Attached to the e-mail Response to Info Request (Letter, DA Form 1, Owners Consent, carpark plan, masterplan, pickup dropoff plan) - MCU18/0097.
that do not meet Specific Outcome O8. Additionally, it is not clear how the bioretention basin will be
accessed for maintenance purposes.
Information Required
14. Demonstrate that there is no alternative to the proposed design for incorporation of the above
ground incorporation of the detention component with the bio retention basin in the format that
requires retaining wall surrounds and demonstrate that adequate access is provided for
maintenance. Consider alternatives such as provision of water quality treatment components
throughout the car park landscaping and undergrounding detention components to maximise the
space available.
Response
Refer response from Odyssey Consulting within Attachment 1. This response discusses the various
options considered for stormwater management. The proposed bio basin design and location
represents the best outcome for the site to enable retention of existing vegetation, maximise the car
parking provision and minimise ongoing maintenance costs.
END INFORMATION RESPONSE
Part 3: Information Request has now concluded. We ask that you now provide details of adjoining
owners in order that we may commence the public notification of the application.
Should you have any questions with respect to the above, please do not hesitate to contact me direct.
Yours faithfully
PROJECT URBAN
Scott Sobey
DIRECTOR
Email: [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original