Council archive · source document
Compiled Approved Plans OPW16-0303.02 · OPW16/0303.02
Plans and drawings: the text below has words only, no drawings.
Very large file (19.5 MB): may take a few minutes to open.
LEGEND
Refer to Tree Planting Schedule be
co TREE SCHEDULE
LXX PROPOSED TREES/PALMS
low.
Pot Size/
eS wn Code Botanical Name Common Name Height Spacing Quantity
PALMS/TREES
= PHOENIX canariensis Canary Island Palm 500 Litre/7.0m_ | As shown 01
AC ARCHONTOPHOENIX cunninghamiana Bangalow palm 100 Litre/3.0m | As shown 24
*DR DELONIX regia Royal poinciana 100Litre/3.0m ‘As shown 03
*PO PLUMERIA obtusa Singapore Frangipani 100Litre/3.0m ‘As shown 12
PT PANDANUS tectorius Screw Pine 100 Litre/3.0m | As shown 14
DL DYPSIS lutescens Golden Cane Palm 300mm/2.0m As shown 22
ae cc CHAMAEDOREA cataractarum Cascade Palm 250mm/1.0m ‘As shown 08
BOWLING GREEN
FIGURE - EIGHT 50MM PLASTIC TIES STAPLED TO ALL
STAKES WITH 15mm FLATHEAD GALVANIZED STAPLES.
vere ‘ NOT PLACE MULCH AROUND THE TRUNK AND
. Oe . . MAINTAIN SPCARATION OF MULCH AND TRUNK TO
: 2 PREVENT COLLAR ROT. BACKFILL AROUND
wee / ROOTBALL WITH APPROVED TOPSOIL (75mm HIGH)
TO FORM 1500mm O ‘SAUCER’ FOR WATERING.
1.NO. 75mm PERFORATED FLEXIBLE AG PIPE FOR
WATERING IS COILED AROUND BASE OF TREE. TOP OF fNSHED ey
—__, |
T 1
75mm DEPTH FINE SHREDDED WOOD MULCH. DO e—________ |
* Tree to be planted as per Advanced Tree Planting Detail
BREAK UP SIDES AND BASE OF EXCAVATION TO 100mm. *—_Y
PLANTING HOLE SHALL BE WATERED PRIOR TO THE 4
SETTING OF TREES
“SET-OUT-POINT pS N
FOR PLANTING.
PIPE TO BE 50MM CLEAR OF MULCH. Hh \
7A
4 Ve
“i 7
cs
wees
TO PROMOTE LATERAL ROOT GROWTH,
THE PLANTING HOLE SHALL BE THREE
TIMES THE DIAMETER OF THE ROOTBALL
WHERE SPACE PERMITS. SLOPE ALL SIDES
AT 45 DEGREES.
3 No 75x75x2100mm LONG HARDWOOD
STAKES POINTED AT ONE END AND FREE
OF KNOTS, SPLINTERS AND CRACKS.
STAKES TO BE PAINTED BLACK. TWO (2)
APPLICATIONS PER STAKE. STAKES ARE TO
BE DRIVEN 900mm INTO THE GROUND,
CLEAR OF THE ROOT BALL.
NOTE : CONTRACTOR SHALL BE LIABLE
FOR ANY DAMAGES TO SERVICES DURING
THE LANDSCAPE WORKS.
TOP OF ROOT BALL LEVEL TO MATCH
PROVIDE A MINIMUM OF 150mm
APPROVED SITE TOPSOIL AROUND
C 100 Litre - ADVANCED TREE PLANTING DETAIL
po ” lie ae on 5 One. oe ™ ee conden ~. os RS Kare O™ | 1 SERVICE O1DL || (Cc
03: nes 3m 2.8m anata Pe AZ BM: eH oe ay, NOT TO SCALE
Sea Sal ES DECK) oe
MAIN DECK
ea
1?
FIREPLACE
as \
\ \
fo
<-3 <--
CLUBHOUSE
DANCE FLOOR
CLUB
— \ a KON
4 Ro INd0gR POOL
eee ' \ /
PO. “Sy \
Ly y \ J SN] sovains
: . \ \ ALLEY .
ae \ i
—— X \ yw : BOWLING 5
\: = LOUNGE
©
SERVERY CORRIDOR 2
camel \
COFFEE
a.)
ACCESS STORE
WC 4
a
|
LOADING
oS Dock
LOADING
Dock
OFFICE
O00}
loo}
KITCHEN
HAIR
DRESSER
STORE
DOO!
PORTE
COCHERE
ROOTBALL. LIGHTLY COMPACT
PROGRESSIVELY TO REMOVE ANY AIR
POCKETS. APPLY 'OSMOCOTE' FERTILIZER
(OR NEAREST APPROVED EQUIVALENT) AS
PER MANUFACTURERS INSTRUCTIONS
ADJACENT FINISHED SURFACE LEVEL (ie.
MULCH, GRANITIC SAND)
PLANTING HOLE DEPTH IS TO BE THE
SAME AS THE ROOTBALL
NOOSA COUNCIL
APPROVED PLAN
OPW16/0303 27 JAN 2017
REVISIONS PROJECT
REV. [DESCRIPTION BY DATE
Y. [DESCRIPTION —_ By | _DATE_ HAMILTON LANDSCAPE ARCHITECTS PTY LTD PALM LAKE RESORT - COOROY CLUBHOUSE
* Site Planning | Urban Design | Landscape Architecture COOROY
1 York Place, Carlton VIC 3053 - Australia | Tel: +61 03 9348 2800 DRAWING TREE/PALM PLANTING PLAN CLIENT PALM LAKES
E-mail: [email protected] | http://www.hla.net.au SCALE 1:200@A1 |DRAWN G.V.S JOB NUMBER 15-016
FILE NAME
15-016-Cooroy Clubhouse-REV A.02
DRAWING No.
TP-06
REVISION
A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Approved Plans OPW16-0303.02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 19.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.