Skip to the record
The gold standard in government transparency.

Council archive · source document

Appendix C - Code Assessment · RAL24/0003

of 37

Text shows just the words. Original shows the document exactly as it was published.

Reconfiguring a Lot Code



                                                                    the requirements of Council’s Planning Scheme Policy PSP6
                                                                    Engineering design standards – Roads, drainage and earthworks.

                                                                    Editor's note- Reference should be made to the Queensland
                                                                    Government's Development Assessment Mapping System to
                                                                    confirm which are state-controlled roads or limited access roads.




Movement Network Table 9.5.1.3 Criteria for assessable development (part)


Performance outcomes                                                Acceptable outcomes                                                     Assessment
Growth Management
Movement Network

Traffic                                                             No acceptable outcome provided                                          PO14 – Complies
PO14                                                                                                                                        Traffic generated by the additional lot is within the capacity of
Traffic generated by the development is within the acceptable       Editor’s Note— Further detail on traffic and the road network is
capacity of external roads and does not have an adverse impact      addressed in Part 9.4.8 Transport Code                                  Tallowwood Drive.
upon the functioning of the road network.                           underground.



Roads and Pathways                                                  AO15.1                                                                  AO15.1 – 15.4 – Not Applicable
PO15                                                                Where involving the construction of a new road, road planning           The proposed development does not involve the creation of any
Development involving the creation of new roads and pathways        and design supports the hierarchy and functional aspects                new roads.
ensures infrastructure—                                             identified in Council’s Planning Scheme Policy PSP6 on
                                                                    Engineering design standards – Roads, drainage and earthworks.
     a)   provides convenient, safe and efficient movement for
          all modes of transport between land use activities;       Editor’s Note— Further detail on road and pathway networks is
     b)   prioritises pedestrian movement and bicycle use over      provided in Part 9.4.8 Transport Code
          vehicle movements;
     c)   facilitates efficient, safe and accessible bus services   AO15.2
          that connect to existing and future public passenger      The street layout is generally rectilinear and does not rely on culs-
          transport facilities;                                     de-sac, or where the use of a cul-de-sac is unavoidable because
     d)   provides through roads and minimises the use of culs-     of the natural features of the site, it does not exceed a length of

Used in these records

About this file

File size
471 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix C - Code Assessment.pdf · 471 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.