                                             GEOTECHNICAL INVESTIGATION
                                                            Proposed Renovations
                                                               2 Arakoon Crescent
                                                                  Sunshine Beach

                                                       Report for: Christopher Kelly
                                                                C/- Adapt Planning
                                                                   22484-001-Rev0
                                                                  24 February 2023


           Tectonic Geotechnical Pty Ltd
           PO Box 899, Buderim QLD 4556
           Office: 07 5478 9016
           Email: [email protected]
           www.tectonicgeo.com.au
           A.B.N. 83 165 727 828




Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023
Log in to download the original file

ECM_22343520_v1_Geotechnical Investigation.pdf · 6.3 MB (large file)

The download may take up to a minute.

Full text of the other 34 pages

Page 2

                                             PROPOSED RENOVATIONS
                                             2 ARAKOON CRESCENT, SUNSHINE BEACH

            Document Review
                Document No.               Revision       Prepared By       Reviewed By            Date Issued

                      001                     0           Michael Cocks     Ashley Davey       24 February 2023




            Report Distribution
               Document           Revision        Method of Delivery                   Issued To
                                                                                    Christopher Kelly
                    001                0              Electronic
                                                                                  [email protected]
                                                                                      Amanda Evans
                    001                0              Electronic                      Adapt Planning
                                                                           ([email protected])




            Prepared By:                                                    Reviewed By:




            Michael Cocks BEng MIEAust NER RPEQ 27540                       Ashley Davey RPEQ 8159
            Senior Geotechnical Engineer                                    Managing Director




             24 February 2023
             Report No. 22484-001-Rev0                                 i
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 3

                                           PROPOSED RENOVATIONS
                                           2 ARAKOON CRESCENT, SUNSHINE BEACH

            Executive Summary
            This report details the results of a geotechnical assessment undertaken for the proposed renovations to an
            existing residence at 2 Arakoon Crescent, Sunshine Beach. The investigation was carried out by Tectonic
            for Christopher Kelly. Adapt Planning are the consulting town planners for the project.
            Royal Haskoning Australia DHV (RHDHV) has provided a coastal engineering report, detailing a review of
            the Erosion Prone Area associated with the coastal building line at the subject site (Ref. PA3303, Status
            S0/P01.01, Rev R1, dated 20 February 2023). A site investigation ‘soil test’ report was completed by
            Australian Soil Investigations (ASI, Ref. Report No. 220343(S), dated 22 September 2022). Tectonic
            conducted three additional standalone dynamic cone penetrometer (DCP) tests down the main high dune
            face and near the dune toe for an assessment of the density of the underlying sands.
            This report presents the results of the geotechnical assessment and slope stability modelling to address
            possible slope failure following a hypothetical future sea surge/storm event nominated by RHDHV, along with
            associated geotechnical recommendations and comments.
            Preliminary architectural drawings indicate that the proposed development will comprise partial demolition of
            the existing residence and pool, although some of the structural elements will be retained for future utilisation
            (subject to an assessment by a structural RPEQ). The proposed renovations would be superimposed over
            the existing footprint, extending to two storeys height. The northern edge of the building would be excavated
            into the ground for a garage level and cellar room, which will have a pool positioned directly above partially
            cantilevered towards the dune slope to the east. Provided sections indicate that excavations up to about 2 m
            deep will be required, which will be retained.

            Although the proposed footprint does not extend significantly beyond the existing building envelope,
            following demolition, it is anticipated that some form of temporary retention may be required, especially
            where excavations extend close to site boundaries or existing structures/elements (to remain). Filling is
            anticipated to be minor and less than 1 m high.

            The ASI investigation comprised two boreholes (designated BH1 and BH2) along the eastern edge of the
            existing residence. These boreholes encountered consistent subsurface conditions, summarised as
            follows:

                     Fill – comprising loose gravelly sand and silty sand, with deleterious materials (i.e. rubbish) from
                      the ground surface to depths between 0.9 m and 2.1 m below ground level (BGL), then
                     Natural Sand – comprising loose silty sand to the borehole termination depths of 3 m BGL.

            ASI continued DCP testing below the borehole termination depths which indicated that the natural sands
            became medium dense below depths between 3 m and 3.6 m BGL to the DCP termination depths.

            Standalone DCP testing by Tectonic along the high dune face and near the dune toe indicated the
            following:

                     Very loose/loose sands to depths between 1.1 m and 2.3 m BGL; then
                     Medium dense sands to depths between 1.4 m and 4 m BGL; followed by
                     Dense to very dense sands with practical DCP refusal at depths between 1.6 m and 5.8 m BGL.

            Our slope stability modelling considered a hypothetical storm and wave scenario nominated by coastal
            engineering experts RHDHV, which included a combination of short-term erosion from a 500-year average
            recurrence interval storm event and shoreline recession due to sea level rise for the 2100 climate extreme
            event scenario. Section 7 of the coastal erosion assessment indicates that the existing house site and
            proposed development is not likely to be impacted by beach erosion under this scenario. In accordance with
            previously adopted practices along the Sunshine Beach coastal strip a 28° line was modelled from the
            current dune toe which does not intersect the eastern boundary or proposed development area.
            Although the extreme storm case does not appear to impact the subject site, to assess the factor of safety
            (FOS) against instability for the proposed development, numerical modelling has been undertaken
            considering the existing dune slope and subsurface conditions from the investigation results.


             24 February 2023
             Report No. 22484-001-Rev0                               ii
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 4

                                          PROPOSED RENOVATIONS
                                          2 ARAKOON CRESCENT, SUNSHINE BEACH

            Our analysis indicates that stability of the site hinges on the temporary and permanent retention systems.
            Provided that footings for the residence and structural walls are founded at least 1 m into medium dense (or
            denser) sands and the existing timber sleeper wall to the east of the residence is replaced with a new
            engineer designed and certified structure founded on shear piles, the required minimum FOS for long-term
            stability (i.e. 1.5) could be achieved.
            Our limit equilibrium modelling indicates that relatively conventional building piles could be adopted for the
            proposed development generally; however, piles socketed at least 1 m into medium dense (or denser) sand
            designed with an unfactored shear force resistance of 100 kN/m (or equivalent) will be required beneath the
            new retaining wall to the east of the residence. It should be noted that required shear and bending
            resistance of the piles and their depth should be determined by finite element analyses based on all relevant
            loads including from structures (not included in our Slope/W modelling) and all soil, fill and landscaping
            loads. To facilitate a larger level garden/grassed area to the east of the residence, the new retaining wall
            could be located further eastwards, however not beyond the current dune crest.

            The following additional recommendations are provided for the proposed development:
                     The residence and any ancillary structures (including retaining walls and pools) must be supported
                      by footings founded at least 1 m into medium dense (or denser) natural sands. Based on the results
                      of the investigation founding depths are anticipated to range between about 4 m and 5 m BGL
                      (existing ground levels). In some areas of deeper cut, high level footings may be adopted.
                      Elsewhere, piles would be required. Subsurface conditions should be confirmed by deeper borehole
                      drilling in the western part of the site following demolition of the existing structures.
                     Excavations close to site boundaries may necessitate the installation of temporary shoring prior to
                      excavation. Based upon our experience with similar projects in proximity, shoring could comprise
                      sheet piles or contiguous piles.
                     Surcharge loads across the high dune crest (i.e. east of the residence) should be limited to no more
                      than 5 kPa, unless assessed and approved by Tectonic.
                     Ground vibrations during construction should be minimised and monitored. Where excessive
                      vibrations occur, alterations to construction techniques may be required. It is recommended that a
                      dilapidation survey of adjoining structures be completed prior to construction.
                     Revegetation of bare slopes around the development area should be undertaken as soon as
                      possible following construction. Similarly, improvements to the vegetation (i.e. with endemic native
                      species) on the natural high dune face downslope of the residence would also aid in restricting the
                      development of initial surficial failures.
                     All collected roof water should be directed by pipes to the council stormwater system along The
                      Esplanade (e.g. through the use of a ‘wet’ or ‘charged’ drainage system) or, where not physically
                      possible, surface water should be directed to infiltrate into the ground around the edges of hard
                      surfaces. Infiltration areas should be set back as far as possible from the crest of the dune slope.
                      Hydraulic design should be such that under no circumstances are uncontrolled stormwater flows
                      permitted over the dune face; where channelised erosion and scour features could develop.
                     The scour in the south-eastern corner of the site should be reinstated with a cellular confinement
                      system and rock fill (gabions, reno mattress or similar) designed by a civil RPEQ.
            Based on the findings of our assessment it is considered that a Low Risk of slope instability could be
            achieved for the proposed development, subject to the following:

                     Implementation of the recommendations given in this report in preparing the preliminary design;
                     Review of the preliminary detailed design by Tectonic to confirm compliance with the
                      recommendations herein; and
                     Installing a new engineer designed and certified retaining structure supported on piles founded at
                      least 1 m into medium dense (or denser) sand, designed to accommodate an unfactored shear
                      resistance of 100 kN/m, along the eastern edge of the level area to the east of the residence.




             24 February 2023
             Report No. 22484-001-Rev0                              iii
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 5

                                                         PROPOSED RENOVATIONS
                                                         2 ARAKOON CRESCENT, SUNSHINE BEACH

            Table of Contents
            1.0    INTRODUCTION ........................................................................................................................................................ 1

            2.0    PROPOSED DEVELOPMENT ................................................................................................................................... 1

            3.0    METHOD OF INVESTIGATION ................................................................................................................................. 3

                   3.1         Fieldwork ...................................................................................................................................................... 3

            4.0    RESULTS OF INVESTIGATION ................................................................................................................................ 3

                   4.1         Site Description............................................................................................................................................. 3

                   4.2         Topography................................................................................................................................................... 6

                   4.3         Geology ........................................................................................................................................................ 7

                   4.4         Subsurface Conditions.................................................................................................................................. 8

                   4.5         Groundwater ................................................................................................................................................. 8

                   4.6         Surface Drainage .......................................................................................................................................... 8

            5.0    SLOPE STABILITY ASSESSMENT .......................................................................................................................... 9

                   5.1         Existing Conditions ....................................................................................................................................... 9

                   5.2         Stability Assessment................................................................................................................................... 10

                   5.2.1            Quantitative Assessment ...................................................................................................................... 11

            6.0    GEOTECHNICAL RECOMMENDATIONS .............................................................................................................. 14

                   6.1         Earthworks .................................................................................................................................................. 14

                   6.1.1            Site Preparation and Trafficability ......................................................................................................... 14

                   6.1.2            Excavations ........................................................................................................................................... 14

                   6.1.3            Filling..................................................................................................................................................... 15

                   6.2         Building Foundations .................................................................................................................................. 15

                   6.2.1            Indicative Site Classification.................................................................................................................. 15

                   6.2.2            Footing Design ...................................................................................................................................... 16

                   6.3         Temporary and Permanent Retention......................................................................................................... 17

                   6.4         Drainage ..................................................................................................................................................... 18

            7.0    CONCLUSION ......................................................................................................................................................... 19

            8.0    LIMITATIONS .......................................................................................................................................................... 19




             24 February 2023
             Report No. 22484-001-Rev0                                                              iv
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 6

                                                           PROPOSED RENOVATIONS
                                                           2 ARAKOON CRESCENT, SUNSHINE BEACH

            TABLES
            Table 1: Stability Risk Levels ............................................................................................................................................ 10

            Table 2: Details of Qualitative Risk Assessment for Property (AGS 2007) ....................................................................... 10

            Table 3: Retaining Structure Design Parameters .............................................................................................................. 18



            TEXT FIGURES
            Text Figure 1: Proposed layout plan (upper) and some cross-sectional views (lower) courtesy of Aboda Design
                      Group ................................................................................................................................................................. 2

            Text Figure 2: Aerial image of the site and surrounds (courtesy of Noosa Council ‘intra-maps’) ........................................ 4

            Text Figure 3: Oblique Tectonic drone image looking north ................................................................................................ 4

            Text Figure 4: Drone image looking due west over dune in vicinity of site .......................................................................... 5

            Text Figure 5: Westerly view of the residence from high dune crest ................................................................................... 5

            Text Figure 6: Detailed survey of the site and high dune, courtesy of Minestaff Survey ..................................................... 6

            Text Figure 7: Tectonic drone image of the dune face and main beach looking north ........................................................ 7

            Text Figure 8: Extract of Laguna Bay 1:100,000 Scale Surface Geology Map.................................................................... 7

            Text Figure 9: Scour in the southern part of the site (LHS) and bulging coir log (RHS) ...................................................... 9

            Text Figure 10: Extract from Noosa Council landslide hazard overlay mapping ................................................................. 9

            Text Figure 11: Geological model of the site and high dune, including extreme storm event scenario ............................. 12

            Text Figure 12: Slope/W output for the proposed development ........................................................................................ 13

            Text Figure 13: Footing depth required to prevent undermining........................................................................................ 17



            FIGURES
            Figure 1: Site Plan



            APPENDICES
            APPENDIX A
            DCP Reports

            APPENDIX B
            AGS Guidelines – Qualitative Terminology for Use in Assessing Risk to Property
            Some Guidelines for Hillside Construciton

            APPENDIX C
            Limitations




             24 February 2023
             Report No. 22484-001-Rev0                                                              v
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 7

                                         PROPOSED RENOVATIONS
                                         2 ARAKOON CRESCENT, SUNSHINE BEACH

            1.0        INTRODUCTION
            This report details the results of a geotechnical assessment undertaken for the proposed renovations to an
            existing residence at 2 Arakoon Crescent, Sunshine Beach. The investigation was carried out by Tectonic
            for Christopher Kelly, generally in accordance with Proposal P22631-Rev0 dated 4 October 2022. Adapt
            Planning are the consulting town planners for the project.
            Royal Haskoning Australia DHV (RHDHV) has provided a coastal engineering report, detailing a review of
            the Erosion Prone Area associated with the coastal building line at the subject site (Ref. PA3303, Status
            S0/P01.01, Rev R1, dated 20 February 2023).
            A site investigation ‘soil test’ report was completed by Australian Soil Investigations (ASI, Ref. Report No.
            220343(S), dated 22 September 2022). Tectonic conducted three additional standalone dynamic cone
            penetrometer (DCP) tests down the main high dune face and near the dune toe for an assessment of the
            density of the underlying sands.
            This report presents the results of the geotechnical investigation and slope stability modelling to address
            possible slope failure following a hypothetical future sea surge/storm event nominated by RHDHV, along with
            associated geotechnical recommendations and comments.

            2.0        PROPOSED DEVELOPMENT
            Preliminary architectural drawings by Aboda Design Group were supplied to Tectonic
            (Ref. Drawing Nos. WD.101 to WD.601 [not inclusive], Issue DA, dated 21 September 2022). Based on the
            provided drawings it is understood that the proposed development will comprise partial demolition of the
            existing residence and pool, although some of the structural elements will be retained for future utilisation
            (subject to the findings of the geotechnical investigation and assessment by structural engineers).

            The proposed renovations would be superimposed over the existing footprint, extending to two storeys
            height. The northern edge of the building would be excavated into the ground for a garage level and cellar
            room, which will have a pool positioned directly above partially cantilevered towards the dune slope to the
            east. Provided sections indicate that excavations up to about 2 m deep will be required, which will be
            retained.

            Although the footprint does not extend significantly beyond the existing building envelope, following
            demolition, it is anticipated that some form of temporary retention may be required, especially where
            excavations extend close to site boundaries or existing structures/elements (to remain). Filling is anticipated
            to be less than 1 m high.
            The proposed layout and some cross-sectional views are provided in Text Figure 1 overleaf.




             24 February 2023
             Report No. 22484-001-Rev0                              1
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 8

                                          PROPOSED RENOVATIONS
                                          2 ARAKOON CRESCENT, SUNSHINE BEACH




            Text Figure 1: Proposed layout plan (upper) and some cross-sectional views (lower) courtesy of Aboda Design Group




             24 February 2023
             Report No. 22484-001-Rev0                               2
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 9

                                         PROPOSED RENOVATIONS
                                         2 ARAKOON CRESCENT, SUNSHINE BEACH

            3.0        METHOD OF INVESTIGATION

            3.1         Fieldwork
            An experienced geotechnical engineer from Tectonic undertook a site walk-over on 5 December 2022 to
            visually assess indicators of past slope instability. The walk-over included assessment of soil exposures,
            surface drainage conditions, topography, evidence of erosion or past instability, and vegetation
            coverage/condition.

            At the time of the walkover three standalone DCP tests (denoted DCP1 to DCP3) were conducted down the
            high dune face. DCP1 was conducted near the eastern property boundary, DCP2 at an intermediate point,
            around half-way down the dune face, and DCP3 near the dune toe. All DCPs were completed to practical
            refusal. DCP reports are attached in Appendix A, with locations shown in Figure 1.

            4.0        RESULTS OF INVESTIGATION
            4.1        Site Description
            The site is formally described as Lot 783 on RP48111, covering an area of about 866 m2, with frontage to
            The Esplanade along the western boundary. At the time of the investigation the site featured an existing
            residence of mostly two storeys, with a single level garage and mostly inground pool along the western
            boundary. A levelled terrace area was located along the eastern edge of the residence which was supported
            by a timber sleeper wall about 0.5 m to 1 m high. Based on an external assessment, visible areas of the
            existing structures appeared to be in relatively good structural condition, with no obvious signs of distress
            (e.g. cracking, misalignment etc.) which would be indicative of global slope instability. Cracking <10 mm
            wide was observed in parts of the rendered finish, with corrosion noted within some of the fixings.

            Two to three storey houses and low-rise unit buildings were generally present in the vicinity of the site, of
            varying age and construction methodology. The areas around the residence featured garden beds, small
            bushes and scattered trees. A large pine tree adjacent to the south-eastern corner of the residence was
            noted to be tilting and exhibited a ‘J’ shaped curve, and appeared to be undermined by an erosion scour
            which extended down the high dune face below.

            Patchy vegetation was observed along the upper part of the high dune face, with relatively dense vegetation
            present further downslope comprising ground cover plants and a small number of trees, such as Banksia
            and She-Oak.
            The asphalt seal and kerb and channel along The Esplanade in the vicinity of the site was noted to be in
            good condition with no obvious signs of cracking or misalignment. An aerial image of the site and surrounds
            is provided on Text Figure 2 overleaf.




             24 February 2023
             Report No. 22484-001-Rev0                              3
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 10

                                             PROPOSED RENOVATIONS
                                             2 ARAKOON CRESCENT, SUNSHINE BEACH




                                                                 Subject Site




                                                                                                             Sunshine Beach




            Text Figure 2: Aerial image of the site and surrounds (courtesy of Noosa Council ‘intra-maps’)

            Site conditions at the time of our investigation are shown in Text Figures 3 to 5 below and overleaf.




                                       Subject Site




            Text Figure 3: Oblique Tectonic drone image looking north




             24 February 2023
             Report No. 22484-001-Rev0                                  4
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 11

                                            PROPOSED RENOVATIONS
                                            2 ARAKOON CRESCENT, SUNSHINE BEACH



                                                                                        Subject site




            Text Figure 4: Drone image looking due west over dune in vicinity of site




            Text Figure 5: Westerly view of the residence from high dune crest




             24 February 2023
             Report No. 22484-001-Rev0                                  5
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 12

                                            PROPOSED RENOVATIONS
                                            2 ARAKOON CRESCENT, SUNSHINE BEACH

            4.2         Topography
            During the site walk-over, topographic features specific to the site were noted, and ground slopes were
            recorded using a hand-held clinometer. As illustrated in a detailed survey by Minestaff Survey (Ref. M4371-
            3000-002, Rev A, dated 5 January 2023) in Text Figure 6 below, the existing residence is located on
            relatively gently sloping ground above the crest of the easterly facing high sand dune slope. The eastern
            property boundary extends partway down the dune slope.

                                                  Subject Site




            Text Figure 6: Detailed survey of the site and high dune, courtesy of Minestaff Survey

            Locally, Arakoon Crescent and The Esplanade may have been constructed by cut and fill earthworks. It is
            not known if the original roadworks fill is now retained along the western boundary, or if it was removed by
            excavations during residential construction. The natural surface profile at the site had been interrupted by
            historic landscaping and residential construction. Based on a visual assessment it appeared that cut and fill
            earthworks in the order of about 3 m deep and 1.5 m high had been previously undertaken, most of which
            were supported by retaining walls. An offset of about 5 m was present between the eastern edge of the
            existing residence, and the main break in slope to the high dune face.
            The dune face sloped at around 32° to 35° just off the crest, reducing to around 30° across the majority of
            the face. Beyond the eastern boundary a swale feature was apparent comprising a gently sloping bench
            (<5°) for a horizontal distance of about 5 m to 8 m (increasing in width progressing southwards) and a
            downslope mound estimated to be about 1.5 m high along the seaward edge. This mound had a backslope
            of about 25° (west towards the bench), with the seaward facing flank dipping at about 30°. It was unclear
            what created the swale feature in the central part of the dune face; however, it was likely due to previous
            earthworks, presumably to make an access track. Beyond the toe of the foredune a gently undulating
            incipient dune continued eastwards towards the main beach.

            Excluding the swale feature, the face of the dune was generally consistent and linear, steepening to about
            40° around 3 m up (vertically) from the toe. Beyond the toe of the main high dune, a trough was present of
            about 10 m width; then a small foredune around 1.5 m height, with side slopes of around 15° to 20°. A
            shorter trough of about 5 m width was then present to an incipient dune, around 1 m high; with side slopes of



             24 February 2023
             Report No. 22484-001-Rev0                                  6
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 13

                                                    PROPOSED RENOVATIONS
                                                    2 ARAKOON CRESCENT, SUNSHINE BEACH

            up to 10°. The beach extended thereafter, dropping down from about RL 2 m AHD to the shoreline (around
            RL 0 m AHD).
            The abovementioned geomorphological features are illustrated in Text Figure 7 below.



                                                  Subject Site



                                                                     High Dune

                                                                                 Swale/Track




                                                                                                      Foredune
                                                                                                                      Incipient dune




                                                                                         Troughs/Swales




            Text Figure 7: Tectonic drone image of the dune face and main beach looking north

            4.3            Geology
            Available geological information 1 indicates that the site is underlain by Pleistocene age quartz dune sand
            (described as “parabolic dunes”; Ref. extract of published mapping in Text Figure 8). The headlands to the
            north of the site are indicated to consist of materials derived of the Tiaro Coal Measures, a late Triassic to
            Jurassic age sedimentary deposit. These materials are expected to underlie the dune sands proximal to the
            site at depth.




                                                                                                    Approx. Site Location




            Text Figure 8: Extract of Laguna Bay 1:100,000 Scale Surface Geology Map




            1
                Queensland Government, Dept. of Natural Resources, Mines and Energy, 1:100,000 Laguna Bay Surface Geology, Sheet 9545, 2018



             24 February 2023
             Report No. 22484-001-Rev0                                               7
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 14

                                           PROPOSED RENOVATIONS
                                           2 ARAKOON CRESCENT, SUNSHINE BEACH

            4.4         Subsurface Conditions
            The ASI investigation comprised two boreholes (designated BH1 and BH2) along the eastern edge of the
            existing residence. These boreholes encountered consistent subsurface conditions, summarised as
            follows:

                     Fill – comprising loose gravelly sand and silty sand, with deleterious materials (i.e. rubbish) from
                      the ground surface to depths between 0.9 m and 2.1 m below ground level (BGL); then
                     Natural Sand – comprising loose silty sand to the borehole termination depths of 3 m BGL.

            ASI continued DCP testing below the borehole termination depths which indicated that the natural sands
            became medium dense below depths between 3 m and 3.6 m BGL to the DCP termination depths.

            Standalone DCP testing by Tectonic along the high dune face and near the dune toe indicated the
            following:

                     Very loose/loose sands to depths between 1.1 m and 2.3 m BGL; then
                     Medium dense sands to depths between 1.4 m and 4 m BGL; followed by
                     Dense to very dense sands with practical DCP refusal at depths between 1.6 m and 5.8 m BGL.

            4.5         Groundwater
            No signs of groundwater seepage (‘springs’) were observed at the ground surface during our walk-over. No
            groundwater was mentioned on the ASI borehole reports, with the soils described as ‘moist’.

            Groundwater conditions are expected to be reflective of prevailing weather conditions and seepage may
            develop, particularly following periods of prolonged or heavy rainfall at various points through the dune
            profile. Based upon experience at other similar sites in the area, such seepage would be expected to be
            transient and of relatively minor lateral extent.

            4.6         Surface Drainage
            Surface drainage would be expected to follow natural surface gradients to the east towards the beach. The
            site has a relatively small catchment, with some run-off expected to enter the site from upslope along The
            Esplanade; however, most of which should be intercepted by the existing kerb along the frontage.

            Given the sandy nature of the site, rainfall would normally be anticipated to infiltrate the ground surface
            relatively quickly. However, as the proposed development will occupy a large part of the block, significant
            run-off from hard surfaces will likely occur. Nevertheless, where directed into swales rather than pipes,
            such run-off would be expected to infiltrate into the natural sands relatively rapidly.

            A scour was observed in the south-eastern corner of the site, downslope of the existing residence. The
            scour was estimated to be between 1 m and 2 m deep with side scarps dipping between 40° and 50°. A
            coir log ‘silt sausage’ was observed above the head of the scour feature which was bulging with debris. A
            PVC outlet was also observed upslope of the area which discharged directly onto the ground surface, with a
            corresponding scour about 0.5 m deep. It appeared that concentrated stormwater runoff discharged into
            this area, resulting in the observed scour features.

            Anecdotal evidence by the owner suggests that stormwater previously discharged into the area including
            from the road surface above, with works undertaken to attempt to divert the water away from the area.
            Stormwater improvements are recommended in Section 6.4.

            No other significant surface run-off features were noted across the allotment during our assessment.




             24 February 2023
             Report No. 22484-001-Rev0                               8
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 15

                                            PROPOSED RENOVATIONS
                                            2 ARAKOON CRESCENT, SUNSHINE BEACH




            Text Figure 9: Scour in the southern part of the site (LHS) and bulging coir log (RHS)

            5.0        SLOPE STABILITY ASSESSMENT
            5.1        Existing Conditions
            The Noosa Planning Scheme 2020 includes a landslide hazard overlay map (Ref. extract in Text Figure 10
            below) which indicates that the eastern part of the site is within a Moderate Hazard Area. Beyond the
            eastern boundary the high dune face is mapped as having a Moderate to High hazard.




                                                                                 Subject Site




            Text Figure 10: Extract from Noosa Council landslide hazard overlay mapping

            It should be noted that the Noosa Council landslide hazard map is a broad-scale indication of the potential
            landslide susceptibility and is superseded by this site-specific assessment. The allotment did not exhibit
            any visible surface features which would indicate large scale global slope instability during our walkover:
            no landslide back scarps, noteworthy groundwater seepage or areas of naturally ‘hummocky’ ground were
            observed. Medium dense sands were inferred at relatively shallow depths below surface, with the high
            dune standing at between 28° to 35°; and with a slightly steepened section at the toe having a gradient in
            the order of 40°.




             24 February 2023
             Report No. 22484-001-Rev0                                  9
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 16

                                                     PROPOSED RENOVATIONS
                                                     2 ARAKOON CRESCENT, SUNSHINE BEACH

            5.2          Stability Assessment
            The risk assessment for this project has been carried out following AGS 2007 Practice Note Guidelines for
            Landslide Risk Management. Relative levels of risk and their implications are given in Table 1.
            Table 1: Stability Risk Levels
              Risk Level                   Example Implications(1)
                                           Unacceptable without treatment. Extensive detailed investigation and research, planning and implementation of
                      Very High Risk
              VH                           treatment options essential to reduce risk to Low; may be too expensive and not practical. Work likely to cost
                                           more than value of property.
                                           Unacceptable without treatment. Detailed investigation, planning and implementation of treatment options
              H       High Risk            required to reduce risk to Low. Work would cost a substantial sum in relation to the value of the property.


                                           May be tolerated in certain circumstances (subject to regulators’ approval) but requires investigation, planning and
                      Moderate Risk
              M                            implementation of treatment options to reduce risk to Low. Treatment options to reduce to Low risk should be
                                           implemented as soon as practicable.

                                           Usually acceptable to regulators. Where treatment has been required to reduce the risk to this level, ongoing
              L       Low Risk
                                           maintenance required.
                      Very Low Risk
              VL                           Acceptable. Manage by normal slope maintenance procedures.

              Note: (1) The implications for a particular situation are to be determined by all parties to the risk assessment and may depend on the nature of the
              property at risk; these are only given as a general guide.

            Considering the existing site conditions (Ref. Section 2), and subject to the implementation of
            recommendations given below, it is assessed that there would be a Low (L) Risk of global slope instability
            affecting the proposed development. Regulators (NC) normally require that a Very Low or Low Risk of
            landslide affecting the property must be demonstrated to enable development approval. Summarised in
            Table 2 is our qualitative assessment of landslide risk for the development site. A summary of qualitative
            terminology for use in assessing risk to property is attached (taken from AGS 2007).
            Table 2: Details of Qualitative Risk Assessment for Property (AGS 2007)
                                                                                             Assessed
              Hazard                                    Likelihood         Consequence         Risk            Comments




                                                                                                               Given the low to moderate natural gradients through
                                                                                                               the proposed building area, retention proposed and
              1: Failure through very loose to
                                                                                                               protection of eastern side of site using a shear pile wall
             loose natural sands above the
                                                          Unlikely           Medium               Low          it is considered Unlikely that a landslip in these
             foundation depth across the
                                                                                                               materials would affect the proposed development.
             building area.
                                                                                                               Given a potential Medium impact from such instability
                                                                                                               the resultant risk would be Low as per AGS 2007.




                                                                                                               The likelihood of a deep failure through the medium
                                                                                                               dense (or denser) natural sand below the proposed
              2: Deep failure through the                                                                      foundation depth is assessed as Rare due to the lack of
             medium dense (or denser) sands                 Rare              Major               Low          precedence of such movements locally, no signs of any
             below the foundation depth.                                                                       existing slope instability and a lack of groundwater.
                                                                                                               Although the consequence of such a failure would be
                                                                                                               Major, the resultant risk is Low as per AGS 2007.




             24 February 2023
             Report No. 22484-001-Rev0                                                 10
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 17

                                                  PROPOSED RENOVATIONS
                                                  2 ARAKOON CRESCENT, SUNSHINE BEACH


                                                                                    The likelihood of a slip/failure of a temporary retention
                                                                                    system (sheet pile wall, or similar) as outlined in Section
                                                                                    6.3, is assessed as Rare, subject to detailed design by a
                                                                                    suitably qualified RPEQ, which accounts for the required
                                                                                    factors of safety against slope instability, and construction
              3: Instability of temporary sheet                                     by a specialist contractor. Although the consequence of
             pile retention system, or similar,     Rare    Major         Low       such a failure could be Major, the resultant risk is Low as
             as discussed in Section 6.3.                                           per AGS2007.

                                                                                    Note that this assessment relates to the construction of a
                                                                                    new temporary retaining wall between the upper and lower
                                                                                    levels of the building. No assessment has been made of
                                                                                    any elements in loco within the existing structure.



            The potential impacts on slope stability of the development components have been assessed, and the
            measures recommended below in Section 4 have been designed to mitigate those impacts.

            5.2.1         Quantitative Assessment
            In order to estimate the factor of safety (FOS) against slope instability for the proposed development,
            numerical analysis has been conducted using Slope/W. The ground surface profile has been modelled using
            a combination of architectural layout drawings, survey information, NC interacting mapping and slope angles
            measured in the field by Tectonic. The analysed subsurface profile was compiled based on the results of the
            ASI boreholes and our subsurface investigation. Some inferences regarding subsurface conditions were
            made between test locations, particularly across the western part of the site which is occupied by the existing
            building. A minimum FOS value of 1.5 is the commonly adopted industry standard for long term conditions.

            Considering the steep gradients to the eastern edge of the site, and the presence of loose sands; the
            stability of the existing high dune slope is considered marginal. The slope is probably held in place by the
            stabilising effects of negative soil pore pressures and shallow root systems. Any disturbance to the lower
            part of the dune slope, such as erosion by high seas, could lead to larger scale instability.

            Modelling considered a hypothetical storm and wave scenario nominated by coastal engineering experts
            RHDHV, which included a combination of short-term erosion from a 500-year average recurrence interval
            storm event and shoreline recession due to sea level rise for the 2100 climate extreme event scenario.
            Section 7 of the coastal erosion assessment indicates that the existing house site and proposed
            development is not likely to be impacted by beach erosion under this scenario. In accordance with
            previously adopted practices along the Sunshine Beach coastal strip, a 28° line was modelled from the
            current dune toe which does not intersect the eastern boundary or proposed development area. Text Figure
            11 overleaf illustrates our geological model of the site including the extreme storm and wave scenario
            nominated by RHDV and the 28° line from the high dune toe.




             24 February 2023
             Report No. 22484-001-Rev0                              11
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 18

                                           PROPOSED RENOVATIONS
                                           2 ARAKOON CRESCENT, SUNSHINE BEACH




            Text Figure 11: Geological model of the site and high dune, including extreme storm event scenario

            Although the extreme storm case does not appear to impact the subject site, and an applied 28 line from the
            dune toe does not intersect the ground surface, to assess the FOS against instability for the proposed
            development numerical modelling has been undertaken considering the existing dune slope.

            A surcharge load of 5 kPa was applied across the site and crest of the dune to the eastern boundary to
            replicate future landscaping. Building loads for the proposed residence and ancillary structures will be
            transferred by a piled footing system into the natural medium dense (or denser) sands at depth and will not
            surcharge the ground surface, thus have not been included in the models.

            Soil shear strength was based upon effective parameters which were estimated based on our interpretation
            of the subsurface investigation results, while also considering the values recommended for similar materials
            in Appendix D of Australian Standard AS4678-2002 Earth Retaining Structures. Adopted soil parameters
            are shown on the Slope/W output presented in Text Figure 12 overleaf. Analysis was undertaken for a
            specified range of entry and exit points that could impact the proposed development.




             24 February 2023
             Report No. 22484-001-Rev0                                12
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 19

                                          PROPOSED RENOVATIONS
                                          2 ARAKOON CRESCENT, SUNSHINE BEACH




            Text Figure 12: Slope/W output for the proposed development

            Our analysis indicates that stability of the site hinges on the temporary and permanent retention systems.
            Provided that footings for the residence and structural walls are founded at least 1 m into medium dense (or
            denser) sands, and the existing timber sleeper wall to the east of the residence is replaced with a new
            engineer designed and certified structure founded on shear piles, the required minimum FOS for long-term
            stability (i.e. 1.5) could be achieved.

            Our limit equilibrium modelling indicates that relatively conventional building piles could be adopted for the
            proposed development generally; however, piles socketed at least 1 m into medium dense (or denser) sand
            designed with an unfactored shear force resistance of 100 kN/m (or equivalent) will be required beneath the
            new retaining wall to the east of the residence. It should be noted that required shear and bending
            resistance of the piles and their depth should be determined by inite element analyses based on all relevant
            loads including from structures (not included in our Slope/W modelling) and all soil, fill and landscaping
            loads. To facilitate a larger level garden/grassed area to the east of the residence, the new retaining wall
            could be located eastwards, however not beyond the current dune crest.

            Subject to implementation of the recommendations made in Section 6 during building works, there would be
            a Low Risk of slope instability affecting the proposed development.
            It should be noted that this modelling addresses the global stability of the proposed works; however, the
            stability of the retaining walls must be addressed by others as part of detailed design.




             24 February 2023
             Report No. 22484-001-Rev0                              13
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 20

                                          PROPOSED RENOVATIONS
                                          2 ARAKOON CRESCENT, SUNSHINE BEACH

            6.0        GEOTECHNICAL RECOMMENDATIONS
            6.1        Earthworks
            Excavations for the lower level and new garage are anticipated to range up to about 2 m deep. Isolated
            relatively deep excavations may be required for underground services and footings or other specific
            elements. Filling less than 1 m high is anticipated to form final levels, with filling to the east of the residence
            limited to landscaping only, which should not exceed 0.5 m high.
            The advice give herein should be treated as preliminary to aid in project planning, and Tectonic must review
            detailed design drawings for the residence prior to construction.

            6.1.1         Site Preparation and Trafficability
            Following clearing of existing vegetation, any tree stumps and large roots should be ‘grubbed out’. Any
            organic rich topsoil or uncontrolled fill should then be stripped away from at grade or building subgrades and
            set aside. Similarly, all footings and remaining structural elements from the existing residence should be
            removed and ‘grubbed out.’ Based on the ASI boreholes and site observations, stripping depths to remove
            existing unsuitable upper soils should be relatively shallow however, deeper areas of unsuitable materials
            may be present across the site, particularly related to the existing structures (e.g. retaining wall backfill,
            service trenches, footing excavations). Topsoil materials must not be used in structural fill; however, may be
            placed across landscaping areas.

            It should be noted that compaction of such relatively ‘clean’ sands as structural fill requires the addition of
            substantial volumes of water (‘flooding’) combined with the use of vibratory compaction equipment (typically
            a vibrating plate). Care must be taken with the use of vibratory equipment (e.g. compactors or sheet piling)
            to ensure that there are no adverse impacts on surrounding structures. The impacts from ground vibration
            must be closely monitored and managed during construction. It would be prudent to conduct a dilapidation
            survey of neighbouring structures prior to commencement of construction; and furthermore it is
            recommended that a suitably qualified and experienced civil/structural RPEQ is engaged to provide a
            vibration management plan for the proposed construction works. Our preliminary recommendation would be
            that allowance is made for equipment and works such that the peak particle velocity does not exceed
            10 mm/s, where measured at the property boundary.

            The exposed natural subgrade following excavations will likely be in a loose condition and must be
            compacted by several passes of a vibrating plate or minimum 4 tonne vibrating smooth drum roller, in
            conjunction with surface application of ample water, to achieve the required compaction.
            Due to the potential for development of poor trafficability during construction, placement of a minimum
            150 mm thick granular working platform may be required across laydown areas. Specific platform design
            would be required prior to mobilisation and trafficking of any heavy mobile plant on the site (e.g. mobile
            cranes, concrete pumps or piling rigs).

            Due to the highly permeable nature of the sands at this site, stormwater is expected to rapidly infiltrate the
            ground, making un-sealed surface drainage ineffective for the control of flows. Any sealed areas should be
            graded to ensure free drainage of stormwater away from construction areas, and to a control point(s).

            6.1.2         Excavations
            Excavations through the soils should be achievable using conventional earthmoving plant (e.g. small or
            larger excavators with toothed buckets). Temporary unsurchaged cuts in the very loose to loose sand could
            be formed at 1V:2H, and at 1V:1.5H in medium dense (or denser) sand, for batters up to 3 m in height. Flatter
            batters or temporary retention may be required if groundwater seepage is encountered or if sloughing of dry
            sand occurs at the batter surface. Deeper cuts, if required, will require temporary shoring, unless assessed
            and approved by Tectonic during construction.

            Permanent cuts or fills greater than 1 m must be retained. Permanent cut and fill batters up to 1 m high shall
            not exceed 1V:2.5H. Any permanent soil and fill batters will require erosion protection (e.g. revegetation or
            surface protection). Similarly, improvements to the vegetation (i.e. with endemic native species) on the
            natural high dune face downslope of the residence would aid in restricting the development initial surficial
            failures.


             24 February 2023
             Report No. 22484-001-Rev0                               14
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 21

                                          PROPOSED RENOVATIONS
                                          2 ARAKOON CRESCENT, SUNSHINE BEACH

            It is likely that the above temporary batter slopes will not be able to be achieved, at least along the western
            boundary, due to spatial restraints, and so temporary shoring may be required (e.g. sheet piles) as per the
            recommendations in Section 6.3 below. Excavations in close proximity to existing structures and
            infrastructure (e.g. underground services), including on neighbouring properties, will need to be specifically
            designed to prevent undermining. It is recommended that footing exposures or confirmation of existing
            foundations via certified building plans be undertaken to assess the possibility of undermining. If
            undermining is a potential issue the existing structures may need to be underpinned or excavations may
            require temporary shoring.
            The advice of a suitably qualified and experienced structural RPEQ must be sought regarding any potential
            undermining and design and construction of any underpins/temporary shoring (if required).

            The above recommendations do not supersede any existing safety regulations or legislation applicable to
            excavations (e.g. limits on personnel entry into trenches).

            6.1.3         Filling
            The natural sandy soils where free of deleterious materials (e.g. vegetation, organics etc.) may be reused as
            structural fill (retained under the building), subject to appropriate moisture adjustment. It should be noted that
            compaction of such relatively ‘clean’ sands as structural fill requires the addition of substantial volumes of
            water (‘flooding’) combined with the use of vibratory compaction equipment (typically a smooth drum roller or
            heavy vibrating plate). Should importation of fill be required, it is recommended that such fill should comply
            with the following:

                     Minimum CBR of 10 %
                     Maximum plasticity index of 15 %
                     Shrink-swell index ≤ 1 %
                     Maximum particle size of 100 mm

            The primary recommendation would be to re-use site won material, or use a similar granular soil where
            import is required. Any fill should be compacted at moisture contents within the range of ±2 % of optimum
            moisture content for Standard Compaction. Fill material should be placed in 250 mm thick (loose thickness)
            layers and be compacted by repeated rolling using a minimum 4 tonne smooth drum roller (or equivalent,
            with vibration on if safe to do so) to achieve a dry density ratio of at least 95 % of the maximum Dry Density
            Ratio (DDR), based upon the Standard Compaction method, or a Dry Density Index of at least 70 %.

            Confirmatory compaction testing must be carried out at regular intervals. A minimum of two tests per vertical
            lift is recommended where structural fill heights are to exceed 300 mm. Further details for control and testing
            of fill are given in Australian Standard AS 3798-2007 Guidelines on Earthworks for Commercial and
            Residential Developments.

            6.2         Building Foundations
            6.2.1         Indicative Site Classification
            Site classifications for footing design are determined in accordance with AS 2870-2011 Residential Slabs and
            Footings, and depend on the depth of cut / fill undertaken at a site, variations in the natural soil/rock depths,
            and the reactivity of the in situ soil / rock and any imported fill materials.

            Based on the results of the investigation, the site is classified as Class P in accordance with AS 2870-2011
            Residential Slabs and Footings, due to the presence of poor bearing capacity soils at shallow depths, and
            trees. If not for these factors, the site would have the characteristics of Class S, with the estimated
            characteristic surface movements (‘ys’) ranging up to about 20 mm. However, due to the potential variability
            in subgrade density a site classification of Class M is recommended in relation to assessment of flexibility
            requirements for ground slabs, footing and plumbing design.




             24 February 2023
             Report No. 22484-001-Rev0                              15
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 22

                                          PROPOSED RENOVATIONS
                                          2 ARAKOON CRESCENT, SUNSHINE BEACH

            6.2.2         Footing Design
            Should any of the existing structural elements remain, the residence and ancillary structures must not exert
            additional load on these elements, unless assessed and approved by a structural RPEQ, who must also
            confirm the existing footings and structural members have sufficient capacity to carry additional loads
            imposed by the development.
            No design loadings were available at the time of reporting. Footings for the proposed residence and any
            ancillary structures (e.g. retaining walls, pool etc.) must penetrate through any fill materials and unsuitable
            natural soils (i.e. very loose to loose sands) to found at least 1 m into medium dense (or denser) natural
            sands. High-level footings may be possible in areas of deeper excavation if medium dense (or denser) sands
            are exposed at or near the subgrade. This would be subject to an assessment by a suitably qualified and
            experienced geotechnical RPEQ. High-level footings, so founded, could be designed using a maximum
            allowable bearing pressure of 100 kPa.
            Elsewhere, based on the ASI boreholes, pile founding depths between about 4 m and 5 m BGL (existing
            ground levels) are anticipated. Deeper pile depths may be necessary subject to assessment of building loads
            at the detailed design stage. To confirm founding depths, deeper borehole drilling should be undertaken
            following partial or complete demolition of the existing structures to assess subsurface conditions in the
            eastern part of the site.
            Excluding the eastern retaining wall, steel screw piles are considered to be an appropriate footing option for
            the proposed development. For the eastern boundary retaining wall to achieve the required unfactored shear
            resistance of 100 kN/m it is envisaged that steel reinforced concrete bored piles or grout-injected CFA piles
            (or similar) will be required. Steel reinforced concrete bored piles would require the use of sacrificial liners
            (e.g. Formatube) to prevent caving of the upper sands. Construction water loss would also need to be
            carefully monitored and controlled should CFA piles be adopted. The capacity of the piles to achieve this
            shear capacity or an equivalent amount should be checked as part of the structural design (lateral capacity).

            If steel screw piles are adopted for the main residence and internal walls, it will be important to ensure close
            supervision of installation, as piling may not encounter sufficient drilling resistance (from torque
            measurement) in sands at the suggested founding depth, and piles could extend to much greater depth than
            necessary.
            It is therefore recommended that site specific static load testing be conducted from screw piles, if adopted, at
            a minimum. Where tension or compression capacity developed in the footings is critical for the future
            structure (e.g. resistance to uplift forces from high winds), then cyclic load tests (including measurement of
            deflections under tension and compression cycles) should also be undertaken prior to construction.
            Kentledge for static testing, or simulated cyclic loads, should prove the piles to a minimum of two times the
            expected working load within tolerable deflections.

            Ultimately, the advice of a specialist piling contractor should be sought regarding pile design and
            construction. However, where steel screw piles are adopted site specific load testing and the results of this
            geotechnical investigation should be considered by the structural engineers in validating any generic torque
            to capacity ratios provided as part of the proposed design. An assessment of potential vibration effects on
            nearby structures and monitoring requirements should also be included.

            Footing design should also account for potential soil reactivity to be equivalent to Class M. It should be noted
            that the placement of reactive clay may result in a more significant equivalent site classification, such as Class
            H1 (or higher).
            All footings should found such that they are not adversely affected by any adjacent excavations, batter slopes,
            trenches, or retaining walls that are not designed to support building loads. Footings adjacent to any fill batter
            crests should be deepened to found below the toe of the batter. Footings should found at least below a plane
            extending 1 m horizontally from the base of trenches/underground services/excavations/retaining walls, then
            rising up at 1V:1H, as illustrated in Text Figure 13 overleaf.




             24 February 2023
             Report No. 22484-001-Rev0                              16
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 23

                                           PROPOSED RENOVATIONS
                                           2 ARAKOON CRESCENT, SUNSHINE BEACH




            Text Figure 13: Footing depth required to prevent undermining

            Site drainage should be designed to readily remove surface water and to prevent ponding of water on
            subgrade areas during construction and also adjacent to foundations and perimeter slabs once construction
            is completed.

            It is recommended that footings be inspected by a suitably qualified and experienced RPEQ prior to
            placement of steel reinforcement and pouring of concrete to confirm allowable bearing pressures and
            cleanliness of excavations.

            If any soil conditions encountered during construction are found to differ from those noted in the geotechnical
            investigation, Tectonic and ASI should be notified immediately and an inspection carried out to determine if
            changes to footing design are required.

            6.3         Temporary and Permanent Retention
            Excavations are anticipated to range up to about 2 m deep. Due to the close proximity to the property
            boundaries, existing structures that are to remain, and surrounding infrastructure, some form of temporary
            shoring may be required.

            Based upon our experience with similar sites, we anticipate that temporary shoring may be achieved by use
            of sheet piles, however Unitywater and Noosa Council requirements for the existing infrastructure may
            restrict the use of sheet piles. Shoring of deeper cuts may require lateral restraint, and this is conventionally
            achieved by helical steel anchors (similar to screw piles). However, the proximity to neighbouring properties
            would require permissions to be obtained for subterranean access. Therefore, where lateral support by
            cantilever only is not feasible, it is suggested that internal struts/propping be considered to provide lateral
            restraint for the shoring system.

            Anchored or propped sheet piles may require pre-drilling to prevent adverse vibrations during sheet pile
            installation.

            Other shoring methods that could be considered include bored contiguous or secant piles. Non-contiguous
            or soldier pile walls are not feasible for the proposed development due to the likelihood that loose sands
            would ‘flow’ through gaps between the piles.

            An advantage of contiguous or secant pile wall retention systems is that they are ultimately used for the
            permanent walls, whereas sheet piles would be temporary to provide retention during construction only,
            therefore requiring a permanent structural wall to be constructed. Bored pile walls generally require greater
            width (horizontally) for installation as compared to sheet piles and are often more expensive.

            The advice of a specialist shoring contractor must be sought regarding feasibility, design and installation of
            the proposed retention system. It will be necessary to conduct numerical analysis to optimise the retention


             24 February 2023
             Report No. 22484-001-Rev0                                17
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 24

                                             PROPOSED RENOVATIONS
                                             2 ARAKOON CRESCENT, SUNSHINE BEACH

            system. Detailed design will also need to account for relevant factors of safety to maintain the temporary
            and long-term stability of the retention system.

            Retaining structures greater than 1 m high, or those required to support surcharge loads or sloping backfill,
            will require engineer design and certification of construction. Retaining wall design should be carried out in
            accordance with AS4678-2002 Earth retaining structures.

            Design for temporary and permanent retaining structures could be carried out using a trapezoidal (for
            propped or anchored walls) pressure distribution applicable to the wall type and based on the parameters
            listed in Table 3. These values do not include allowance for hydrostatic pressures, backslopes (assumed to
            be horizontal), nor transient (e.g. construction) or adjacent footing loadings.
            Table 3: Retaining Structure Design Parameters
                                                                                  Lateral earth pressure coefficients
                                           Unit
                                                      Friction
              Retained material           weight
                                                      angle (°)            Ka                        Ko
                                          (t/m3)                                                                        Kp
                                                                    (Cantilever wall)        (Non-yielding wall)

              Very Loose/ Loose
                                            1.8           27               0.38                     0.55                2.66
              Sands


              Medium Dense Sands            1.9           34               0.28                     0.44                3.54


              Dense (or Denser)
                                            1.9           36               0.26                     0.41                3.85
              Sands


              Future Controlled Fill*        *            *                   *                       *                  *

            Note:     * Depends on fill material type and level of compaction.

            As a minimum, retaining structures must be founded as per the recommendations in Section 6.2.2 above
            with the footings also designed to account for lateral loads imposed by the retaining wall. Detailed design
            must include an assessment of internal and global stability, together with required bearing capacity and
            founding depth, by the retaining wall design engineer.

            6.4         Drainage
            Surface diversion drainage should be constructed above the crest of any new cut or fill embankment or
            retaining walls (e.g. grassed or landscaped swales or diversion mounds). Adequate site drainage must be
            installed to ensure that stormwater runoff is directed away from building walls, footings, batters and retaining
            walls.

            Although unlikely, if groundwater seepage is encountered during excavations, Tectonic must be notified to
            assess the impact on stability.

            Subsurface drainage must be installed behind any retaining walls (e.g. slotted ‘aggi’ pipe wrapped in filter
            ‘sock’ placed in gravel backfill). Depending on matters such as the extent of drainage installed and site-
            specific groundwater conditions, the designer must make an assessment of hydrostatic pressure to be
            accounted for in the design of the retaining structure. It is assumed that the pool floor will include a
            hydrostatic pressure relief valve. The outlet pipe from this valve must be taken to ‘daylight’ at the ground
            surface.
            All collected roof water should be directed by pipes to the council stormwater system along The Esplanade
            (e.g. through the use of a ‘wet’ or ‘charged’ drainage system) or, where not physically possible, surface
            water should be directed to infiltrate into the ground around the edges of hard surfaces, with infiltration
            areas set back as far as possible from the crest of the dune slope. Hydraulic design should be such that
            under no circumstances are uncontrolled stormwater flows permitted over the dune face; where channelised
            erosion and scour features could develop.



             24 February 2023
             Report No. 22484-001-Rev0                                   18
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 25

                                           PROPOSED RENOVATIONS
                                           2 ARAKOON CRESCENT, SUNSHINE BEACH

            To reduce the likelihood of further scouring and undermining of the site, we recommend the following
            regarding the scour in the south-eastern part of the site (Ref. Section 4.6):
                     If possible, diversion drainage should be upgraded/constructed upslope of the area to ensure
                      stormwater flows, including from the road, are diverted away from the high dune face and ideally into
                      the existing stormwater infrastructure along The Esplanade. Diversion drainage should not
                      discharge directly onto the surrounding dune slope which may create new scour issues elsewhere.

                     The scour should be reinstated with a cellular confinement system (e.g. ‘MiraCell’, gabions, reno
                      mattress, or similar) and rock fill appropriate to the chosen system. It will be important to undertaken
                      hydraulic analyses to confirm the estimated stormwater flow rates and suitability of the chosen
                      confinement system and rock fill type.

            Design of the stormwater system should be undertaken by a suitably qualified and experienced civil RPEQ.


            7.0        CONCLUSION
            Based on the findings of our assessment it is concluded that a Low Risk of slope instability could be
            achieved for the proposed development, subject to the following:

                     Implementation of the recommendations given in this report to prepare the preliminary design;
                     Review of the preliminary detailed design by Tectonic to confirm compliance with the
                      recommendations herein; and
                     Installing a new engineer designed and certified retaining structure supported on piles founded at
                      least 1 m into medium dense (or denser) sand, designed to accommodate an unfactored shear
                      resistance of 100 kN/m, along the eastern edge of the level area to the east of the residence.



            8.0        LIMITATIONS
            This assessment relates only to the proposed building development at the site. Slopes outside the
            proposed development area may be subject to risk of slope instability, but assessment of those matters
            was beyond the scope of our commission.

            Your attention is drawn to the document Limitations, which is included in Appendix C of this report. The
            statements presented in this document are intended to advise you of what your realistic expectations of this
            report should be, and to present you with recommendations on how to minimise the risks associated with the
            services provided by Tectonic for this project.




             24 February 2023
             Report No. 22484-001-Rev0                              19
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 26

                                                                                                       Tectonic Geotechnical Pty Ltd
                                                                                                       PO Box 899
                                                                                                       Buderim Qld 4556
                                                                                                       Office: 07 5478 9016
                                                                                                       Email: [email protected]

                                                                                            PROJECT:

                                                                 Subject site               GEOTECHNICAL INVESTIGATION
                                                                                            2 ARAKOON CRESCENT
                                                                                            SUNSHINE BEACH
                                                       BH2
                                                                                            TITLE:


                                                   DCP1                                     SITE PLAN
                                                                 DCP2
                                                                                DCP3        CLIENT:

                                                 BH1                                        CHRISTOPHER KELLY
                                                                                       A’

                                                                                            DRAWN:                     DATE:

                                                                                            MCC                        23/02/2023

                                                                                            CHECKED:                   DATE:

                                                                                            ACD                        23/02/2023

                                                                                            SCALE:
                                                                                            AS SHOWN (APPROX.)
                                                                                            LEGEND:


                                                                                                       APPROX. STAND-ALONE DCP
                                                                                                       LOCATION

                                                                                                       APPROX. ASI BOREHOLE
                                                                                                       LOCATIONS

                                                                                                       APPROX. SLOPE/W SECTION




            Notes
                                                                                                                     FIGURE:
            1. Based plan courtesy of Noosa Council Intra-Maps, dated 2019                  PROJECT NO.:                                  REV:

                                                                                                 22484                      1               0


Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 27

                                             PROPOSED RENOVATIONS
                                             2 ARAKOON CRESCENT, SUNSHINE BEACH




                 APPENDIX A
                 DCP Reports




                 24 February 2023
                 Report No. 22484-001-Rev0




Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 28

                                                                                                                                                                                                                     CLIENT      : Christopher Kelly                                                                                                                           SHEET           : 1 OF 1
                                                                                                                                                                                                                     CONTRACTOR :
                                                                                                                                                                                                                     PROJECT     : Proposed Renovations
                                                                                                                                                                                                                     LOCATION    : 2 Arakoon Crescent, Sunshine Beach
                                                                                                                                                                                                                     PROJECT No. : 22484

                                                                                                                                                                                                                                                                     TEST: DCP1                                                      TEST: DCP2                                                      TEST: DCP3
                                                                                                                                                                                                                                  LOGGED: LM 5/12/2022 CHECKED: MCC                               LOGGED: LM 5/12/2022 CHECKED: MCC                               LOGGED: LM 5/12/2022 CHECKED: MCC
                                                                                                                                                                                                                                  EASTING: 511274.0 m NORTHING: 7079780.0 m                       EASTING: 511287.0 m NORTHING: 7079794.0 m                       EASTING: 511314.0 m NORTHING: 7079791.0 m
                                                                                                                                                                                                                                  MGA2020 Zone 56                                                 MGA2020 Zone 56                                                 MGA2020 Zone 56
                                                                                                                                                                                                                      Depth (m)




                                                                                                                                                                                                                                                                                      Depth (m)




                                                                                                                                                                                                                                                                                                                                                      Depth (m)
                                                                                                                                                                                                                                        Blows per 100 mm (AS 1289.6.3.2-1997)                           Blows per 100 mm (AS 1289.6.3.2-1997)                           Blows per 100 mm (AS 1289.6.3.2-1997)
                                                                                                                                                                                                                                  0        5         10      15         20      25                0        5         10      15         20      25                0        5         10      15         20      25

                                                                                                                                                                                                                                      HW to 0.7 m                                                     HW to 0.8 m                                                     HW to 0.2 m




                                                                                                                                                                                                                     0.5                                                             0.5                                                             0.5




                                                                                                                                                                                                                     1.0                                                             1.0                                                             1.0




                                                                                                                                                                                                                     1.5                                                             1.5                                                             1.5
                                                                                                                                                                                                                                                                                                                                                                      >20




                                                                                                                                                                                                                     2.0                                                             2.0                                                             2.0
           TECTONIC 3.00.2 LIB.GLB Log IS DCP 3 PER PAGE 22484.GPJ <<DrawingFile>> 23/2/2023 11:01 10.02.00.04 Datgel Lab and In Situ Tool - DGD | Lib: Tectonic 3.00.2 2021-03-30 Prj: Tectonic 3.00.2 2021-03-30




                                                                                                                                                                                                                     2.5                                                             2.5                                                             2.5




                                                                                                                                                                                                                     3.0                                                             3.0                                                             3.0




                                                                                                                                                                                                                                                                                                      >20

                                                                                                                                                                                                                     3.5                                                             3.5                                                             3.5




                                                                                                                                                                                                                     4.0                                                             4.0                                                             4.0




                                                                                                                                                                                                                     4.5                                                             4.5                                                             4.5



                                                                                                                                                                                                                                      >14



                                                                                                                                                                                                                     5.0                                                             5.0                                                             5.0




                                                                                                                                                                                                                       Comments                                                       Comments                                                        Comments
                                                                                                                                                                                                                       HW - Hammer Weight                                             HW - Hammer Weight                                              HW - Hammer Weight




Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 29

                                             PROPOSED RENOVATIONS
                                             2 ARAKOON CRESCENT, SUNSHINE BEACH




                 APPENDIX B
                 AGS Guidelines - Qualitative Terminology for Use in
                 Assessing Risk to Property
                 Some Guidelines for Hillside Construction




                 24 February 2023
                 Report No. 22484-001-Rev0




Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 30

                                                     PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
                                                                             APPENDIX C: LANDSLIDE RISK ASSESSMENT
                                                   QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY


                QUALITATIVE MEASURES OF LIKELIHOOD

            Approximate Annual Probability
                                                            Implied Indicative Landslide
                                                                                                                                    Description                                           Descriptor               Level
             Indicative            Notional                    Recurrence Interval
               Value               Boundary
                10-1                    5x10-2
                                                             10 years                           The event is expected to occur over the design life.                                ALMOST CERTAIN                   A
                                                                                   20 years     The event will probably occur under adverse conditions over the
                     -2
                10                                        100 years
                                                                                                design life.
                                                                                                                                                                                    LIKELY                           B
                                           -3
                   -3                5x10                                       200 years
                10                                        1000 years                            The event could occur under adverse conditions over the design life.                POSSIBLE                         C
                                     5x10-4                                     2000 years
                                                                                                The event might occur under very adverse circumstances over the
                10-4                                     10,000 years
                                                                                                design life.
                                                                                                                                                                                    UNLIKELY                         D
                   -5                5x10-5                                     20,000 years
                10                                                                              The event is conceivable but only under exceptional circumstances
                                                        100,000 years                                                                                                               RARE                             E
                                                                                                over the design life.
                   -6                 5x10-6                                    200,000 years
                10                                     1,000,000 years                          The event is inconceivable or fanciful over the design life.                        BARELY CREDIBLE                  F
                Note:     (1)     The table should be used from left to right; use Approximate Annual Probability or Description to assign Descriptor, not vice versa.


                QUALITATIVE MEASURES OF CONSEQUENCES TO PROPERTY

               Approximate Cost of Damage
                                                                                                              Description                                                                 Descriptor               Level
             Indicative                Notional
               Value                   Boundary
                                                        Structure(s) completely destroyed and/or large scale damage requiring major engineering works for
                200%                                                                                                                                                               CATASTROPHIC                      1
                                                        stabilisation. Could cause at least one adjacent property major consequence damage.
                                       100%
                                                        Extensive damage to most of structure, and/or extending beyond site boundaries requiring significant
                60%                                                                                                                                                                MAJOR                             2
                                                        stabilisation works. Could cause at least one adjacent property medium consequence damage.
                                        40%
                                                        Moderate damage to some of structure, and/or significant part of site requiring large stabilisation works.
                20%                                                                                                                                                                MEDIUM                            3
                                                        Could cause at least one adjacent property minor consequence damage.
                                        10%
                 5%                     1%              Limited damage to part of structure, and/or part of site requiring some reinstatement stabilisation works.                 MINOR                             4
                                                        Little damage. (Note for high probability event (Almost Certain), this category may be subdivided at a
                0.5%                                                                                                                                                               INSIGNIFICANT                     5
                                                        notional boundary of 0.1%. See Risk Matrix.)
                Notes:    (2)     The Approximate Cost of Damage is expressed as a percentage of market value, being the cost of the improved value of the unaffected property which includes the land plus the
                                  unaffected structures.
                          (3)     The Approximate Cost is to be an estimate of the direct cost of the damage, such as the cost of reinstatement of the damaged portion of the property (land plus structures), stabilisation
                                  works required to render the site to tolerable risk level for the landslide which has occurred and professional design fees, and consequential costs such as legal fees, temporary
                                  accommodation. It does not include additional stabilisation works to address other landslides which may affect the property.
                          (4)     The table should be used from left to right; use Approximate Cost of Damage or Description to assign Descriptor, not vice versa


                                                                                   Australian Geomechanics Vol 42 No 1 March 2007
             Form No. 68039
               68039        RL2Risk
                      Landslide August 2010
                                    Management Issued 10/7/07
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 31

                                                     PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
                          APPENDIX C: – QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY (CONTINUED)


                QUALITATIVE RISK ANALYSIS MATRIX – LEVEL OF RISK TO PROPERTY
                                  LIKELIHOOD                                                  CONSEQUENCES TO PROPERTY (With Indicative Approximate Cost of Damage)
                                                        Indicative Value of        1: CATASTROPHIC                 2: MAJOR                3: MEDIUM                4: MINOR                    5:
                                                       Approximate Annual                200%                         60%                      20%                     5%                INSIGNIFICANT
                                                           Probability                                                                                                                        0.5%
          A –     ALMOST CERTAIN                                10-1                         VH                         VH                      VH                       H                   M or L (5)
                                                                  -2
          B -     LIKELY                                        10                           VH                         VH                       H                       M                       L
          C -     POSSIBLE                                      10-3                         VH                          H                       M                       M                      VL

          D -     UNLIKELY                                      10-4                          H                         M                        L                       L                      VL
                                                                  -5
          E -     RARE                                          10                            M                          L                       L                      VL                      VL
                                                                  -6
          F -     BARELY CREDIBLE                               10                            L                         VL                      VL                      VL                      VL
                Notes:    (5)     For Cell A5, may be subdivided such that a consequence of less than 0.1% is Low Risk.
                          (6)     When considering a risk assessment it must be clearly stated whether it is for existing conditions or with risk control measures which may not be implemented at the current
                                  time.


                RISK LEVEL IMPLICATIONS
                                       Risk Level                                                                                Example Implications (7)
                                                                              Unacceptable without treatment. Extensive detailed investigation and research, planning and implementation of treatment
                   VH                         VERY HIGH RISK                  options essential to reduce risk to Low; may be too expensive and not practical. Work likely to cost more than value of the
                                                                              property.
                                                                              Unacceptable without treatment. Detailed investigation, planning and implementation of treatment options required to reduce
                    H                               HIGH RISK
                                                                              risk to Low. Work would cost a substantial sum in relation to the value of the property.
                                                                              May be tolerated in certain circumstances (subject to regulator’s approval) but requires investigation, planning and
                    M                         MODERATE RISK                   implementation of treatment options to reduce the risk to Low. Treatment options to reduce to Low risk should be
                                                                              implemented as soon as practicable.
                                                                              Usually acceptable to regulators. Where treatment has been required to reduce the risk to this level, ongoing maintenance is
                    L                               LOW RISK
                                                                              required.
                                                                              Acceptable. Manage by normal slope maintenance procedures.
                    VL                        VERY LOW RISK

                  Note:   (7)     The implications for a particular situation are to be determined by all parties to the risk assessment and may depend on the nature of the property at risk; these are only
                                  given as a general guide.




                                                                                   Australian Geomechanics Vol 42 No 1 March 2007
             Form No. Landslide
                68039 68039 RL2Risk
                                August 2010
                                    Management             Issued 10/7/07
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 32

                  PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007



                        APPENDIX G - SOME GUIDELINES FOR HILLSIDE CONSTRUCTION

                                 GOOD ENGINEERING PRACTICE                                                            POOR ENGINEERING PRACTICE
             ADVICE
             GEOTECHNICAL        Obtain advice from a qualified, experienced geotechnical practitioner at early       Prepare detailed plan and start site works before
             ASSESSMENT          stage of planning and before site works.                                             geotechnical advice.
             PLANNING
             SITE PLANNING       Having obtained geotechnical advice, plan the development with the risk              Plan development without regard for the Risk.
                                 arising from the identified hazards and consequences in mind.
             DESIGN AND CONSTRUCTION
                                 Use flexible structures which incorporate properly designed brickwork, timber        Floor plans which require extensive cutting and
                                 or steel frames, timber or panel cladding.                                           filling.
               HOUSE DESIGN
                                 Consider use of split levels.                                                        Movement intolerant structures.
                                 Use decks for recreational areas where appropriate.
             SITE CLEARING       Retain natural vegetation wherever practicable.                                      Indiscriminately clear the site.
                 ACCESS &        Satisfy requirements below for cuts, fills, retaining walls and drainage.            Excavate and fill for site access before
                DRIVEWAYS        Council specifications for grades may need to be modified.                           geotechnical advice.
                                 Driveways and parking areas may need to be fully supported on piers.
             EARTHWORKS          Retain natural contours wherever possible.                                           Indiscriminatory bulk earthworks.
                                 Minimise depth.                                                                      Large scale cuts and benching.
                   CUTS          Support with engineered retaining walls or batter to appropriate slope.              Unsupported cuts.
                                 Provide drainage measures and erosion control.                                       Ignore drainage requirements
                                 Minimise height.                                                                     Loose or poorly compacted fill, which if it fails,
                                 Strip vegetation and topsoil and key into natural slopes prior to filling.           may flow a considerable distance including
                                 Use clean fill materials and compact to engineering standards.                       onto property below.
                   FILLS         Batter to appropriate slope or support with engineered retaining wall.               Block natural drainage lines.
                                 Provide surface drainage and appropriate subsurface drainage.                        Fill over existing vegetation and topsoil.
                                                                                                                      Include stumps, trees, vegetation, topsoil,
                                                                                                                      boulders, building rubble etc in fill.
               ROCK OUTCROPS     Remove or stabilise boulders which may have unacceptable risk.                       Disturb or undercut detached blocks or
                & BOULDERS       Support rock faces where necessary.                                                  boulders.
                                 Engineer design to resist applied soil and water forces.                             Construct a structurally inadequate wall such as
                                 Found on rock where practicable.                                                     sandstone flagging, brick or unreinforced
                RETAINING
                                 Provide subsurface drainage within wall backfill and surface drainage on slope       blockwork.
                  WALLS
                                 above.                                                                               Lack of subsurface drains and weepholes.
                                 Construct wall as soon as possible after cut/fill operation.
                                 Found within rock where practicable.                                                 Found on topsoil, loose fill, detached boulders
                                 Use rows of piers or strip footings oriented up and down slope.                      or undercut cliffs.
                 FOOTINGS
                                 Design for lateral creep pressures if necessary.
                                 Backfill footing excavations to exclude ingress of surface water.
                                 Engineer designed.
                                 Support on piers to rock where practicable.
             SWIMMING POOLS      Provide with under-drainage and gravity drain outlet where practicable.
                                 Design for high soil pressures which may develop on uphill side whilst there
                                 may be little or no lateral support on downhill side.
                 DRAINAGE
                                 Provide at tops of cut and fill slopes.                                              Discharge at top of fills and cuts.
                                 Discharge to street drainage or natural water courses.                               Allow water to pond on bench areas.
                  SURFACE        Provide general falls to prevent blockage by siltation and incorporate silt traps.
                                 Line to minimise infiltration and make flexible where possible.
                                 Special structures to dissipate energy at changes of slope and/or direction.
                                 Provide filter around subsurface drain.                                              Discharge roof runoff into absorption trenches.
                                 Provide drain behind retaining walls.
                SUBSURFACE
                                 Use flexible pipelines with access for maintenance.
                                 Prevent inflow of surface water.
                                 Usually requires pump-out or mains sewer systems; absorption trenches may            Discharge sullage directly onto and into slopes.
                  SEPTIC &
                                 be possible in some areas if risk is acceptable.                                     Use absorption trenches without consideration
                  SULLAGE
                                 Storage tanks should be water-tight and adequately founded.                          of landslide risk.
                 EROSION         Control erosion as this may lead to instability.                                     Failure to observe earthworks and drainage
                CONTROL &        Revegetate cleared area.                                                             recommendations when landscaping.
               LANDSCAPING
             DRAWINGS AND SITE VISITS DURING CONSTRUCTION
                DRAWINGS         Building Application drawings should be viewed by geotechnical consultant
                SITE VISITS      Site Visits by consultant may be appropriate during construction/
             INSPECTION AND MAINTENANCE BY OWNER
                 OWNER’S         Clean drainage systems; repair broken joints in drains and leaks in supply
              RESPONSIBILITY     pipes.
                                 Where structural distress is evident see advice.
                                 If seepage observed, determine causes or seek advice on consequences.




                                          Australian Geomechanics Vol 42 No 1 March 2007                                                                113
      Form
Document     No.
           Set ID:68029 RL2 August 2010
                   22343520
Version: 1, Version Date: 16/03/2023

Page 33

                  PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007




           114                         Australian Geomechanics Vol 42 No 1 March 2007

Document   Set No.
        Form   ID: 22343520
                   68029 RL2 August 2010
Version: 1, Version Date: 16/03/2023

Page 34

                                             PROPOSED RENOVATIONS
                                             2 ARAKOON CRESCENT, SUNSHINE BEACH




                 APPENDIX C
                 Limitations




                 24 February 2023
                 Report No. 22484-001-Rev0




Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

Page 35

                                                      LIMITATIONS


       This document has been prepared for the purpose outlined in Tectonic’s proposal and no responsibility is
       accepted for the use of this document, in whole or in part, for any other purpose.

       The scope of Tectonic’s Services are as described in Tectonic’s proposal, and are subject to restrictions
       and limitations. Tectonic did not perform a complete assessment of all possible conditions or
       circumstances that may exist at the site referenced in the report. If a service is not expressly indicated, do
       not assume it has been provided. If a matter is not addressed, do not assume that any determination has
       been made by Tectonic in regards to it.

       Conditions may exist which were undetectable given that economic and time constraints limit the practical
       extent of geotechnical investigation. Variations in conditions may occur between investigation locations,
       and there may be special conditions pertaining to the site which have not been revealed by the
       investigation and which have not therefore been taken into account in the document. Where variations exist
       on site, additional studies and actions may be required.

       Tectonic’s opinions are based upon information that existed at the time that the work was performed. The
       passage of time, man-made or natural events, may alter the site conditions. It is understood that the
       Services undertaken allowed Tectonic to form an opinion of the actual conditions of the site at the time the
       site was visited and cannot be used to assess the effect of any subsequent changes in the quality of the
       site, or its surroundings, or any laws or regulations.

       Any assessments made in the preparation of this document are based on the conditions indicated from
       published sources and the findings of the investigation described. Actual subsurface conditions may differ
       from those indicated in the document (e.g. between boreholes or test pits). No warranty is included, either
       express or implied, that the actual conditions will conform exactly to the assessments contained in this
       document.

       Where data supplied by the client or other external sources, including previous site investigation data, have
       been used, it has been assumed that the information is correct unless otherwise stated. No responsibility is
       accepted by Tectonic for incomplete or inaccurate data supplied by others.

       This document is provided for the sole use by the Client and its professional advisers. No responsibility
       whatsoever for the contents of this document will be accepted to any person other than the Client. Any use
       which a third party makes of this document, or any reliance on or decisions to be made based on it, is the
       responsibility of such third parties. Tectonic accepts no responsibility for damages, if any, suffered by any
       third party as a result of decisions made or actions based on this document.




       Rev 1 (March 2016)


Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.