Skip to the record
Accept no substitutions.

Original source · versioned page text

LATE RFI Attachment 6 - Stormwater Management Plan

of 119

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (29.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                             Verification Certificate – SQIDEP VC
                                                                                             Reference Number: SA-2019/009/VC
                                 the cleaning of the Storm Sack and filter cartridge at regular intervals;
                              The life expectancy of the device and the media is unknown. In discussions with the
                                 manufacturer the testing is consistent to at least the 6 year mark. It is suggested that
                                 an estimated lifespan of both media and the whole device be written into any technical
                                 guidelines as the filter material will deteriorate over time;
                              The acceptance of these results is reliant on the installation being similar to that shown
                                 in this analysis. Alternative installations may result in different outcomes;
                              Designs & Installations of the SPELBasin® are in accordance with the SPEL Stormwater
                                 SPELBasin® Technical Guidelines; and
                              If the media is observed to not fully drain down to its lowest level within 2 hours
                                 following an event, investigate the media permeability, and if required replace media.
   Independent
   Reviewers             Mr Chris Beardshaw, Afflux Consulting

                         Mr Mark Liebman, Sustainability Workshop

   Accepted by
   Governance            24/9/2020
   Panel
   Accepted by
   Stormwater            25/9/2020
   Australia
   Board




                                                                                                                               3
© Stormwater Australia
Log in to download the original file

LATE RFI Attachment 6 - Stormwater Management Plan.pdf · 29.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.