Original source · versioned page text
Appendix B - Biome Consulting Response
Attached to the e-mail MCU17/0551 - Information Response - 20 Trading Post Rd Cooroy.
Request Item 7.
The provided plan of development does not allocate any area to demonstrate that the required water
quality treatment devices can be appropriately integrated into the development.
7 Provide a preliminary stormwater management plan to demonstrate that there is adequate
space for the required water quality treatment systems as well as depth of fall for pipework
and batters for any bioretention basins. Demonstrate that the preliminary Stormwater
Management Plan is consistent with Specific Outcome O8 of the Water Sensitive Design
Code of the Noosa Plan
Response
It was deemed that an additional stormwater management plan is not required, based on the level of
detail already provided in the submitted SWMP authored by Calibre Consulting. Drawings DWG-300
to DWG-330 within Attachment A indicate that all infrastructure associated with the required
bioretention is able to be contained within the designated footprint.
BIOME Consulting Pty Ltd
M: 0415 935 222 E: [email protected] ABN: 86 166 087 476 Page 6
PO Box 3469, Australia Fair
Southport QLD 4215
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.