Concurrence Agency Response - DEHP
EHP Permit number: SPCC05235213 CONDITIONS 1. All works are to be constructed in accordance with the approved drawings and specifications listed in the approved plans section of this permit. 2. All reasonable and practicable measures must be taken to avoid or minimise the risk of the release of contaminants to waters. 3. Measures must be taken to limit turbidity in tidal waters as a result of the works. 4. Disturbance to the bed and banks of the waterway must be kept to a minimum. 5. Any material or debris that falls or is deposited on tidal lands during the works must be removed at the applicant's cost and expense prior to the practical completion of the works. 6. A report from a registered professional engineer must be submitted to EHP on request, certifying that — (a) the works (including any other associated works) have been constructed in accordance with the approved drawings; and (b) the works are structurally adequate for anticipated usage; and (c) the bed and banks of the waterway for a distance of 15m around the site of the works are clear of all debris. 7. The chief executive administering the Coasta/ Protection and Management Act 1995 may order the works be removed or modified within a reasonable time, if the works have or are likely to have a significant effect on coastal management because the works: (i) create a navigation hazard or other danger to the public; or (ii) cause erosion or land degradation; or (iii) are unstable; or (iv) have not been constructed according to the approved plans. END OF CONDITIONS Page 3 of 3 * 120607 « Version 1 Department of Environment and Heritage Protection
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Concurrence Agency Response - DEHP.msg)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.