The ASI investigation comprised two boreholes (designated BH1 and BH2) along the eastern edge of the
existing residence. These boreholes encountered consistent subsurface conditions, summarised as
follows:
Fill – comprising loose gravelly sand and silty sand, with deleterious materials (i.e. rubbish) from
the ground surface to depths between 0.9 m and 2.1 m below ground level (BGL); then
Natural Sand – comprising loose silty sand to the borehole termination depths of 3 m BGL.
ASI continued DCP testing below the borehole termination depths which indicated that the natural sands
became medium dense below depths between 3 m and 3.6 m BGL to the DCP termination depths.
Standalone DCP testing by Tectonic along the high dune face and near the dune toe indicated the
following:
Very loose/loose sands to depths between 1.1 m and 2.3 m BGL; then
Medium dense sands to depths between 1.4 m and 4 m BGL; followed by
Dense to very dense sands with practical DCP refusal at depths between 1.6 m and 5.8 m BGL.
4.5 Groundwater
No signs of groundwater seepage (‘springs’) were observed at the ground surface during our walk-over. No
groundwater was mentioned on the ASI borehole reports, with the soils described as ‘moist’.
Groundwater conditions are expected to be reflective of prevailing weather conditions and seepage may
develop, particularly following periods of prolonged or heavy rainfall at various points through the dune
profile. Based upon experience at other similar sites in the area, such seepage would be expected to be
transient and of relatively minor lateral extent.
4.6 Surface Drainage
Surface drainage would be expected to follow natural surface gradients to the east towards the beach. The
site has a relatively small catchment, with some run-off expected to enter the site from upslope along The
Esplanade; however, most of which should be intercepted by the existing kerb along the frontage.
Given the sandy nature of the site, rainfall would normally be anticipated to infiltrate the ground surface
relatively quickly. However, as the proposed development will occupy a large part of the block, significant
run-off from hard surfaces will likely occur. Nevertheless, where directed into swales rather than pipes,
such run-off would be expected to infiltrate into the natural sands relatively rapidly.
A scour was observed in the south-eastern corner of the site, downslope of the existing residence. The
scour was estimated to be between 1 m and 2 m deep with side scarps dipping between 40° and 50°. A
coir log ‘silt sausage’ was observed above the head of the scour feature which was bulging with debris. A
PVC outlet was also observed upslope of the area which discharged directly onto the ground surface, with a
corresponding scour about 0.5 m deep. It appeared that concentrated stormwater runoff discharged into
this area, resulting in the observed scour features.
Anecdotal evidence by the owner suggests that stormwater previously discharged into the area including
from the road surface above, with works undertaken to attempt to divert the water away from the area.
Stormwater improvements are recommended in Section 6.4.
No other significant surface run-off features were noted across the allotment during our assessment.
24 February 2023
Report No. 22484-001-Rev0 8
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.