Thursday, 8 November 2018

Our Ref: 12332 / Office: Sunshine Coast
Council Ref: MCU18/0097



        NOOSA COUNCIL
        PO BOX 141
        TEWANTIN QLD 4565

        ATTENTION: Billy Glover



Dear Billy

INFORMATION RESPONSE
DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE - TYPE 2 SCHOOL (CAR PARK)

115 EUMUNDI NOOSA ROAD, NOOSAVILLE
LOT 1 ON SP228052 & LOT 30 ON SP170751


Further to your information request for the abovementioned development application we now
respond to all of the information requested.

                                  START INFORMATION RESPONSE

Issue

Vehicle Access and Movements, Pedestrian Connections, and Site Users.

The submitted material does not demonstrate suitable connection of the proposed car park to the
existing school campus and adjoining road network, nor demonstrate a suitable layout of the site.

Information Required

1. Provide a masterplan of the school campus and subject lot to demonstrate connection between
    the school and proposed car park.

Response
Please refer attached masterplan showing the full school campus, which demonstrates the proposed
connection between the school and carpark.


2. Access to Eumundi Noosa Road from the proposed new school car park is not supported. Provide
    an amended proposal plan that provides access to the car park in a satisfactory manner via the
    existing college access arrangements. This should include assessment by an RPEQ traffic engineer
    of operation and sight lines at that new integrated access location and configuration. Note that
    details of the proposal to legally formalise access through the existing campus parking area for
    exit from the new car park will also be required.
Log in to download the original file

12332_Council_Information Response_081118.pdf · 438 KB (small file)

Full text of the other 9 pages

Page 2

Response
Please refer attached amended proposal plans that remove access from Eumundi Noosa Road. All
access is proposed via the existing access arrangements on Walter Hay Drive. In order to achieve
appropriate access and movement through the existing carpark and driveways, changes to the current
arrangements are proposed and detailed on the amended proposals plans. This includes a new parent
setdown/pickup zone to improve the overall vehicle movement function. An assessment of the access
and movement arrangements is provided in the attached traffic response prepared by TTM.

The most appropriate way to legally formalise access through the existing campus parking area is for
the inclusion of the existing campus land as part of the application. In this regard we attach an
updated DA Form 1 and owner’s consent providing for the inclusion of Lot 1 on SP228052 as part of
the application.


3. Provided details of arrangements through signage and other means (such as threshold treatments)
    to limit use of the car park for staff and student parking only, and prohibiting visitor parking,
    student set-down and collection activities, and unauthorised/public use.

Response
The carpark was originally designed as a student and staff parking area only given its separation from
the main Walter Hay Drive access. As a result of the proposed changes to the Walter Hay Drive access
and carpark, existing visitor carparks have been lost. The proposed carpark has been redesigned to
provide for 24 carparks at 2.6m wide to compensate for this loss. Rather than prohibiting
visitor/parent parking, the carpark spaces will be clearly signed for use (refer traffic response and
landscape plans). 125 will be signed for staff and student parking with 24 available for visitor parking.


4. Remove elements of the proposal plan that suggest a set-down / pick-up zone within the
    proposed car park.

Response
The amended proposal plans clarify the carpark layout and remove elements that suggest a set-down /
pick-up zone.


5. Prepare a parking management plan detailing arrangements to be used during events to enable
    and manage parent parking within the car park at those times. Include details such as provisions to
    direct parents to the new car park when other existing areas of the campus car park are full.

Response
A parking management plan is not considered necessary. The availability of the carpark for parent use
during events could be simply advised by newsletter or a temporary sign placed at the carpark entry as
required indicating ‘event parking’. This requirement can be conditioned.


6. Provide a plan and additional material demonstrating suitable permeable pedestrian connections
    between the proposed car park and linkages at the existing campus. The pedestrian connections
    should be designed to incorporate and make reference to CPTED principles.

Response
The amended proposal plans demonstrate a suitable permeable pedestrian connection between the
proposed car park and the existing campus. The connection achieves CPTED principles and which is
outlined in both the traffic response and landscape design intent.

Page 3

7. Undertake assessment of traffic impacts at the Walter Hay Drive and Goodchap Street
    intersections with Eumundi Noosa Road that will arise from the redistribution of traffic associated
    with the proposal.

Response
As discussed and agreed in meeting with Council, Holland Traffic Consulting and TTM on 27/07/18, it
was considered that this additional traffic assessment would not be required should site access be
proposed from the existing Walter Hay Drive access as now shown on the attached proposal plans.


Issue

Existing vegetation along the frontages of Eumundi Noosa Road and Walter Hay Drive provides
vegetation screening of the development area and must be retained to provide advanced screening of
the development.

Information Required

8. Demonstrate the retention of existing vegetation along the frontage of Eumundi Noosa Road and
    Walter Hay Drive through the provision of an arborist report, which demonstrates the construction
    and maintenance requirements to maintain the vegetation in good condition for the life of the
    development.

Response
An assessment of existing vegetation was undertaken by the landscape architect as part of the initial
carpark design. Retention of existing vegetation was considered in the context of the planning scheme
provisions, which require a 2m landscaped setback to the frontage, and maximising the use of the site
for school car parking. All reasonable efforts have been made to retain existing vegetation and disturb
the least area practical. The resulting design provides for the retention of 9 existing trees and a
frontage landscape buffer width on average of about 4.8m (which considerably exceeds the planning
scheme requirement). Existing retained trees are clearly identified on the landscape plan and carpark
proposal plan. The landscape plan also indicates the intent to provide permeable paving under the
drip line of the retained trees to support the ongoing health of the trees. The requirement for arborist
report detailing the construction and maintenance requirements to support the proposed tree
retention can be conditioned to be provided with a subsequent operational works application.


Issue

The location of the bioretention basin in the front setback area reduces the ability of the development
to provide a vegetated screening of the car park area when viewed from the major road networks.

Information Required

9. Provide a revised car park layout that relocates the bioretention basin and provides vegetation
    screening of the development when viewed from the major road networks, Walter Hay Drive and
    Eumundi Noosa Road.

Response
The proposed bio basin is setback 2m from the road frontage boundary providing sufficient
opportunity for screening vegetation. This 2m setback is in accordance with frontage landscape
setback requirement of the planning scheme and consistent with similar approval outcomes issued by
Council.

Page 4

Issue

The landscape code requires a minimum of 1x100L tree to be provided for every 4 car-parking spaces
and a minimum of 5m2 is to be provided for each tree. The proposal lacks landscaping amongst the
proposed car parking spaces.

Information Required

10. Provide an assessment of the proposal against the provisions of The Noosa Plan Landscape Code
    Outcome 28.

Response
Refer attached amended landscape concept plan. The proposal will comply with specific outcome 28
by providing landscaping of the carpark designed to reduce the visual impact of the development;
provide for advanced canopy trees; ensure canopy trees are protected from vehicle damage; maximise
opportunities for infiltration of rainwater; and minimise contaminated runoff. A full assessment is
provided below.

Specific Outcome                     Probable Solution                    Response
Off street carparks
O28 Landscaping of carparking        S28.1 One advanced canopy tree       Complies
areas is designed to—                (a minimum of 100 litres pot size)   The site is not a town or village
a) reduced the visual impact of      is provided—                         centre, a shopping centre or
the development;                     a) in towns and villages, shopping   commercial area and therefore
b) provide for advanced canopy       centres or commercial areas - for    the applicable rate is 1 tree for
trees to shade vehicles and to       every 4 carparking spaces; or        every 6 car parking spaces. The
reduce reflected radiation;          b) otherwise - for every 6           carpark proposes 149 spaces and
c) ensure canopy trees are           carparking spaces;                   therefore 25 canopy trees are
protected from vehicle damage        AND                                  required. Notwithstanding, the
by providing adequate sized                                               landscape plan proposes 39
garden beds;                                                              canopy trees, including the
d) maximise opportunities for                                             retention of 9 existing trees.
infiltration of rainwater on-site;
and                                  S28.2 A minimum area of 5m2 is       Complies
e) minimise contaminated runoff      provided around each canopy          The total landscaped area is
entering the stormwater system       tree, which is mulched and           1,379m2. All canopy trees will be
and watercourse.                     treated;                             located in a planting area
                                     AND                                  exceeding 5m2.


                                     S28.3 Plants are grouped in          Complies
                                     mulched beds rather than using       As shown on the landscape plan,
                                     individual, evenly spaced trees      trees will be grouped in beds with
                                     and scrubs;                          shrubs      and   ground     cover
                                     AND                                  planting.

                                     S28.4 Semi-pervious pavement         Complies
                                     surfaces are used, such as grass     The     carpark     will   include
                                     cell paving, to increase             permeable paving within the
                                     infiltration of rainwater and        carpark within vicinity of existing
                                     minimise contaminated                trees to be retained.
                                     runoff, including hydrocarbons,
                                     entering the stormwater system
                                     and watercourses;
                                     AND
                                     S28.5 Runoff from carparking         Complies
                                     areas is directed to landscaped      Runoff is directed to a central
                                     areas to minimise contaminate        landscaped    swale     and bio
                                     runoff, including hydrocarbons,      retention basin before entering
                                     entering the stormwater system       into the stormwater system.
                                     and watercourses;

Page 5

                                    AND

                                    S28.6 Garden mounding is            Complies -Alternative solution
                                    incorporated into carparking        Due to the intent to retain
                                    areas adjacent to frontages;        existing vegetation along the site
                                    AND                                 frontages, mounding is not
                                                                        possible due to the impact on the
                                                                        trees.      The    retention    of
                                                                        established     vegetation     far
                                                                        outweighs     any    benefit    of
                                                                        mounding.

                                    S28.7 Surface and subsurface        Complies
                                    drainage swales are used to         A central landscaped drainage
                                    maximise stormwater infiltration;   swale is proposed to maximise
                                    AND                                 stormwater infiltration.

                                    S28.8 A planting bed of at least    Not Applicable
                                    1m width with screen fencing and    The carpark does not adjoin any
                                    dense planting is provided to any   residential development
                                    property boundary with an
                                    adjacent residential development.



Issue

The MUSIC model demonstrated in the Stormwater Report shows that all runoff will flow via pervious
paving prior to entering bioretention basins. However, the detail design plans demonstrate that only a
small portion of the runoff will flow via pervious paving areas prior to entering the bioretention basins,
and therefore is inconsistent with the MUSIC model. Additionally, the Water By Design Music
Modelling Guidelines states that porous paving and associated drainage layer and filter media must be
free draining (i.e. does not hold water after rainfall), the information provided does not demonstrate
this is the situation on this site.

Information Required

11. Provide a MUSIC model, that is consistent with the detail design plans in terms of the low flow and
    high flow bypass to achieve the required pollutant reduction targets.

12. Demonstrate that the drainage features underlying any pervious paving is consistent with the
    requirement of The Water by Design Music Modelling Guidelines.

13. Also, provide a copy of the MUSIC model, prepared in accordance with the Water by Design
    MUSIC modelling Guidelines, that demonstrates the required pollution reduction targets are
    achieved.

Response
Refer attached amended Stormwater Management plan, MUSIC modal and response from Odyssey
Consulting within Attachment 1. These documents demonstrate consistency with the MUSIC model
and Water by Design Music Modelling Guidelines.


Issue

Specific Outcome O8 of the Water Sensitive Design Code requires that the Development design
including density and scale provides adequate footprint to integrate all elements of stormwater quality
and quantity treatment infrastructure including, where relevant, bio retention basin batters and
maintenance access, without the need for retaining walls. The incorporation of the detention
component with the bioretention water quality treatment component has resulted in retaining walls

Page 6

that do not meet Specific Outcome O8. Additionally, it is not clear how the bioretention basin will be
accessed for maintenance purposes.

Information Required

14. Demonstrate that there is no alternative to the proposed design for incorporation of the above
    ground incorporation of the detention component with the bio retention basin in the format that
    requires retaining wall surrounds and demonstrate that adequate access is provided for
    maintenance. Consider alternatives such as provision of water quality treatment components
    throughout the car park landscaping and undergrounding detention components to maximise the
    space available.

Response
Refer response from Odyssey Consulting within Attachment 1. This response discusses the various
options considered for stormwater management. The proposed bio basin design and location
represents the best outcome for the site to enable retention of existing vegetation, maximise the car
parking provision and minimise ongoing maintenance costs.


                                   END INFORMATION RESPONSE


Part 3: Information Request has now concluded. We ask that you now provide details of adjoining
owners in order that we may commence the public notification of the application.

Should you have any questions with respect to the above, please do not hesitate to contact me direct.

Yours faithfully
PROJECT URBAN




Scott Sobey
DIRECTOR
Email: [email protected]

Page 7

ATTACHMENT 1

 

Odyssey Consulting response

Page 8

                                                                                             Odyssey Consulting Group Gold Coast
                                                                                             ABN 35 612 263 975
                                                                                             Suite 5 Corporate House
                                                                                             155 Varsity Parade
                                                                                             Varsity Lakes Q 4227
                                                                                             PO Box 4579 Robina Town Centre
                                                                                             Queensland Australia 4230
                                                                                             Telephone: +61 7 5575 7744
                                                                                             Facsimile: +61 7 5641 7992
                                                                                             Email: [email protected]
05 November 2018                                                                             www.odcconsulting.com.au

                                                                                             Odyssey Consulting Group Brisbane
                                                                                             ABN 39 165 718 230
Billy Glover                                                                                 9a/19 Lang Parade
                                                                                             Milton Q 4064
Assistant Development Planner                                                                Telephone: +61 7 3720 8800
Noosa Council                                                                                Facsimile: +61 7 5641 7992
                                                                                             Email: [email protected]
PO Box 141
TEWANTIN Q 4565                                                                              Odyssey Consulting Group Rockhampton
                                                                                             6A/34 East Street
                                                                                             Rockhampton Q 4701
Our Ref: K4277-0005                                                                          Telephone: +61 7 4922 5019
Your Ref: MCU18/0097                                                                         Facsimile: +61 7 5580 9133
                                                                                             Email: [email protected]
BY EMAIL: [email protected]


To Whom it May Concern


RE:     INFORMATION REQUEST – LOT 30 SP170751 – 115 EUMINDI NOOSA ROAD, NOOSAVILLE

We refer to the above matter and in particular your correspondence dated 16 July 2018 requesting further information,
we hereby provide the following response.

ITEM 9
Issue
The location of the bioretention basin in the front setback area reduces the ability of the development to provide a
vegetated screening of the car park area when viewed from the major road networks.

Information Required
Provide a revised car park layout that relocates the bioretention basin and provides vegetation screening of the
development when viewed from the major road networks, Walter Hay Drive and Eumundi Noosa Road.

Response:
The bio retention basin set back is currently 2m off the boundary. The current location was seen as the best option as it
followed the natural contours negating the need for unnecessary earthworks and tree removal.

ITEM 11
Issue
The MUSIC model demonstrated in the Stormwater Report shows that all runoff will flow via pervious paving prior to
entering bioretention basins. However, the detail design plans demonstrate that only a small portion of the runoff will
flow via pervious paving areas prior to entering the bioretention basins, and therefore is inconsistent with the MUSIC
model. Additionally, the Water By Design Music Modelling Guidelines states that porous paving and associated
drainage layer and filter media must be free draining (i.e. does not hold water after rainfall), the information provided
does not demonstrate this is the situation on this site.

Information Required
Provide a MUSIC model, that is consistent with the detail design plans in terms of the low flow and high flow bypass to
achieve the required pollutant reduction targets.




K4277-0005-A                                         2 November 2018                                              Page 1 of 3

Page 9

Good Shepard Lutheran College                                                                          Odyssey Consulting Group
Proposed Car Park                                                                         Council Information Request Response
Lot 30 on SP170751                                                                                            Project No: K4277
115 EUMUNDI NOOSA ROAD, NOOSAVILLE

Response:
The MUSIC modelling has been revised to better represent the proposed design. It is proposed to direct all stormwater
flows north west towards Noosa Eumundi Road where flows will be captured by kerb and channel along north western
                                                                                                       2
boundary of the carpark. The majority stormwater flows from catchment A (A1) will pass over 69m of permeable
pavement before entering the bioretention / detention basin. Flows from catchment A (A2) that do not pass over the
permeable pavement will be directed straight into the bioretention basin. For further details see Knobel Consulting Pty
Ltd, Stormwater Management Plan (Ref: K4277/P007/B).

ITEM 12
Information Required
Demonstrate that the drainage features underlying any pervious paving is consistent with the requirement of The
Water by Design Music Modelling Guidelines.

Response:
Permeable pavement has been proposed in select areas to ensure the development best utilises the available space
while retaining existing established trees. As required by Water By Design Music Modelling guidelines, the permeable
pavement must be free draining, in lieu of geotechnical testing to confirm the hydraulic conductivity of the surrounding
soil, perforated pipe has been proposed. A permeable membrane will also be provided to allow stormwater to
permeate through the surrounding soils for the existing root systems. A section has been included to detail the
permeable pavement, for further details see Knobel Consulting Pty Ltd, Conceptual Stormwater management Plan (Ref:
K4277-0002-A).


ITEM 13
Information Required
Also, provide a copy of the MUSIC model, prepared in accordance with the Water by Design MUSIC modelling
Guidelines, that demonstrates the required pollution reduction targets are achieved.

Response:
Please see attached MUSIC model.

ITEM 14
Issue
Specific Outcome O8 of the Water Sensitive Design Code requires that the Development design including density and
scale provides adequate footprint to integrate all elements of stormwater quality and quantity treatment infrastructure
including, where relevant, bio retention basin batters and maintenance access, without the need for retaining walls.
The incorporation of the detention component with the bioretention water quality treatment component has resulted
in retaining walls that do not meet Specific Outcome O8. Additionally, it is not clear how the bioretention basin will be
accessed for maintenance purposes.

Information Required
Demonstrate that there is no alternative to the proposed design for incorporation of the above ground incorporation of
the detention component with the bio retention basin in the format that requires retaining wall surrounds and
demonstrate that adequate access is provided for maintenance. Consider alternatives such as provision of water quality
treatment components throughout the car park landscaping and undergrounding detention components to maximise
the space available.

Response:
Retaining walls have been utilised for the bio retention / detention basin to reduce the overall area taken up by the
detention basin and maximise tree retention and carparking. The proposed bio retention / detention basin will also be
situated on private property and shall be maintained by the Proponent at all times, not Council, for this reason
retaining walls have been proposed.


K4277-0005-A                                         2 November 2018                                                Page 2 of 3

Page 10

Good Shepard Lutheran College                                                                                     Odyssey Consulting Group
Proposed Car Park                                                                                    Council Information Request Response
Lot 30 on SP170751                                                                                                       Project No: K4277
115 EUMUNDI NOOSA ROAD, NOOSAVILLE

During early stages of the concept design, an underground detention alternative was considered, however, it was
determined that an underground detention tank would be cost prohibitive to the project and therefore an open-air
basin would be more suitable for the site. The location of the bio retention / detention basin was chosen to minimise
changes in ground levels over the site. As the natural ground generally grades south west, this was the optimal location
to provide the basin to collect the majority of the site and treat stormwater runoff in a single location. An existing gully
pit is also nearby to the proposed location, this allowed the depth of the basin to be maximised to thereby reducing the
overall footprint of the basin.

The proposed bio retention / detention basin will be accessed via a maintenance ladder fastened to the wall of the
basin. Further details shall be provided at detailed design stage.

If you would like to discuss or require anything further, please do not hesitate to contact me.

Yours faithfully




ANDREW PILKINGTON | PROJECT ENGINEER
[email protected]


ATTACHMENTS
Attachment A       Odyssey Consulting Group, Conceptual Stormwater Management Plan (Ref: K4277-0002-C).
Attachment B       Odyssey Consulting Group, MUSIC Model (Ref: K4277- 20181018).




K4277-0005-A                                               2 November 2018                                                     Page 3 of 3

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.