Skip to the record
Every meeting, every word.

Original source · versioned page text

2018-04-16 General Committee Agenda

of 89

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Page 62 of 122

yan)                                                                     Grants     External     | Wo¥- Tal)  Levy      Other     General       Total
                                                                                        Funds                ea          Xk Ad         Rates
(Pathway renewal at James StNoosavile                                                                                                25000 $25,000
  Noosaville, Wiliam StreetSharedZoneSSOSC~SCSSSSCSYSSC—SSSCSCS™SC™~CSSTSCSCSTSCSCSCSCSS*dS «8000 FS                                              6,000
 Pathways &Enabling Facilities Total = SSsS*~=<“<*‘“‘S*S*”*”*S*SSC*‘ “BSSS*C~“‘CO™C*S”S#’S#C#‘“(#N(N#NC#SS«,090,083/$ 4,196,866
 Public
5	1	1	1	6	2	263	316	1333	82	0	TransportinfrastructureSsS—~—SsSsYS
5	1	1	1	6	3	1958	316	834	82	0	CdYSSC‘“~sSYSC“‘(‘(SNC*r.C™CSYSC
5	1	1	1	6	4	2880	316	110	82	27	TCU
4	1	1	1	7	0	117	387	3137	45	-1	
5	1	1	1	7	1	142	364	95	87	7	Shire
5	1	1	1	7	2	236	364	59	87	96	Bus
5	1	1	1	7	3	301	364	110	87	66	Shelter
5	1	1	1	7	4	417	364	146	87	88	Disabled
5	1	1	1	7	5	569	364	161	87	76	Compliant
5	1	1	1	7	6	729	364	153	87	93	Program:
5	1	1	1	7	7	881	387	2373	45	0	Yearé—=SS~S~S~SSCSOOD|SCSC*~*~‘“‘C‘CSCO#C“‘#WUNCNSNWNW’..CY..---_+(fS.~—~900,000/$
5	1	1	1	7	8	3100	364	153	87	69	600,000.
4	1	1	1	8	0	117	436	3137	45	-1	
5	1	1	1	8	1	127	413	202	86	61	Noosaville,
5	1	1	1	8	2	328	413	79	86	84	Lake
5	1	1	1	8	3	406	413	109	86	89	Weyba
5	1	1	1	8	4	521	413	94	86	75	Drive
5	1	1	1	8	5	117	436	3137	45	0	BusTumaroundSOS—~—SYSC~dYSCSdSCC—SSTCCSdS
5	1	1	1	8	6	2685	413	317	86	41	«215,000
5	1	1	1	8	7	3001	413	29	86	55	|
5	1	1	1	8	8	3029	413	216	86	50	$215,000
4	1	1	1	9	0	117	485	3137	45	-1	
5	1	1	1	9	1	99	462	126	84	79	Public
5	1	1	1	9	2	225	462	399	84	79	Transportinfrastructure
5	1	1	1	9	3	624	462	98	84	61	Total
5	1	1	1	9	4	117	485	3137	45	0	~——SsS=~=<“*‘*‘~*s*‘“‘*~SSC«tWOSS*~<“~*~*S*‘“‘CSNCC#CNO#¥SS’««B6,O00/$
5	1	1	1	9	5	3095	462	161	84	0	816,000,
4	1	1	1	10	0	117	535	3137	44	-1	
5	1	1	1	10	1	113	513	28	83	36	|
5	1	1	1	10	2	140	513	402	83	62	SealedRoadsNetwork
5	1	1	1	10	3	1074	513	520	83	20	SSCS
5	1	1	1	10	4	1560	535	1694	44	7	STOO
4	1	1	1	11	0	117	583	3137	46	-1	
5	1	1	1	11	1	127	560	96	88	51	Shire
5	1	1	1	11	2	237	560	104	88	88	reseal
5	1	1	1	11	3	340	560	30	88	91	&
5	1	1	1	11	4	369	560	199	88	49	rehabilitation
5	1	1	1	11	5	575	560	140	88	69	program
5	1	1	1	11	6	1227	560	544	88	17	SSS
5	1	1	1	11	7	1802	583	1452	46	0	CdYSSCSC~™CSCCSTCSC~C~“‘*dCSCSC*CS*C~S*rS:C
5	1	1	1	11	8	2921	560	67	88	36	5B
5	1	1	1	11	9	2995	560	74	88	45	|S
5	1	1	1	11	10	3075	560	148	88	45	2.489.598
5	1	1	1	11	11	3229	560	30	88	76	|
4	1	1	1	12	0	117	633	3137	45	-1	
5	1	1	1	12	1	127	610	108	86	19	Black
5	1	1	1	12	2	234	610	152	86	91	Mountain
5	1	1	1	12	3	392	610	15	86	60	-
5	1	1	1	12	4	421	610	80	86	96	Black
5	1	1	1	12	5	500	610	158	86	96	Mountain
5	1	1	1	12	6	657	610	80	86	93	Road
5	1	1	1	12	7	743	610	116	86	89	Prioriy
5	1	1	1	12	8	872	610	116	86	96	sections
5	1	1	1	12	9	994	610	73	86	45	road
5	1	1	1	12	10	1073	610	230	86	33	reconstruction
5	1	1	1	12	11	1388	610	223	86	0	——=S«[S$
5	1	1	1	12	12	1646	610	87	86	34	SS
5	1	1	1	12	13	1768	610	58	86	40	|
5	1	1	1	12	14	1983	633	58	45	29	i
5	1	1	1	12	15	2069	610	481	86	24	dd
5	1	1	1	12	16	2707	610	288	86	25	($90,000
5	1	1	1	12	17	3029	610	202	86	56	$90,000
4	1	1	1	13	0	117	682	3137	45	-1	
5	1	1	1	13	1	134	659	117	87	0	Whole
5	1	1	1	13	2	250	659	37	87	96	of
5	1	1	1	13	3	301	659	81	87	87	Shire,
5	1	1	1	13	4	388	659	168	87	53	Significant
5	1	1	1	13	5	562	659	88	87	92	Local
5	1	1	1	13	6	656	659	95	87	92	Roads
5	1	1	1	13	7	758	659	175	87	90	Directional
5	1	1	1	13	8	939	659	139	87	0	Signage,
5	1	1	1	13	9	1316	682	1938	45	0	SSSSCS~wCSC*‘“‘“‘S™S™*dSOC“‘“(’NTWCNWSNS“C(‘NN’.CPWSSS—SSCSCSCSCS~S~*~SC
5	1	1	1	13	10	2824	659	262	87	12	CABS
5	1	1	1	13	11	3129	659	66	87	0	80.3
5	1	1	1	13	12	3194	659	51	87	0	AT
4	1	1	1	14	0	117	732	3137	44	-1	
5	1	1	1	14	1	99	710	448	84	0	“BlackMountaintandsip
5	1	1	1	14	2	117	732	3137	44	0	——SSC~C~—~—CS~C~s~SsSSYSTSSCSSCSCSCSCSCSC~iSSSdSSSSSC
5	1	1	1	14	3	2724	710	105	84	9	dS
5	1	1	1	14	4	2857	710	161	84	42	250,000

                                                                                                                                            $250,000
   Lake Weyba Drive Emergent Works SSSCS~SSCSSSCSSSSCSCSSTSCSCSCSCSCS~SdSSSCSdS*dS BB |S                                                         45198 |
 ; Peregian Beach, David Low Way GuardrailRenewal    SSSSOS~—SSSSSSSCSC~‘“‘“RSC“‘(C#$(STYL..CCCOCd;S_+(S_75,000/$ 75,000
Sunshine
5	1	1	1	17	2	301	856	95	87	95	Beach
5	1	1	1	17	3	403	856	189	87	94	Resurfacing
5	1	1	1	17	4	598	856	182	87	25	Preparation
5	1	1	1	17	5	787	856	117	87	6	Works
5	1	1	1	17	6	1077	879	2177	45	0	SSSS~—~—~S~S~SSsYSSCSC~‘“‘“;S*dSSC‘“‘CS*LTNC“‘(#(NWYUNWNWWW’.._-YS
5	1	1	1	17	7	2643	856	218	87	0	=
5	1	1	1	17	8	2860	856	168	87	28	485,400[
5	1	1	1	17	9	3027	856	226	87	50	$185,400,
4	1	1	1	18	0	117	928	3137	45	-1	
5	1	1	1	18	1	105	905	30	86	9	~
5	1	1	1	18	2	134	905	123	86	9	Cooroy
5	1	1	1	18	3	263	905	73	86	95	Belli
5	1	1	1	18	4	356	905	80	86	96	Creek
5	1	1	1	18	5	442	905	80	86	96	Road
5	1	1	1	18	6	521	905	73	86	75	slip
5	1	1	1	18	7	600	905	51	86	87	(ex
5	1	1	1	18	8	650	905	51	86	76	TC
5	1	1	1	18	9	700	905	116	86	76	Debbie
5	1	1	1	18	10	822	905	180	86	83	Betterment
5	1	1	1	18	11	1001	905	123	86	17	Claim)
5	1	1	1	18	12	1195	928	2059	45	0	—=—SS~SSSCOOOY|YSSSSSC~dSSCSSSCSSC«dS
5	1	1	1	18	13	2872	905	123	86	0	«#8000
5	1	1	1	18	14	3029	905	30	86	43	$
5	1	1	1	18	15	3115	905	123	86	28	99,000
4	1	1	1	19	0	117	977	3137	45	-1	
5	1	1	1	19	1	99	954	385	84	4	SealedRoadsNetwork
5	1	1	1	19	2	491	954	105	84	4	Total
5	1	1	1	19	3	617	954	1050	84	0	—s—i“‘*‘“‘*~‘“‘*SSC*‘
5	1	1	1	19	4	1695	954	1057	84	0	WOOSSSSC*~“‘C;ONSC#*”NSC”#”SC‘(#SNNCN(C(#‘(¥NTY’NW’NN
5	1	1	1	19	5	2752	954	70	84	51	LS)
5	1	1	1	19	6	2836	954	161	84	47	9,489,405
5	1	1	1	19	7	2997	954	245	84	17	$9,203,418
4	1	1	1	20	0	117	1027	3137	44	-1	
5	1	1	1	20	1	106	1005	520	82	19	SportsGroundandFacilities
  S—~—“—SsSC“‘irSC(‘(SSCSLOCTTTCdSCOC~CsSYSCSSCOCOSYTTC<“C~™;™SCSrSC~COCO YS
-Girraween Sports Complex - condition assessment prionty works ——=SS~*~“~*~*~wSSC“‘(RS#*SSOWO™OOCSSOCSSSSC~SSSCSC~S~SSC« BOO] SSB
  Read Park CarpakDramageSSC—~—SSSCCCSSC—~sTSCOCOCCCTCSCSS «44,000 | $44,000
 Sports GroundandFaciliies Total SS=~=<“C~*~‘“—*~“‘“‘*S*S™SSSC“‘CESCNSCOC*;‘CNNOSNCOCOCCOCSSCO~‘“CNCNNC#ON‘C(N(NSS|97,600/$ 97,600
 | StormwaterDrainage                         SSCS TCCOSSSC(“‘“(SSC*sSOCSCSSNC NCCC
   Noosaville Thomas St Gympie Terrace Culvert Replacement      STSSCSSSSC~dSCSSCSC~C~STSSSSCSC~*dSCSSCSCSC~*dS «GO| S174, 950 |
  Shite =Priority 1 Bioretentionrenewal—SSSCSC~—~—SSSYSSSC~dSSSCSCSCSCS~iSSSCCdSTSSCSCSCSCSSS*dS 88,000 | $92,000
  Whole of Shire - Stormwater StucturesSSSC~“~*S*~“~*~*~*~*~*~*~“‘—*~S*~**S*S~wSSC“=‘“‘“‘“C«*SSSSCSC‘“RTNSC“(NNNNC YNDWWSdSCSSSCS~*dS CT S88.
jCootharaba Kinmond CkRoadCuvertsSSSCS~—“—~—‘“—*~*~*~*~*~*~*~—~—~—sSSS~SS HBTS            SC«SSSSCS~*~“‘~dSC*“‘(‘CNCSWC(S~*1,916,673'[$ 2,008,000
  Noosa Heads, Leslie Drive StormwaterManholes SS         SSOSCS~SSCSCSSCSCSC~iSSC“‘CSCSC~*dSCSC“‘“‘SC*CSSCSC~C“‘TSCNT +S _-40,000 [$40,000 |
  Sunrise Beach, Orient Drive Drainage Sip SSSSCS~—SSSCSCS™~C~—‘SSSCS*™*™SC~isSC“‘(‘C#S(L..C(S_| $90,000 /$                                      90,000
   Drainage works for renewal of kerb, channel and pits at Coates Dr &De Jounge Ch Boren || SSSSSC*YSCSC*C*~“‘“*S*dSSC“‘’’TCSNTW+(S~*78,120( 78,120
  Renewal of catchpittops at Sunshine Beach                     SSC*iSCCSC*dSSCSC~sSSCSCSCSCSCSSTSCSCSCSCSCS~SSSSS*SS 000 | $117,000
  Renewal of various stormwater structures acrossthe shire    SSSC~*dSSC*~‘“‘“‘“SSC“‘CSC*LC‘#(#*RNNNNCdST CS _140,500[ $140,500 |
  Drainage renewal works at Weyba Rd, Noosavile       SSSC~—SYSSSCSC~—SSSSCSC~—SYSSC™~™CSSCCS «dS                                    88.000 | $68,000
 StormwaterDrainage Total = ss—“‘*~*é‘“‘“‘;*™*~*sSSCOTSC ~*~‘                                                        NCO#*#¥S«AAO,B62/$ 2,009,109
 | Streetscapes andRoadGoridorsS—S—SSC CCC                                                                                  COCO
  Noosa Heads Noosa Parade Road Corridor Upgrade-Design ——SSSSSSSSC~dSC“‘“‘S3SCLOCO*dSSOC*C~C“‘“‘SNC*CYSCSC“‘(#NNWCLWT’.._S 108,659 [$108,650
  Whole of Shire, StestLighting Program SSCSC~—~SSSCSCSYSS™SC—STTCCSC~CSSTTSCCSTCSS «YS                                              20,000 $20,000
 Streetscapes andRoadCorridors Total =   SSS~<“—~*~‘“‘*~*~*“‘“*S*S*S*S*SYSC“‘CSNSNC#CNOC*‘“‘(SNSNNCSNNNNNNNNCLYNNSCSC“‘#S#SLNONC#C#C“(‘#N“S#(NS WSS) «*428,659'/ $123,659
“Transport andInfrastructureManagementSS—~—SsS—sSYSSC~sYSC“(‘(SSCLOOOCOC“‘*UNNC(N(NNONOOCOC‘#CNC(NNC
 -—Tewantin Poinciana , Morrindl St roundabout + Poinciana Ave (Werinto Sidoni) ——~—~«($—=~=S~Sd|SSSCS~wSC*C“‘(CSCCC*C(S~—<S07.876|$ 807,876 |$ 1,055,782
 ~ Shite Traffic Study Priority 1 Construction Hilton Tce & Emest tint upgrade Yriof2 | SS Sid SSSSCS~dYCSC~C‘“~*~*dS:~C«TBTB |S 7B.B7B| S     496,750
  Shire Forward Planning & Design Program Construction ready designs. |S] SSSSSSC~dYSCSCSC~C~‘“~*~*rSC“‘*‘~*~*rCSSCSCSCSCSC*rS;~SC«ODO |S _225,000 |
  - Weyba Road Corridor improvements SSSCS*~“~*~*~‘“*‘“*~*~*~*~*~SSCCO|SSCSSSC*“‘C®SNCSNCUWCC#@SC“‘(N#NCCS'~=«#892,779|'S 1,700,000.
                                                                                                                                         Page 62 of 122
Log in to download the original file

2018-04-16 General Committee Agenda(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.