response to information request - 22 Grant · MCU22/0172
8. Provide additional detail on the proposed driveway and crossover. The detail
must be prepared by a suitably qualified person (RPEQ – Registered
Professional Engineer of Queensland) and include, but not be limited to:
a. a design generally in accordance with RS-049, RS-050 and any
associated addendum;
b. levels and grade of the access driveway;
c. a longitudinal section extending from the centre of the formation
along Grant Street to the finished floor level of the proposed garages;
and
d. demonstrate that a B99 vehicle will not scrape or bottom out while
entering or exiting the driveway.
9. Provide additional detail demonstrating how trip hazards will be eliminated
within the road reserve due to the construction of the proposed driveway
crossover. The amended plan must be prepared by a suitably qualified
person (RPEQ – Registered Professional Engineer of Queensland) and
include, but not be limited to:
a. the full extent of the transition to the adjoining areas of verge.
b. Please note that Council is unlikely to support private retaining
structures within the road reserve
10. Provide an amended plan that demonstrates a 1.5m wide footpath will be
constructed along the frontage of the subject site that connects to the
adjoining existing footpaths. The amended plan must be prepared by a
suitably qualified person (RPEQ – Registered Professional Engineer of
Queensland).
11. Provide additional information regarding the construction methodology of
the proposed stormwater pit and its’ integration into Council’s existing
stormwater infrastructure network. The detail should be prepared by a
suitably qualified person (RPEQ – Registered Professional Engineer of
Queensland) and include, but not be limited to:
a. demonstrate the extent of works required to remove the existing pit,
stormwater pipe and any kerb and reinstate the road and associated
kerb;
b. demonstrate the extent of works required to install the proposed
stormwater pit and associated stormwater pipes, include levels
(surface and invert) and grades; and
c. demonstrate how the proposed stormwater pit will integrate into
Council’s existing stormwater infrastructure.
12. Provide comment certifying that any potential additional catchment volume
from the uphill property (11 Katharina Street) has been accounted for during
the preparation of the Stormwater Management Plan for the subject site.
14. Provide an amended Turning Path Plan demonstrating that vehicles are able
to enter the proposed garages and exit the site in a reverse gear (or forward
gear if achievable) without colliding with any future landscaping or
structures. The additional detail must be prepared by a suitably qualified
person (RPEQ – Registered Professional Engineer of Queensland).
Recor provides amended plans and detailed response to each of the engineering
responses raised above. This includes the provision of a 1.5m footpath matching into the
contours and driveway levels demonstrated in long section, with no retaining required in
the road reserve. Additional stormwater detention is provided with a tank under the
driveway and detailed specific comment about overland flow and existing infrastructure.
Page 5 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
response to information request - 22 Grant.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.8 MB (small file)
- File type
No other editions are linked here.