ECM_22343520_v1_Geotechnical Investigation · 132000.200173.1
PROPOSED RENOVATIONS
2 ARAKOON CRESCENT, SUNSHINE BEACH
6.2.2 Footing Design
Should any of the existing structural elements remain, the residence and ancillary structures must not exert
additional load on these elements, unless assessed and approved by a structural RPEQ, who must also
confirm the existing footings and structural members have sufficient capacity to carry additional loads
imposed by the development.
No design loadings were available at the time of reporting. Footings for the proposed residence and any
ancillary structures (e.g. retaining walls, pool etc.) must penetrate through any fill materials and unsuitable
natural soils (i.e. very loose to loose sands) to found at least 1 m into medium dense (or denser) natural
sands. High-level footings may be possible in areas of deeper excavation if medium dense (or denser) sands
are exposed at or near the subgrade. This would be subject to an assessment by a suitably qualified and
experienced geotechnical RPEQ. High-level footings, so founded, could be designed using a maximum
allowable bearing pressure of 100 kPa.
Elsewhere, based on the ASI boreholes, pile founding depths between about 4 m and 5 m BGL (existing
ground levels) are anticipated. Deeper pile depths may be necessary subject to assessment of building loads
at the detailed design stage. To confirm founding depths, deeper borehole drilling should be undertaken
following partial or complete demolition of the existing structures to assess subsurface conditions in the
eastern part of the site.
Excluding the eastern retaining wall, steel screw piles are considered to be an appropriate footing option for
the proposed development. For the eastern boundary retaining wall to achieve the required unfactored shear
resistance of 100 kN/m it is envisaged that steel reinforced concrete bored piles or grout-injected CFA piles
(or similar) will be required. Steel reinforced concrete bored piles would require the use of sacrificial liners
(e.g. Formatube) to prevent caving of the upper sands. Construction water loss would also need to be
carefully monitored and controlled should CFA piles be adopted. The capacity of the piles to achieve this
shear capacity or an equivalent amount should be checked as part of the structural design (lateral capacity).
If steel screw piles are adopted for the main residence and internal walls, it will be important to ensure close
supervision of installation, as piling may not encounter sufficient drilling resistance (from torque
measurement) in sands at the suggested founding depth, and piles could extend to much greater depth than
necessary.
It is therefore recommended that site specific static load testing be conducted from screw piles, if adopted, at
a minimum. Where tension or compression capacity developed in the footings is critical for the future
structure (e.g. resistance to uplift forces from high winds), then cyclic load tests (including measurement of
deflections under tension and compression cycles) should also be undertaken prior to construction.
Kentledge for static testing, or simulated cyclic loads, should prove the piles to a minimum of two times the
expected working load within tolerable deflections.
Ultimately, the advice of a specialist piling contractor should be sought regarding pile design and
construction. However, where steel screw piles are adopted site specific load testing and the results of this
geotechnical investigation should be considered by the structural engineers in validating any generic torque
to capacity ratios provided as part of the proposed design. An assessment of potential vibration effects on
nearby structures and monitoring requirements should also be included.
Footing design should also account for potential soil reactivity to be equivalent to Class M. It should be noted
that the placement of reactive clay may result in a more significant equivalent site classification, such as Class
H1 (or higher).
All footings should found such that they are not adversely affected by any adjacent excavations, batter slopes,
trenches, or retaining walls that are not designed to support building loads. Footings adjacent to any fill batter
crests should be deepened to found below the toe of the batter. Footings should found at least below a plane
extending 1 m horizontally from the base of trenches/underground services/excavations/retaining walls, then
rising up at 1V:1H, as illustrated in Text Figure 13 overleaf.
24 February 2023
Report No. 22484-001-Rev0 16
Document Set ID: 22343520
Version: 1, Version Date: 16/03/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.