Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

S12884-210412-Store Local Stage 3 -For Approval

of 24

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                                                                                                         FOR CONTINUATION REFER TO CR01
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               EROSION & SEDIMENT CONTROL




                                                                                                                                                                                    | Y
                                                                                                                 > SW >




                                                                                                                                                                                                                                                                                                                                                                                                              >
                                                                                                                                                                                                                                                                                                                                                                                                                      Y
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               GENERAL NOTES:




                                                                                                                                                                            | Y | Y




                                                                                                                                                                                                                                                                                                                                                                                                                      Y   |
                                                                                               S




                                                                                                                                                                                                                                                                                                                                                                                                      S
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               1.   THE SEQUENCE OF OPERATIONS SHALL BE AS FOLLOWS:




                                                                                                                                                                                                                                                                                                                                                                                                                          |
                                                                                                                                                                                                                                                                                                                                                                                                              8
                                                                                                                                                                                                                                                                                                                                                                                                                  Y.5 | Y
                                                                                                                                                                                                                                                                                                                                                                                                                                                             8.50                                                                                 a. DELINEATION OF BUFFER AREAS AND DRAINAGE RESERVES, ERECTION OF




                                                                                                                                                                    | Y | Y




                                                                                                                                                                                                                                                                                                                                                                                                                >
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      BARRICADE FENCING.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  b. LOCATION OF TOPSOIL STOCKPILES AND ERECTION OF DOWNHILL SILT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      FENCE.




                                                                                                                                                                                                                                                                                                                                                                                                                          |
                                                                                           S




                                                                                                                                                                                                                                                                                                                                                                                                                      Y
                                                                                                             SW
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  c. CONSTRUCTION OF DIVERSION WORKS NECESSARY TO MINIMISE RUNOFF




                                                                                                                                                            | Y | Y




                                                                                                                                                                                                                                                                                                                                                                                                                          |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      FROM ENTERING THE SITE.




                                                                                                                >




                                                                                                                                                                                                                                                                                                                                                                                                                      Y
                                                                                                                                                                                                                                                                                                                                                                                                              >
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  d. CONSTRUCTION OF TEMPORARY EROSION AND SEDIMENT CONTROL




                                                                                                                                                                                                                                                                                                                                                                                                      S
                                                 PROPOSED SWALE TO ACT AS




                                                                                                                                                                                                                                                                                                                                                                                                                          |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      MEASURES (eg. SILT FENCES).




                                                                                                                                                                                                                                                                                                                                                                                                                      Y
                                                 DIVERSION DRAIN DURING                                                                                                                                                                                                                                                                                                                                                                                                                                                                           e. LAND CLEARING AND TOPSOIL STRIPPING.




                                                                                                                                                    | Y | Y
                                                 CONSTRUCTION.




                                                                                                                                                                                                                                                                                                                                                                                                                          |
                                                                                       S
                                                                                                                                                                                                                                                                                                                                                                                                                                                                 PROPOSED SWALE TO ACT AS                                                         f. CONSTRUCTION OF STORMWATER DRAINAGE FACILITIES.




                                                                                                                                                                                                                                                                                                                                                                                                                      Y
                                                                                                              SW
                                                                                                                                                                                                                                                                                                                                                                                                                                                                 DIVERSION DRAIN DURING                                                           g. LAND SHAPING.




                                                                                                                                                                                                                                                                                                                                                                                                                          |
                                                                                                            >
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  h. CONSTRUCTION OF ROADS AND ACCESSWAYS,




                                                                                                                                                                                                                                                                                                                                                                                                              >
                                                                                                                                                                                                                                                                                                                                                                                                                                                         8.25    CONSTRUCTION.




                                                                                                                                                                                                                                                                                                                                                                                                                      Y
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      INSTALLATION OF SERVICES.




                                                                                                                                            | Y | Y




                                                                                                                                                                                                                                                                                                                                                                                                                          |
                                                                                                                             8.0
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  i. FINAL REHABILITATION AND LANDSCAPING.




                                                                                                                                                                                                                                                                                                                                                                                                                      Y
                                                                                                                                                                                                                                                                                                                                                                                                      S
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  j. MAINTENANCE.




                                                                                                                                                                                                                                                                                                                                                                                                                          |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               2. ALL SILT FENCES ARE TO BE INSTALLED PARALLEL TO CONTOURS UNLESS




                                                                                                                                                                                                                                                                                                                                                                                                                      Y
                                                                                                        >   SW
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    SHOWN OTHERWISE.




                                                                                                                                      Y | Y




                                                                                                                                                                                                                                                                                                                                                                                                              >8
                                                                                                                                                                                                                                                                                                                                                                                                                          |
                                                                                   S




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               3. SILT FENCES ARE TO BE INSTALLED DOWNHILL AND DIVERSION BANKS




                                                                                                                                                                                                                                                                                                                                                                                                                  Y.0 |
                                                                                                                                                                                                                                                                                                                                                                                                                                                             8.00
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    UPHILL OF TOPSOIL STOCKPILES.




                                                                                                                                                                                                                                                                                                                                                                                                                        Y
                                       SILT FENCE, REFER TO                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    4. TOPSOIL STOCKPILES ARE TO BE MULCHED OR TEMPORARILY VEGETATED IF




                                                                                                                                                                           |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                               8.25




                                                                                                                                                                             Y
                                       S12884-CE03 FOR DETAILS.




                                                                                                                                                                                                                                                                                                                                                                                                                  |
                                                                                                                                                                                                  MATERIAL STOCKPILE, LOCATION AND                                                                                                                                                                                                                                                                                                                  THEY ARE TO REMAIN FOR MORE THAN 30 DAYS.




                                                                                                                                                                                                                                                                                                                                                                                                              Y
                                                                                                        >

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               5. MOVEMENT OF CONSTRUCTION EQUIPMENT SHALL BE LIMITED TO THE AREA




                                                                                                                                                                              |
                                                                                                                                                                                                  SIZE TO BE CONFIRMED ON SITE AT




                                                                                                                                                                                                                                                                                                                                                                                                      S

                                                                                                                                                                                                                                                                                                                                                                                                              >Y
                                                                                                                                                                                      | Y




                                                                                                                                                                                                                                                                                                                                                                                                              |
                                                                                                                                                                                                  EACH STAGE OF CONSTRUCTION.                                                                                                                                                                                                                                                                                                                       OF WORK AND EXISTING ROADS.
                                                                                   S




                                                                                                                                                                                                  REFER TO S12884-CE02 FOR DETAILS.                                                                                                                                                                                                                                                                                                            6. DISTURBED AREAS ARE TO BE GRASSED FOLLOWING FINAL TRIMMING, AREAS
                                                                                                                                                                                                                                                                                                                           SILT FENCE, REFER TO




                                                                                                                                                                                Y | Y




                                                                                                                                                                                                                                                                                                                                                                                                              |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ARE TO BE DISTURBED AND RESTORED PROGRESSIVELY.
                                                                                                                                                                                                                                                                                                                           S12884-CE03 FOR DETAILS.




                                                                                                                                                                                                                                                                                                                                                                                                              Y
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               7. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE INSPECTED
                                                                                                                 7.5




                                                                                                                                                                                                                                                                                                                                                                                                              |
                                                                                                   SW




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    AND RE-INSPECTED AT THE END OF EACH DAY'S WORK DUE TO THE
                                                                                                    >




                                                                                                                                                                                                                                                                                                                                                                                                              Y
                                                                                                                                                                                                                                                                                                                                                                                                              >
                                                                                                                                                                                          |
                                                                   SW                                                                                                                                                                                                                                                                                                                                                                                        5                                                                                      POSSIBILITY OF OVERNIGHT RAINS AND IMMEDIATELY PRIOR TO ANY
                                                                                  S




                                                                                                                                                                                                                                                                                                                                                                                                                                                               7.7
                                                                                                                                                                                          Y




                                                                                                                                                                                                                                                                                                                                                                                                              |
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    POSSIBLE STORM EVENT.




                                                                                                                                                                                                                                                                                                                                                                                                      S
                                                                            SW                                                                                                                                                                                                                                                                                                                                                                                                                                                                 8. KERB AND/OR SURFACE INLET SEDIMENT TRAPS ARE TO BE PROVIDED AT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    EACH DRAINAGE PIT UNTIL ADJACENT DISTURBED AREAS ARE FULLY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    RESTORED.
                                                                                                   >




                                          S[C]                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 9. FILTER ROLLS TO BE PROVIDED AT ALL STORMWATER INLET PITS.
                                                                                  S




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               10. ANY DIRT/MUD/MATERIALS SPILT OR TRACKED ONTO THE COUNCIL'S ROADS
                                                            S[C]                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    IS TO BE BROOMED UP AND COLLECTED - NOT WASHED DOWN INTO THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    STORM WATER DRAINS.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 8.0
                                                                                                             S[C]                                    S[C]                                                                                                                                                                                                                                                                                                    7.50
                                                                                               >




                                                                                                                                                                                                                                                                                                                                                                                                      S
                                                                                                                                                                                                      S[C]               S[C]                S[C]                 S[C]              S[C]       S[C]                 S[C]                 S[C]            S[C]              S[C]                                                                                                                                                                EROSION & SEDIMENT CONTROL
                                                                                                                                                                                                                                                                                                                                                                                                                              S[C]                                                                                                             TRENCHING OPERATIONS:
                                                                                                                                                                                                                                                                                                                                                                                      Y   |
                                                                                                                                                                                                                                                                                                                                                                                              Y   |
                                                                                                                                                                                                                                                                                                                                                                                                      Y   |
                                                                                                                                                                                                                                                                                                                                                                                                              Y       |
                                                                                                                                                                                                                                                                                                                                                                                                                          Y                                                                                                                    THE CONTRACTOR SHALL FOLLOW THE PROCEDURES BELOW TO MINIMISE
                                                                                                    7.0




                                                                                                                                                                                                                                                                                                                                                                                                                                 |
                                                                                                                                                                                                                                                                                                                                                                                                                                     Y   |
                                                                                                                                                                                                                                                                                                                                                                                                                                             Y   |
                                                                                                                                                                                                                                                                                                                                                                                                                                                     Y   |   7.5
                                                                                                                                                                                                                                                                                                                                                                                                                                                              Y |
                                                                            7.0                                                                                                                                                                                                                                                                                                                                                                              S[C]                                                                              SCOURING OF TRENCHES DURING RAINFALL EVENTS THAT OCCUR THROUGH THE
                                                                                                        0




                                                                                                                               7.25




                                                                               0




                                                                                                                                                                                                                                                                  SP 163309
                                                                                                                                                                                                                                                                                                                                                                                                                                                                     7.25                                                                      CONSTRUCTION PHASE.




                                                                                                                                                                                                                                                                   LOT 902
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                1.   OPEN ONLY AS MUCH GROUND AS REQUIRED TO UNDERTAKE THE WORK AT
                                                                                                                                                                                                       7.50                                                                                                                                                                                                                                                                    S[C
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     ]                                                               HAND.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                2. WHEREVER POSSIBLE CONSTRUCT LINES FROM UPSTREAM TO
                                                                                                                                                                                                                                                                                                          7.50
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        S[C
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     DOWNSTREAM.
                                                                                  NOTE:                                                                                                                                                                                                                                                               CONTRACTOR TO SEEK PERMISSION                                                                                                                         ]                                   3. PLACE BEDDING MATERIAL AS SOON AS PRACTICAL AFTER OPENING
                                                                                                                                                                                                                                                                                                                                                                        7.25
                                                                                  REFER TO DRAWING                                                                                                                                                                                                                                                    FROM LAND OWNER OF LOT 902 ON                                                                                                                                                                  TRENCH.
                                                                                  S12884-CE01 FOR LEGEND.                                                                                                                                                                                                                                             RP163309 TO ERECT SILT FENCE                                                                                                                                                              4. CLOSE TRENCH AS SOON AS PRACTICABLE AFTER LAYING PIPE.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           S[C]
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                5. INSTALL FILTER ROLLS IN TRENCHES AT 10m CENTRES WHENEVER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     TRENCHES ARE PROPOSED TO BE LEFT OPEN AND UNATTENDED eg.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     OVERNIGHT.


                                                                                                                                                                                                                                                                                                       PLAN                                                                                                                                                                                                                                    EROSION STAGING NOTE:
                                                                                                                                                                                                                                                                                                      SCALE 1:100                                                                                                                                                                                                                              THE EROSION MEASURES SHOWN ON THIS DRAWING ARE TO BE ADJUSTED
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               THROUGHOUT THE COURSE OF CONSTRUCTION TO SUIT INTERIM STAGING OF THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               BUILDING WORKS. ANY TEMPORARY SITE WORKS SHALL BE MANAGED IN A WAY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               NOT TO CAUSE ANY NUISANCE DRAINAGE IMPACTS TO ADJOINING OR
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               DOWNSTREAM PROPERTIES. CONTACT CONSULTING ENGINEER FOR FURTHER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               DETAILS AS REQUIRED.


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               SAFE ACCESS NOTE:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               CONTRACTOR TO CLOSE FOOTPATH AND BARRICADE STABILISED ENTRY/EXIT.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               PROVIDE SAFE PEDESTRIAN ACCESS IN ACCORDANCE WITH THE MANUAL FOR
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               UNIFORM TRAFFIC CONTROL DEVICE.


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               DEMOLITION NOTE:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               THE PERSON RESPONSIBLE FOR THE DEMOLITION WORKS SHALL ENSURE THAT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               ALL VEHICLES LEAVING THE SITE CARRYING DEMOLITION MATERIALS HAVE THEIR
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               LOADS COVERED AND DO NOT TRACK SOIL OR WASTE MATERIALS ONTO THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               ROAD.


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               ASBESTOS REMOVAL NOTE:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               SHOULD ASBESTOS BE PRESENT, ITS REMOVAL SHALL BE CARRIED OUT IN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               ACCORDANCE WITH THE NATIONAL OH&S COMMITTEE - CODE OF PRACTICE FOR
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               SAFE REMOVAL OF ASBESTOS AND ITS CODE OF PRACTICE FOR THE MANAGEMENT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               AND CONTROL OF ASBESTOS IN THE WORKPLACE.


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               WORKPLACE HEALTH AND SAFETY NOTE:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               ALL WORKS UNDERTAKEN BY THE CONTRACTOR SHALL COMPLY WITH THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               REQUIREMENTS OF THE QUEENSLAND WORK HEALTH AND SAFETY ACT 2011.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               CONTACT THE NEAREST OFFICE OF THE DIVISION OF WORKPLACE HEALTH AND
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               SAFETY FOR INFORMATION. PHONE No. 1300 362 128.


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               DIAL BEFORE YOU DIG:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               IT IS THE CONTRACTORS RESPONSIBILITY TO CONTACT 'DIAL BEFORE YOU DIG'
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               PH.1100 FOR THE LOCATION OF EXISTING PUBLIC UTILITIES PRIOR TO EXCAVATION.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               ANY DAMAGE CAUSED TO EXISTING PUBLIC UTILITIES BY THE CONTRACTOR WILL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               BE REPAIRED BY THE RELEVANT AUTHORITY AT THE CONTRACTOR'S EXPENSE.


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               EXISTING SERVICES NOTE:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               THIS DESIGN HAS BEEN PREPARED BASED ON SERVICE AUTHORITY AS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               CONSTRUCTED INFORMATION. NO POT HOLING HAS BEEN UNDERTAKEN TO VERIFY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               EXISTING SERVICE LOCATIONS AND DEPTHS. IT IS THE CONTRACTORS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               RESPONSIBILITY TO UNDERTAKE POT HOLING TO VERIFY THE DESIGN.


                                   NOT FOR CONSTRUCTION                                                                                                                                                                                                                                                                                                                                                                                                                                          SCALE 1:100 (A1)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    0             2        4         6m                   REAL PROPERTY DESCRIPTION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          LOT 59 ON RP228906




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            © MILANOVIC NEALE CONSULTING ENGINEERS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    (SCALE BEFORE REDUCTION)
ALL SCALES ARE AS SHOWN (A1)
DO NOT SCALE FROM DRAWING




                               REV.                 DESCRIPTION                             DATE            INIT.                                                                                                                                                    CONTACT DETAILS       CLIENT                                                                     PROJECT                                                                                                            TITLE                                                                         DRAWN             DESIGNED           DATE
                                A FOR CLIENT REVIEW                                        23.02.21          SM                                                                                                                                                      E [email protected]                                                                                                                                                                                                                                                                                        SM               SM              FEB 2021
                                B FOR APPROVAL                                             09.04.21          SM                                                                                                                                                      W www.mnce.com.au

                                                                                                                                                                                                                                                                                                                                                                               STORE LOCAL - NOOSAVILLE                                                                                  EROSION AND SEDIMENT CONTROL                                                  CHECKED           APPROVED

                                                                                                                                                                                                                                                                                                       STORELOCAL PTY LTD                                                                                                                                                                                                  DH

                                                                                                                          BRISBANE                                                            IPSWICH
                                                                                                                                                                                                                                                                                                                                                                                       STAGE 3                                                                                            LAYOUT PLAN - SHEET 2 OF 2 DRAWING No.                                                                                   REV.
                                                                                                                                                                                                                      SYDNEY                GOLD COAST
                                                                                                                          PH No. (07) 3255 1877                                               PH No. (07) 3281 6603   PH No. 1300 827 901   PH No. 1300 827 901                                                                                                                                                                                                                                                        S12884 - CE02                                                                                  B
Log in to download the original file

S12884-210412-Store Local Stage 3 -For Approval.pdf · 7.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.