LATE RFI Attachment 6 - Stormwater Management Plan

of 119

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (29.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
3. EXISTING LOCAL AREA DRAINAGE PATTERNS
The subject site has a 1.2M slope from the north-western corner (the corner of Elm Street and
Diamond Lane- high side) to the south-eastern corner of the subject site on Opal Street (low
side).
As seen in Figure 2; The subject site is located along a ridge line in the local catchment area-
being that the overland flow from the railway line falls towards the site, but then splits to travel
down Opal Street (and through the properties to the south) or travels to the north and down
Tewantin Road/Diamond Lane (and through the properties further north).
Run-off from the existing Motel/Caravan site was by both downpipes/driveway pits into an
underground piped stormwater system that connected into the existing underground piped
stormwater network. Landscaped areas also drained from the site as overland sheet flow,
exiting the site via the driveway onto Opal Street (south-east corner) or along Diamond Lane
(along the northern boundary).
Local underground stormwater infrastructure exists along Opal Street, commencing at the
corner with Elm Street. It is proposed to connect the subject site’s new underground
stormwater discharge point into the existing stormwater drainage pipe/pit near the proposed
site entry driveway near the south-eastern corner of the site on Opal Street.




Figure 2: Site Contour Plan (Source: Noosa Shire Council- IntraMaps, Dated: 27th Spet 2022)


  -5-         TMC Building Design Group
Log in to download the original file

LATE RFI Attachment 6 - Stormwater Management Plan.pdf · 29.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.