Issue           Presence of CREVNT fauna within the development and/or impact area
                    • A pre-clearance fauna and habitat assessment is to be conducted on each day of
                        vegetation disturbance, and will identify any fauna and habitat which may be
                        present.
                    • The Code of Practice - Low impact activities affecting flying-fox roosts must be
                        followed. In the event that Grey-headed Flying-foxes or a roost are identified
                        during pre-clearance surveys, the following will occur:
                             o No roost tree is to be trimmed while flying-foxes are present within 10m.
                             o If a flying-fox is killed, injured or found on the ground as a result of works,
                                 DETSI is to be notified immediately at
                                 [email protected] If more than 30% of adult flying-foxes are observed leaving the roost and
                                 remain airborne for five minutes or more, works must cease and DETSI
                                 is to be notified immediately. Note: This does not apply during dusk when
                                 flying-foxes typically leave the roost to forage.
                    • The FSC will continue to assess for Koala for the duration of works. If a Koala is
                        observed:
                             o Clearing must cease temporarily and the Koala will be assessed for signs
                                 of ill health, as above.
                             o Once all relevant actions have been taken and works have
                                 recommenced, the FSC will continue to assess the Koala for signs of
                                 distress.
                             o If the Koala comes down from the tree, clearing must cease until the FSC
                                 determines it can continue. Consult the KMP for details.
                             o If works have recommenced, vegetation must only be cleared such that a
                                 buffer is retained around the Koala and a corridor of Koala preferred food
                                 trees is retained to allow safe passage for the Koala out of the work
                                 zone.
                             o Clearing cannot resume within the buffer area or corridor until the Koala
                                 has self-relocated to an adequate distance, as determined by the FSC,
                                 an ecologist or the local Koala care group.
                    • Any sick or injured Koala will be reported to 1300 ANIMAL (1300264625).
                    • No interference with a Koala is to occur, other than by Koala care group
                        members.
                    • A register of all fauna encountered is to be maintained and updated daily by the
                        FSC/Ecologist.
                    • A register of all breeding places encountered and tampered with is to be
                        maintained and updated daily by the FSC/Ecologist.
                After works:
                Any post-construction rehabilitation measures outlined within the KMP and other
                approved plans are to be implemented.
Performance     1. Zero disturbance must occur outside the permitted impact area.
Indicators      2. Disturbance of fauna should be avoided, where possible, or minimized.
                3. Mortality of fauna must be prevented.
                4. Suitable habitat within areas not scheduled for clearing must remain functional and
                    stable.
Responsible     RACV is held accountable for:
Personnel           • Ensuring all contractors have read and are able to comply with the FMP, KMP
                        and any other plans applicable to the works.
                The Project Manager is responsible for:
                    • Ensuring contractor compliance with plans pertaining to the project.
                    • Ensuring a suitably qualified FSC undertakes a pre-clearance survey to identify
                        habitat features and reduce fauna load within two [2] weeks of clearing works.
                        This is to include a fauna trapping program.
                    • Ensuring a suitably qualified FSC is present for all vegetation clearing.
                    • Ensuring habitat connectivity is maintained through corridors of retained
                        vegetation.



FAUNA MANAGEMENT PLAN | 142 Noosa Drive, Noosa Heads                                                      12

Used in these records

About this file

File size
4.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Document Fauan Management Plan OPW25-0206.pdf · 4.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.