Council archive · source document
Legal advice regarding Viridian submission · MCU18/0015
Attached to the e-mail Correspondence re prop made app with amended DA Form, Letter and Easement details MCU18-0015.msg.
Clause 11 in Easement L and clause 8 in Easements M and P merely postpone the time when the relevant rights can be exercised to a time after a development approval is granted. That is a different and separate consideration to a question about whether the development is consistent with the easement terms. Firstly, it is not suggested that the proposed use is inconsistent with Easements L, M and P and clearly such a suggestion could not be properly made out. Secondly, the postponing of the exercise of the rights in the easements is equally not inconsistent with the development because the use of the easements cannot occur until a development approval is given. Accordingly, there is no inconsistency between the proposed use of proposed Lot 3 (if the Development Application is approved) and the terms of Easements L, M and P. Yours faithfully CONNOR O’MEARA WO. 0 “Liability limited by a scheme approved under professional standards legislation” Advice (00009799)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Legal advice regarding Viridian submission.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.