Original source · versioned page text
12332_Council_Information Response_081118
Attached to the e-mail Response to Info Request (Letter, DA Form 1, Owners Consent, carpark plan, masterplan, pickup dropoff plan) - MCU18/0097.
Issue
The landscape code requires a minimum of 1x100L tree to be provided for every 4 car-parking spaces
and a minimum of 5m2 is to be provided for each tree. The proposal lacks landscaping amongst the
proposed car parking spaces.
Information Required
10. Provide an assessment of the proposal against the provisions of The Noosa Plan Landscape Code
Outcome 28.
Response
Refer attached amended landscape concept plan. The proposal will comply with specific outcome 28
by providing landscaping of the carpark designed to reduce the visual impact of the development;
provide for advanced canopy trees; ensure canopy trees are protected from vehicle damage; maximise
opportunities for infiltration of rainwater; and minimise contaminated runoff. A full assessment is
provided below.
Specific Outcome Probable Solution Response
Off street carparks
O28 Landscaping of carparking S28.1 One advanced canopy tree Complies
areas is designed to— (a minimum of 100 litres pot size) The site is not a town or village
a) reduced the visual impact of is provided— centre, a shopping centre or
the development; a) in towns and villages, shopping commercial area and therefore
b) provide for advanced canopy centres or commercial areas - for the applicable rate is 1 tree for
trees to shade vehicles and to every 4 carparking spaces; or every 6 car parking spaces. The
reduce reflected radiation; b) otherwise - for every 6 carpark proposes 149 spaces and
c) ensure canopy trees are carparking spaces; therefore 25 canopy trees are
protected from vehicle damage AND required. Notwithstanding, the
by providing adequate sized landscape plan proposes 39
garden beds; canopy trees, including the
d) maximise opportunities for retention of 9 existing trees.
infiltration of rainwater on-site;
and S28.2 A minimum area of 5m2 is Complies
e) minimise contaminated runoff provided around each canopy The total landscaped area is
entering the stormwater system tree, which is mulched and 1,379m2. All canopy trees will be
and watercourse. treated; located in a planting area
AND exceeding 5m2.
S28.3 Plants are grouped in Complies
mulched beds rather than using As shown on the landscape plan,
individual, evenly spaced trees trees will be grouped in beds with
and scrubs; shrubs and ground cover
AND planting.
S28.4 Semi-pervious pavement Complies
surfaces are used, such as grass The carpark will include
cell paving, to increase permeable paving within the
infiltration of rainwater and carpark within vicinity of existing
minimise contaminated trees to be retained.
runoff, including hydrocarbons,
entering the stormwater system
and watercourses;
AND
S28.5 Runoff from carparking Complies
areas is directed to landscaped Runoff is directed to a central
areas to minimise contaminate landscaped swale and bio
runoff, including hydrocarbons, retention basin before entering
entering the stormwater system into the stormwater system.
and watercourses;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original