Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Engineering_Stormwater Layout Plan

of 1

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 

 

 

|
|

|

x

REFER TO SHEET SEW1 FOR
SEWER DIVERSION DETAILS

STORMWATER TREATMENT BASIN
CATCHMENT C (APPROX 45m?)
(MAINTAIN 1.5m CLEARANCE TO.
EXIST SEWER)

TEMPORARY GREEN
SPACE REFER

 
 

ARCHITECTS DRAWINGS

 

 

 

 

   

STORMWATER
TREATMENT BASIN
CATCHMENT D
(APPROX 40m?)

_/ |

  

 

DETENTION TANK

 

CATCHMENT C
APPROX 100m?

TEMPORARY GREEN
SPACE REFER 7
ARCHITECTS DRAWINGS v J

STORMWATER TREATMENT
BASIN CATCHMENT B (APPROX
| \65m?) IF REQUIRED

¥
= %y,
= 6Y

— OUTLET TO EXISTING
SURFACE IN ROAD
RESERVE

OUTLET IN EXISTING
ROCK LINED CHANNEL

%

0 5 10 15 20 25m

SCALE 1: 500 @ A1 - 1: 1000 @ A3

 

 

Lt

 

 

 

 

 

 

 

 

 

 

 

 

LEGEND:
[{(XkkEq] TEMPORARY GREEN SPACE

| STORMWATER TREATMENT BASIN
fans DETENTION TANKS
fy STORMFILTER TREATMENT CELLS
——a INDICATIVE PAVEMENT FALL
+ 21.30 INDICATIVE PAVEMENT LEVEL.

=m FUTURE DEVELOPMENT LINE

CONNECT TO EXISTING
WW MANHOLE

  
     

 

 

 

 

 

 

 

 

DETENTION TANK
CATCHMENT D
APPROX 100m?
4 sw — sw —— sw
is

/)

%

— si—

\
/ “CONNECT TO EXISTING PIT

/

r “¢ STORMFILTER TO TREAT RUNOFF
“ FROM SPECIALTY SHOP AREA

6a ee

 

STORMFILTER TO TREAT RUNOFF

| >FROM SPECIALTY SHOP AREA

PRELI

MINARY

 

 

CoPYRIGHT®)
These drawings and the design
thereon are copyright and shall
not be used or reproduced without
the written permission of Tod
Consulting Pty Ltd

PRELIMINARY DETAILS:
Detals shall be treated as not
approved for construction until
marked as issued For Construction
in tne Drawing Record

 

 

 

 

 

Verified Project Drawing Title:
DR 5 NOOSA JUNCTION - NOOSA FAIR SITE - PRELIMINARY
ene PROPOSED EXTENSION RE-DEVELOPMENT STORMWATER LAYOUT

 

 

 

 

 

 

 

 

 

 

 

 

Associated Consultants Client: Drawn
COLES GROUP PROPERTY il D pwi 5
jesigne:
DEVELOPMENTS DWG
consulting engineers Approved
D Reynolds
A.B.N. 39 128 805 336
A 13/8/14 STORMFILTER CELLS DWH ‘Sunshine Coast Ph (07) 5449 9600 Mackay Ph (07) 4840 2337
REV|DATE Rev Description Drn email ; [email protected] web : www.todconsulting.com

 

 

 

RPEQ No 9072 ROP

LOCAL AUTHORITY Sunshine Coast Council
MCU APPROVAL TBA

ROL APPROVAL

OPW APPROVAL

 

PLAN - PROPOSED
DEVELOPED SITE

 

 

HORIZ DATUM RP 884396
VERT DATUM AHD PSM 18412
RL 20.159

 

 

 

Scale [Sheet Size|
AS SHOWN | A1
Drawing No.

12691

Sheet REV
sw2 A

 

 

 
Log in to download the original file

Engineering_Stormwater Layout Plan.pdf · 570 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.