LATE RFI Attachment 6 - Stormwater Management Plan
The original of this document is very large (29.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Verification Certificate – SQIDEP VC
Reference Number: SA-2021/006/VC
• The Hydrochannel media is estimated to have an effective life of 1 year. It is
suggested that a 12 month maintenance cycle include replacement of the
media.
• Performance is contingent upon the installation being similar to that shown in
this trial. Alternative installations may result in different outcomes.
Independent Mr Andrew Allan, Afflux Consulting
Reviewers
Mr Damian McCann, Australian Wetlands Consulting
Accepted by
17th June 2021
Governance Panel
Accepted by
22nd June 2021
Stormwater Australia
Board
© Stormwater Australia 2021 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.