet 05 of 17 J Ground Floor Plan, prepared by Invilla Designs 02.11.2022 Sheet 06 of 17 J First Floor Plan, prepared by Invilla Designs 02.11.2022 Sheet 07 of 17 J Second Floor Plan, prepared by Invilla Designs 02.11.2022 Sheet 08 of 17 J Roof Terrace, prepared by Invilla Designs 02.11.2022 Sheet 09 of 17 J Roof Plan, prepared by Invilla Designs 02.11.2022 Sheet 10 of 17 J Elevations Plan (west/north), prepared by Invilla Designs 02.11.2022 Sheet 11 of 17 J Elevations Plan (east/south), prepared by Invilla Designs 02.11.2022 Sheet 12 of 17 J Sections, prepared by Invilla Designs 02.11.2022 Sheet 13 of 17 J Sections, prepared by Invilla Designs 02.11.2022 Sheet 17 of 17 J Front Fence Elevation, prepared by Invilla Designs 02.11.2022 Currency Period This development approval lapses if the use has not happened by 28 November 2028, unless an application to extend the currency period is approved by Council. Performance Bond Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Operational Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. Building Height The maximum height of the development must not exceed 12 metres above the finished ground level and the natural ground level. Certification must be submitted to Council from a Licensed Surveyor which certifies that the buildings do not exceed the maximum height requirement of this Decision Notice. Building Appearance All air conditioning units or other mechanical equipment must be located at ground level, or otherwise fully enclosed or screened such that they are not visible from the street frontages nor adjoining properties. All deck and balcony areas above ground floor must not be enclosed by permanent fixtures such as shutters, louvres, glass panelling or the like. At least one of the four (4) Multiple Dwelling units is to be: accessible by a safe, continuous and step free path of travel from the street entrance of the property or from a car parking space; has a step-free entrance door with opening width of at least 820 millimetres; and contains a bathroom on the entry level. Protection of Privacy The eastern balconies located on the eastern building face of Units H1 & H4 must include either balcony planter boxes or balustrading positioned in such a way to obscure direct views into the habitable room windows or private open space areas of the adjoining property. Fencing and Walls Any street fencing must be set back an average of 1 metre from the front property boundary. Any fencing on the front boundary must either: not exceed a maximum height of 1.2m be of open construction. The area of land between the fence and the front property boundary must be densely landscaped to screen any fencing from the street. Clothes Drying Areas Each dwelling unit must be provided with access to an outdoor clothesline which is screened from public view. Gatehouse The proposed gatehouse must not exceed a maximum area of 3m2 (1.5m x 1.5m). The gatehouse must not exceed a maximum vertical height of 2.4m. Land Amalgamation All properties the subject of the development must be amalgamated prior to the issue of the development permit for Operational Works. Rooftop Terraces The proposed rooftop pergolas must not be roofed (must remain permeable) or enclosed as shown on the approved plans. Community Management Statement Any proposed Community Management Statement required for the development pursuant to the Body Corporate and Community Management Act 1997 must be submitted to Council for endorsement at the same time as submission of the Building Format Plan (or similar) to Council for compliance assessment. Street Identification The street address of the development must be clearly visible and discernible from the primary frontage of the site by the provision of a street number and, where appropriate, the building name. Water & Sewer Connections An underground connection to reticulated water and sewerage must be provided to the development site in accordance with the standards and requirements of Northern SEQ Distributor–Retailer Authority (Unitywater). A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater) must be submitted to Council that certifies an underground connection to reticulated water and sewerage has been provided to the development site. DEMOLITION Performance Bond Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be submitted to Council prior to the issue of a Development Permit for Building Works for demolition, to secure the demolition conditions of this approval. The cash bond or trading bank guarantee will be returned on performance of the demolition conditions of this approval less any costs incurred by Council in respect of enforcing performance of these demolition conditions. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. Works Demolition must be undertaken in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions in accordance with the nuisance provisions of the Environmental Protection Act 1994. Waste management A Waste Management Plan (demolition) must be submitted in accordance with Planning Scheme Policy PSP10 - Waste Management and approved by Council’s Waste Coordinator prior to issue of a development permit for Building Works for demolition, removal or relocation. The purpose of the Waste Management Plan is to facilitate the segregation of waste for the effective reuse and recycling of such materials. Segregated wastes attract significantly reduced disposal fees at the landfill with some items free. Higher gate fees are charged for mixed waste. Waste storage areas must provide for adequate separation of all reusable, recyclable and waste materials. These must be located so that they are convenient and safe to use. The Plan must contain the following information: The areas for the storage and separation of waste shown on a site plan; A waste management table as indicated below is to be completed showing how waste material is to be segregated - recycled – reused or disposed; and Table – Waste Management Table MATERIALS ON-SITE DESTINATION Re-use and Recycling Disposal Expected waste materials Estimated volume(m³) On-site *specify proposed re-use or on-site recycling methods Off-site *specify contractor and recycling outlet *specify contractor and landfill site or other disposal site Excavation material Green waste Bricks Concrete Timber-please specify Plasterboard Metals - please specify Asbestos Other - please specify Note * If a demolition contractor is undertaking works, then the Waste Management table is to be completed by the demolition contractor. Damage to infrastructure Any damage to footpaths, street plantings, natural vegetation/trees kerb and channel, bridges or roadways must be repaired or reinstated to at least pre-existing conditions. Vacant site The site must be left clean and tidy free from debris such as concrete, wire, rubble, brick/s and the like. If the site remains vacant for more than 30 days the lot/s must be turfed or landscaped in accordance with Planning Scheme Policy PSP 2 – Landscaping and to the satisfaction of Council so as to not cause nuisance to the surrounding area. All waste materials must be removed from site. Litter, erosion and sediment control Litter, erosion and sediment control measures must be installed and maintained until soils are stabilised by turf, vegetation or sealed. Note: it is an offence under the Environmental Protection Act 1994 to deposit or potentially allow litter, waste, soil, or other contaminants to enter a waterway or storm water drainage system (e.g. roadside gutter). Asbestos Removal of building materials containing asbestos must be undertaken by a licensed asbestos removalist. Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011 requires a licensed asbestos removalist to give notice to Workplace Health and Safety Queensland (WHSQ) of licensed asbestos removal work at least five days before the work commences. Notification must be made using Form 65: Notification of licensed asbestos removal work, demolition work or emergency demolition. All building materials containing asbestos products are wrapped and disposed of in accordance with the Public Health Regulation 2006 and the Environmental Protection Regulation 2008. Note: Asbestos is a Regulated Waste. The Department of Environment & Science licenses businesses that transport asbestos waste, and landfills that accept this waste. All building materials containing asbestos, including asbestos cement sheeting or roofing and lagging are removed from the building prior to demolition/relocation. Plumbing and Drainage It is a requirement of the ‘Standard Plumbing and Drainage Regulation 2019’ that at demolition of a building, the existing sanitary drain upstream from the connection point for a service provider’s sewerage system must be sealed water tight. This work is deemed as notifiable Work and must be carried out by a suitably licenced plumber who must submit an As Constructed plan and Form 4 (Notifiable Works Form) to the QBCC (Queensland Building Construction Commission) within 10 days of completing the work. STORMWATER The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. The works must be undertaken in accordance with an Operational Works approval, AS/NZS3500.3 and the Queensland Urban Drainage Manual, and must include in particular: Discharge of roofwater to Elanda Street kerb and channel. Any stormwater pits within the site which function under pressure are to be sealed to prevent surcharge from the roofwater system. Frontage works are to be provided to facilitate the disposal of site stormwater and connection to the trunk drainage network and are to include kerb and channel for the full site frontage and to existing kerb and channel in Pacific Ave and provision of a side-entry pit and piped connection at the intersection, upstream of future kerb-ramp alignment. Provision of 3kL roofwater storage tanks for each unit, connected to at least 50% of the roof area and with the water captured to be plumbed for irrigation of garden beds at the site. A system for collection and disposal of driveway runoff, to prevent ingress to the garages, is to be provided. Details of the drainage of both driveway and landscaped areas is to be provided with the application for Operational Works approval and is to incorporate both the infiltration of low flows and the replication of existing discharge patterns for surface flows leaving the site. A revised detention analysis is to be provide examining flows discharging East and is to determine whether detention is required for this discharge point based on not increasing peak flows in this direction. d. Condition 33 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk infrastructure. Landscaping Works The development site must be landscaped. The works must be undertaken in accordance with an Operational Works approval and the Noosa Plan PSP2 – Landscaping for that specific area and must include in particular: the works shown on the submitted landscape plans prepared by Openspace Architecture (20-00902-CS01, 20-00902-LP01-05, version D, dated 03/08/2022), with the following amendments: Front fences or walls must be set back an average of 1 metre and articulated, stepping the design at a maximum of 5m intervals. An average 1 metre wide landscaping strip along the Elanda Street road frontage exclusive of the access driveway and generally uncompromised by infrastructure items. Provision of 4 x 45 litre street trees. Substitution of the following species with appropriate species that meet PSP2 – Landscaping policy or endemic to Noosa: Archontophoenix cunninghamiana (palms not supported) Ptychosperma elegans (palms not supported) Randia fitzalanii (not endemic to Noosa) Alpinia zerumbet (non-native) Carissa ‘Desert Star’ (non-native) Cordyline hybrids (non-native) Heliconia psittacorum ‘Sassy’ (non-native) Hibiscus rosa-sinensis (non-native) Monstera deliciosa (non-native) Doodia aspera (not endemic to Noosa) Epipremnum aureum (non-native) Liriope ‘Stripey White’ and ‘Evergreen Giant’ (non-native) Neoregelia ‘Bossa Nova’ (non-native) Philodendron ‘Xanadu’ (non-native) Ficus pumila (non-native) Crassula ovata ‘Red Edge’ (non-native) Senecia ‘Blue Chalk Sticks’ (non-native) Rosmarinus ‘Prostratus’ (non-native) No use of synthetic turf. Adequate vegetative screening of tanks. Screening landscaping for side and rear boundaries must include screening plants which grow to a minimum height of 4m at maturity and provided at maximum 1.5m centres. Palms are not permitted to be utilised for screening. Exotic species may be planted around the pool area only but not exceed 25% of the landscaping. Exotic species must not be included as boundary screening plants. Boundaries must be screened with species selected from PSP2 – Landscaping or species endemic to Noosa (palms not permitted to be utilised for screening). All landscape works must be established and maintained in accordance with the approved design for the life of the development, and in a manner that ensures healthy, sustained and vigorous plant growth. All plant material must be allowed to grow to full form and be refurbished when its life expectancy is reached. All landscape works must be maintained generally in accordance with the approved design for the life of the development. ENGINEERING External Works Elanda Street must be upgraded. The works must be undertaken in accordance with an Operational Works approval and must include in particular: construction of kerb and channelling for the length of the frontage to the subject site that is a continuation of the kerb line to the north of the subject site and 8m offset from the kerb and channel on the western side of Elanda Street and underground stormwater drainage to the development side only extension of the kerb and channel to the existing formation in Pacific Avenue including any additional stormwater structures and a connection to Council’s existing drainage system. The final alignment and stormwater structures are to be determined on site with Council’s delegate. widening and sealing of the existing road pavement to the new kerb line construction of a pedestrian footpath in accordance with the conditions of this Decision Notice removal of the existing property access and reinstatement of the verge area to match the balance of the site frontage, including the provision of topsoil and turf where the existing verge is grassed Condition 37 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk infrastructure. Site Access and Driveways Sealed access driveways must be provided from Elanda Street to all parking and manoeuvring areas of the development. The driveways must be located generally in accordance with the approved plans and undertaken in accordance with an Operational Works approval. The works must include in particular driveway crossovers generally in accordance with Council’s Standard Drawings RS-049 and RS-050. Car Parking A minimum of 9 car parking spaces must be provided on the site. The works must be undertaken in accordance with an Operational Works approval and must include in particular: 1 visitor parking space within the total, which are clearly marked for that purpose and accessible at all times for visitor use dimensions, crossfalls and gradients in accordance with Australian Standard AS2890: Parking Facilities All car parking areas and access driveways must be maintained exclusively for vehicle parking and manoeuvring and kept in a tidy and safe condition at all times. Pedestrian and Bicycle Facilities Pedestrian and bicycle facilities must be provided for the development. The works must be undertaken in accordance with an Operational Works approval and must include in particular: a 1.5 wide wide footpath within the road verge for the entire length of the site’s frontage to Elanda Street Condition 41 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk infrastructure. Services Unless otherwise stipulated by telecommunications legislation at the time of construction, the development must be provided with all necessary conduits, pits and pipes to accommodate the future connection of optic fibre technology telecommunications. Certification must be submitted to Council from all relevant service providers (Energex, NBN and Unitywater) which certifies that the development has met the requirements of this Decision Notice and all applicable legislation at the time of construction. Easements Unless otherwise agreed in writing by the relevant service provider, any public or third party infrastructure located on the subject site must be placed within an easement registered against the title of the property. All easements must be designed in accordance with the planning scheme and granted at no cost to the Grantee. Where the Grantee is Council or a service authority, the easement documentation must be in accordance with the Grantee’s standard easement terms. Draft easement documentation must be submitted to Council for endorsement. All works must be kept clear of any existing or proposed easements on the subject land, unless agreed otherwise in writing by the Grantee. Earthworks All earthworks and associated retaining structures/batters, both above and below ground, both temporary and permanent, must be undertaken in accordance with an Operational Works approval, and contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. All retaining walls must be designed and constructed in accordance with the planning scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade safety fence. Damage to Services and Assets Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. referral agencies Not applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: PLANNING Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act. Equitable Access and Facilities The plans for the proposed building work have NOT been assessed for compliance with the requirements of the National Construction Code - Building Code of Australia (Volume 1) as they relate to people with disabilities. Your attention is also directed to the fact that in addition to the requirements of the National Construction Code as they relate to people with disabilities, one or more of the following may impact on the proposed building work: the Disability Discrimination Act 1992 (Commonwealth); the Anti-Discrimination Act 1991 (Queensland); and the Disability (Access to Premises – Buildings) Standards. Development Compliance Inspection Prior to the commencement of the use, please contact Council's Development Assessment Branch to arrange a Development Compliance Inspection. Infrastructure Charges All developments and/or changes to existing developments may require payment of “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue. LANDSCAPING Qualified Person For the purpose of preparing a Landscape Plan, a qualified person is considered to be a landscape architect, landscape designer and/or horticulturist with a minimum of 3 years current experience in the field of landscape design. ENGINEERING Building and Construction Industry (Portable Long Service Leave) Levy The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid. Co-ordination of Operational Works Assessment Additional application fees apply to Operational Work applications where the different aspects of the works are lodged separately. Significant savings in application fees will result if all works are lodged in a single application. Preparation of a Preliminary Construction Management Plan A preliminary Construction Management Plan must be submitted with the Operational Works application and must address the following: traffic management during all aspects of the construction phase including: a Traffic Management Control Plan in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction; maintenance of safe vehicle and pedestrian access for the areas affected by the works during and after daily construction has ceased; proposed fencing to the site during the construction phase of the development; provision for worker car parking maintenance and protection of water quality and existing drainage lines through the construction site, through the implementation of appropriate erosion and sediment control measures works programme identifying key components of the works and their respective durations establishment of a communication protocol with the general public, adjoining owners, and emergency services to advise of agreed construction times, impacts on traffic, services and other relevant issues. Include a post out to the local residents and businesses advising of the proposed development, the expected time frames and the site contact details. Include signage in prominent locations on the boundaries of the site advising of the proposed development, the expected time frames and the site contact details. identification of complaint management procedures including: contact details for the on-site manager dispute resolution procedures details on the location of external dump/fill sites, the haulage route, type of vehicle to be utilised during filling operations and frequency of usage. NB any damage to the existing road system as a result of haulage operations shall be fully repaired at the applicant’s expense; and it is acknowledged that the preliminary Construction Management Plan will be a draft document requiring finalisation upon appointment of the Principal Contractor employed to construct the works and a final document will be required to be submitted at the Pre-Start Meeting for the project. Private Infrastructure All private infrastructure for the development must be designed to meet the planning scheme requirements unless otherwise agreed by the relevant authority property notes Not applicable VARIATION approval details Not applicable. further development permits required Type of Development Permit Required Subject of the required Development Permit Development Permit for Operational Works Access, Frontage works, Stormwater, Drainage work, Earthworks, Landscaping Development Permit for Building Works All building work submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. Yours faithfully, Lisa Pienaar Development Planner Enc: Appeal Rights Infrastructure Charge Notice Approved Plans/Documents Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017 Chapter 6 Dispute resolution Part 1 Appeal rights 229 Appeals to tribunal or P&E Court (1) Schedule 1 of the Planning Act 2016 states – (a) Matters that may be appealed to – (i) either a tribunal or the P&E Court; or (ii) only a tribunal; or (iii) only the P&E Court; and (b) The person- (i) who may appeal a matter (the appellant); and (ii) who is a respondent in an appeal of the matter; and (iii) who is a co-respondent in an appeal of the matter; and (iv) who may elect to be a co-respondent in an appeal of the matter. (2) An appellant may start an appeal within the appeal period. (3) The appeal period is – (a) for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or (b) for an appeal against a deemed refusal – at any time after the deemed refusal happens; or (c) for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or (d) for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or (e) for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or (f) for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person. Note – See the P&E Court Act for the court’s power to extend the appeal period. (4) Each respondent and co-respondent for an appeal may be heard in the appeal. (5) If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal. (6) To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about- (a) the adopted charge itself; or (b) for a decision about an offset or refund- (i) the establishment cost of trunk infrastructure identified in a LGIP; or (ii) the cost of infrastructure decided using the method included in the local government’s charges resolution. 230 Notice of appeal (1) An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that- (a) is in the approved form; and (b) succinctly states the grounds of the appeal. (2) The notice of appeal must be accompanied by the required fee. (3) The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to – (a) the respondent for the appeal; and (b) each co-respondent for the appeal; and (c) for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and (d) for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and (e) each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and (f) for an appeal to the P&E Court – the chief executive; and (g) for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate. (4) The service period is – (a) if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or (b) otherwise – 10 business days after the appeal is started. (5) A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6). (6) A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person. 231 Other appeals (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable. (2) The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error. (3) A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter. (4) In this section – decision includes- (a) conduct engaged in for the purpose of making a decision; and (b) other conduct that relates to the making of a decision; and (c) the making of a decision or failure to make a decision; and (d) a purported decision; and (e) a deemed refusal. non-appealable, for a decision or matter, means the decision or matter- (a) is final and conclusive; and (b) may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and (c) is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground. 232 Rules of the P&E Court (1) A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal. (2) However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court [word/footer1.xml] Page 4 of 4 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 4 [Attachment: image3.png (image text)] ee) NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.